HomeMy WebLinkAboutS-1035 Staff AnalysisFILE NO.: 5-1035
NAME: CHENAL CENTER -- SITE PLAN REVIEW
LOCATION: At the northwest corner of Chenal Parkway and Autumn
Road
DEVELOPER:
David H. Pickering
PICRERING, INC.
11621 Rainwood Dr.
Little Rock, AR 72212
227-6376
AREA: 2.41 ACRES
ZONING: C-3
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
STATEMENT OF PROPOSAL:
ENGINEER:
Joe White
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
NUMBER OF LOTS: 1 FT. NEW STREET: 0
PR PO ED USE : Commercial
None
The applicant proposes development of a 2.41 acre tract for
commercial purposes. An "L"-shaped building lies along the north
and west property lines. It is 1-sotry and contains 26,480
square feet. The second building lies at the Chenal Parkway -
Autumn Rd. intersection, is single -story, and contains 3,504
square feet. Parking for 120 vehicles is proposed. Access to
the site is to be gained from three drive approaches from Autumn
Rd. There is one exit provided onto Chenal Parkway. The
applicant proposes to construct the west one-half of Autumn Rd,
to construct sidewalks along both the Chenal Parkway and Autumn
Rd. frontages of the site, and to contribute 1/4 the cost of a
traffic signal at the Chenal Parkway -Autumn Rd. intersection.
A. PROPQSAWREQUEST:
Planning Commission review of a proposed site plan is
requested for the development of a 2.41 acres tract for
commercial purposes. The site is to consist of two
buildings, one containing 26,480 square feet; the other,
3,504 square feet. Parking for 120 vehicles is provided.
The required improvements for constructing one-half of
Autumn Rd., and construction of a sidewalk on both Chenal
Parkway and on Autumn Rd. are proposed. The applicant
states that he will pay 1/4 the cost of the needed traffic
signal at the Chenal Parkway -Autumn Rd. intersection.
FILE N -103 (Cont.)
B. EXISTING CONDITIONS:
The site is currently undeveloped. It has been previously
cleared, and a depressed area in the site has had fill
material placed in it.
The site is zoned C-3, and is part of the tract previously
considered for the Lowe's PCD development. Immediately to
the north and west is R-3 zoned property, with scattered
single-family home sites north of the site along Autumn Rd.
Across Autumn Rd. to the east is a PCD site recently
approved for the Chenal Village shopping center. To the
south, across Chenal Parkway, is the PCD site for the Home
Quarters business. Cater -corner across Chenal Parkway, to
the southeast, is the Pinnacle Point hospital in a C-3 zoned
tract.
C. ENGINEERING/UTILITY COMMENTS:
Public Works comments that the plan will have to be revised
to eliminate the curb cut on Chenal Parkway, and to
eliminate 1 of the curb cuts on Autumn. Additional right-
of-way must be provided on Autumn Rd. to Master Street Plan
requirements, and to match the proposed improvements on the
east side of Autumn Rd. Prior to the issuance of the
building permit, complete grading and drainage plan must be
provided.
Water Works reports that additional fire hydrants may be
required. These would be installed and paid for by Water
Works, but their installation should be coordinated with the
project contractor. Water Works should be contacted
regarding meter size and location.
Wastewater reports that sewer is available on the east side
of Autumn Road. It is the responsibility of the Developer
to assure themselves that this property can be served from
the existing sewer main.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require easements.
Landscaping review reports that the areas set aside for
buffers along Chenal Parkway, Autumn Road, and along the
west perimeter are below minimum ordinance requirements.
The northern land use buffer exceeds the Ordinance of 161.
The full buffer requirement along Chenal is 16' (minimum: 10
1/21). The full buffer along Autumn Rd. is 13' (minimum:
91). Along the west perimeter of the site, the full buffer
requirement is 15 1/2' (minimum: 101). Areas provided on
the plan submitted average 5' to 8' in width, with the
K
FILE -N -1 (Cont.)
exception of a 26' wide section along Autumn Rd. adjacent to
the building.
A minimum of 60% of the land use buffers should remain in
their natural state. The method to be used to protect these
buffers during construction should be defined. A 6' high
opaque screen will be required as part of the land use
buffers. This screen can be a wooden fence with its
structural supports facing inward, or be dense evergreen
plantings.
A total of 6% of the interior vehicular use area must be
landscaped. The building landscape requirement calls for an
average 3' wide landscape strip between the public parking
areas and the building. Curb and gutter or another approved
border will be required to protect landscaped areas from
vehicular traffic.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
The Ordinance will require 95 parking spaces; 120 are
provided.
