HomeMy WebLinkAboutS-1038 Staff AnalysisOctober 18, 1994
ITEM NO. • 10 _ _ FILE ._ D : _5-_1M
DAME: PARK PLACE BAPTIST CHURCH -- SITE PLAN REVIEW
LOCATION: On the north side of Mabelvale Pike, approximately 300
feet west of University Ave.
DEVELOPER:
CONTRACTOR:
ED STEPHENSON, PASTOR VALLEY VIEW CONSTRUCTION CO.
PARK PLACE BAPTIST CHURCH 7307 Southwest Dr.
5630 Mabelvale Pike Jonesboro, AR 72401
Little Rock, AR 72209 932-6440
565-7650
AREA: 3.26 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: C-3 PROPOSED USES:
PLANNING_DISTRICT: 10
_QEN5U3 TRAQT : 20.01
VARIANCEREQUESTED: None
TATEMENT OF PROPAL:
Church Family Life Center
The applicant, Park Place Baptist'Church;-proposes development of
a Family Life Center on the Church campus, and on which a portion
of the Churches parking facility is currently situated.- A 2-
level facility is planned, with the southern 1/3 of the building
being.at ground level at the south end, and the northern 2/3 of
the building being at ground level at the north end.- The upper
level is proposed to be used for a game room; the lower level for
a gymnasium. Relocation of the existing vehicle ramp in the
parking lot and repair to the existing parking lot is proposed,
although no additional parking area is included in the proposal.
The covered walkway, extending from the existing Church facility
along the parking area to the west, is to be remodeled and
extended to cover the new walkway to the new Family Life Center.
A. PROPOSAL/REOUEST:
Planning Commission approval is requested for a site plan
for the addition of a Family Life Center to the grounds of
the Park -Place-Zaptrst--Church. -A -60 -foot - wide by 110 foot
long, 2-level building is proposed. The floor level of the
southern 1/3 of the building is to be set at the upper level
and is to be at grade at the south end of the building.
This area is proposed to be used for a game room. The floor
level of the northern 2/3 of the building is to be set at
the lower level and is to be at grade at the north end of
October 18, 1994
SUBDIVISION
ITEM N I n zn FTLE _I
the building. This area is to be used for a gymnasium. The
relocation and reconstruction of to the vehicle ramp in the
existing parking area is to be accomplished as part of the
project. Repairs to the existing parking areas are
included; however, no additional parking area is to be
provided. --W&lks -are - to be -extended to the new facility from
the existing Church building, and an existing covering over
the walkway is to be modified to cover the walk to the new
building.
B. EXISTING CONDITIONS:
The -existing Church building faces Mabelvale Pike, and lies
along the east property line of the Churches property. To
the west of the Church building, and extending northward
along the west property line is the parking area for the
Church. The portion of the parking area immediately to the
west of the Church building,.and extending westward to the
west property line, is at grade with Mabelvale Pike. The
portion of the parking lot extending northward along the
west property line is approximately b feet lower than the
upper grade along Mabelvale Pike. There is a concrete ramp
by which vehicles move between the two levels of the parking
lot.
There are commercial uses immediately to the east of the
Church site, with both C-4 and C-3 zoning districts existing
in this area. Across Mabelvale Pike to the south -is C-4
zoned -property. To the west -is-residential property zoned
R-2. The Church property includes the home at the southwest
corner of the site, at__the corner of Greenway Dr. and N.
Meadowcliff Dr.
C. ENGit ERING/UTILITY CpMMENTS:
Public Works comments that, prior to the issuance of a
building permit, a floodplain development permit must be
completed and a sketch grading and drainage plan must be
submitted. The Building Code review remarks previously
furnished to the applicant are applicable.
Little Rock Water Works comments that the Fire Department
will review this project to determine whether additional
public and/or private on -site fire hydrants will be
required.
Little Rock Was tewater._Ut11ity... comments --that---sewer is
avaiiable,_ and that providing service will cause no adverse
effect on the wastewater system.