Public Works has commented that both the exit onto Chenal
Parkway and one of the drive approaches on Autumn Rd. must
be eliminated. Landscape review commented that there are
deficiencies in meeting the landscaping requirements.
E. ANALYSIS•
The basic layout of the site plan meets the requirements;
however, there are concerns
Landscape review which must
been provided with revised
concerns.
F. STAFF REG_pMMENDAT_IgNS
expressed by Public Works and
be addressed. Staff has not
drawings which address the
Staff recommends approval of the site plan, subject to the
applicant satisfactorily addressing the Public Works and
Landscape review comments.
SUBDIVISION COMMITTEE COMMENT:
(AUGUST 18, 1994)
Mr. David Pickering, the proposed developer, and Mr. Joe White,
the project engineer, were present. Staff presented an overview
of the proposed project and the request. Mr. White reviewed with
the Committee the proposed site plan and the comments contained
in the discussion outline. The Committee asked Mr. White if he
could adjust the plan to comply with the Public Works staff
comments, and Mr. White said that he would meet with the
Engineering staff to work out the problems. The Committee
forwarded the request to the Commission for the public hearing.
3
FILE NO.: 5-1035 (Cent.) — —
PLANNING COMMISSION ACTION: (SEPTEMBER 6, 1994)
Mr. Joe White, with White-Daters & Associates, was present as a
representative of the developer.
Staff outlined the proposal, and indicated that the site plan
proposes one entrance drive onto Chenal Parkway, one service
drive at the north property line onto Autumn Rd., and 2 entrances
to the parking area from Autumn Rd. Staff indicated that the
Public Works staff, in their review of the site plan, had
reported that: 1) the entrance to Chenal Parkway would not be
acceptable; and, 2) that the regulations, passed in January of
1994, limit access points to a commercial development to one
access point to each 300 feet of lot frontage, and that the one
service drive and 2 access points to the parking area would be
limited to the one service drive and one other access point.
Staff reported that the applicant had agreed to eliminate the
access point to Chenal Parkway, but wished to retain the 3 access
points along Autumn Rd. This, staff indicated, would require a
variance from the regulations from the Board of Directors.
Mr. Joe White reiterated that the developer had agreed to
relinquish the access point to Chenal Parkway, but that the one
service drive and 2 access points along Autumn Rd. are vitally
important. Mr. White reported that the developer has agreed to
providing 25% of the cost of the needed traffic signal at the
Autumn Rd.-Chenal Parkway intersection; has dedicated right-of-
way along both Chenal Parkway and Autumn Rd., even though the
Board of Directors does not require the dedication along Chenal
Parkway; will make the required improvements on Autumn Rd.; and,
will be required to construct a large drainage structure on the
property. He said that the developer feels that the 2 access
points to the parking area are vital in order to make the
development of the site viable, and cannot compromise on them.
He cited examples, the new Sonic Drive-in down the street, for
example, which have much less frontage, yet have 2 driveways. He
said that the Chenal village across Autumn Rd. has a service
drive, plus 2 entrances, one on Autumn Rd. and one Financial
Center Parkway, yet Chenal Center, with almost as much frontage,
would be limited to one drive access point and the service drive.
He asked that the Commission recommend to the Board of Directors
approval of the 3 access points to Autumn Rd.
Bill Henry, City Traffic Engineer, responded that one curb cut
for public ingress and egress to the development is ample.
Commissioner Walker said that, the larger the development, the
more traffic flow can be controlled with an internal circulation
system. This development, however, is substantially smaller than
those examples, the Wal-Mart site, for example, where a single
entrance point is provided, and where internal circulations can
4
FILE NO.: $-1035 (Cont
be provided. He indicated that he can see that the developer
would be concerned that the corner building would be isolated
without the additional access point to the property.
Mr. Henry said that there would be a problem with vehicle
stacking and access to the site when the Autumn Rd.-Chenal
Parkway signal is installed, and as traffic increases on Autumn
Rd.
Commissioners Woods and Putnam indicated that they could not see
how limiting the access points is beneficial; that all that is
accomplished is stacking vehicles on the site, or causing people
waiting to turn into the site to be stacked on the street waiting
for the traffic to clear.
Mr. Henry responded that limiting access points limits points of
conflict, and is, therefore, safer.
Chairperson Chachere clarified that the site plan needed to be
approved subject to the Board of Directors approval of a variance
of the number of access points on Autumn Rd. A motion was then
made to approve the site plan, with a recommendation to the Board
of Directors for approval of the requested variance for the
3 access points on the Autumn Rd. frontage of the site. The site
plan and recommendation were approved with the vote of 8 ayes,
1 nay, 1 absent, 0 abstentions, and 1 open position.
5