K
October 18, 1994
SUBDIVISION
ITEM O.• 10 (Continued) FILE -1
038
Arkansas Power and Light Co. comments that a 15 foot wide
easement will be required along the route of the existing
power line entering the existing facility, and to provide
service to the new building. An easement will be required
along th-e - west -property line.-
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. approved the submittal
without comment.
The Little Rock Fire Department approved the submittal
without comment.
Landscape review comments that the existing building is
28,006 square feet in area, and the new building is 12,600
square feet in area. This represents a 45% increase in
size, requiring a 45% increase in landscaping. The
applicant is to verify with Bob Brown, the staff person
responsible for landscape review, the requirements for
landscaping and for buffering.
D. 1S$999/LEGALITECHNICALIDESIgN:
Section 31-13 of the Subdivision Regulations requires site
plan review for developments involving the construction of 2
or more -buildings on a lot._._The-proposed development
involves construction of 2 buildings on the lot; therefore,
site plan review pursuant to the Subdivision Regulations is
required.
A total of 125 parking spaces is required for this project.
The applicant states that there are more than this number;
therefore, the parking requirements are met.
The Ordinance requires the following information, omitted on
the plan provided to date, be furnished as part of the
review process: a complete site plan showing all buildings
and structures, parking, points of ingress/egress,
utilities, existing and proposed on -site fire hydrants,
street right-of-way dimensions, and areas within the
development devoted to landscaping. The site plan is
deficient, and a complete site plan with all required
information must be submitted.
The nature of the parking lot, outside lighting, and
security lighting have not been addressed. Whether outside
lighting will, or has, an effect on the residential
neighbors to the west has not been addressed.
3
October 18, 1994
SUBDIVISION
ITEM NO.: 1 ontin ed FILE NO.: 5-1038
E. ANALYSIS•
The site is appropriately zoned and there is adequate space
for the proposed building. The requirements for parking are
met. The only questions to be resolved are the adequacy of
landscaping and whether there is need for additional land
use buffering, and the issue of outside/parking lot/security
lighting. The remaining deficiencies can be easily
remedied.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
applicant furnishing the required complete site plan and
meeting the requirements cited.
SUBDIVISION_COMMITTEE COMMENT:
(SEPTEMBER 29, 1994)
Rev. Ed Stephenson, pastor of the Church, was present. Mr. Ron
Hogan, with Valley View Construction Co., the contractor for the
proposed project, was present.
Staff outlined the proposal, and the Subdivision Committee
members reviewed with the'. applicant and contractor the items
contained in the discussion outline. Rev. Stephenson and Mr.
Hogan indicated that revised and completed drawings were
available, and presented the new site plan to the Committee. It
was noted that the revised drawing appeared to remedy the
deficiencies noted. The Committee forwarded the item to the full
Commission for review.
PLANNING COMMISSION ACTION: (OCTOBER 18, 1994)
Staff reported that the applicant needed to address two issues:
the land use buffer issue along the residential property line on
the west; and, the lighting of the parking lot along the west
property line and of the building on the west face of the new
building.
Rev. Ed Stephenson, the pastor of the church, and Mr. Ron Hogan,
with Valley View Construction Co., the contractor on the project,
were present. Mr. Hogan addressed the issues to be resolved: He
said that he would meet with Bob Brown, Landscape review staff
person, and would provide the needed landscaping and land use
buffering. He said that there would be no other lighting on the
west face of the building than necessary lights at the doors to
the building. He said that there would be no additional parking
lot lighting than is currently in place. Staff then recommended
approval of the site plan, as amended.
N
October 18, 1994
SUBDIVISION
ITEM NO.: 10 (Continued) _ - FILE NO S-1038
A motion was made and seconded to approve the site plan, and the
motion passed with the vote of 10 ayes, 0 nays, 1 absent, and
0 abstentions.
5