HomeMy WebLinkAboutS-1026-B Staff AnalysisApril 27, 2017
ITEM NO.: 1
NAME: Lot Z-2-A-R Little Rock Industrial District Replat
LOCATION: Located at 2400 West 65th Street
DEVELOPER:
Garrett Partners, Inc.
174 Cornerstone Court
Hot Springs, AR 71913
ENGINEER:
McGetrick Engineering
11601 Bass Pro Parkway
Little Rock, AR 72210
AREA: 1.36 acres NUMBER OF LOTS: 1
FILE NO.: S-1026-B
FT. NEW STREET: 0 LF
WARD: 2 PLANNING DISTRICT: 13 — 65th Street East CENSUS TRACT: 40.01
CURRENT ZONING: 1-2, Light Industrial District
VARIANCEIWAIVERS: A variance to allow a reduced platted building line (Section
36-320) along West 65th Street — 50-feet required, 35-feet proposed.
A. PROPOSALIREOUESTIAPPLICANT'S STATEMENT:
The applicant is proposing a replat of an existing platted lot to allow the
previously platted building lines to be reduced. The original plat included building
lines which varied along the 1-30 frontage, a 50-foot building line along West 65th
and Aerie Streets. The plat is proposed with a 30-foot platted building line along
the 1-30 frontage, a 35-foot platted building line along West 65th Street and a
35-foot platted building line along Aerie Street. There are no other modifications
proposed with the replat request.
B. EXISTING CONDITIONS:
The site was previously used as a gas station, which has been vacant for a
number of years and is currently in a state of disrepair. Across the street is a
vacant restaurant building, a hotel which appears to operate as an extended stay
hotel and a number of commercial and industrial uses located to the south.
April 27, 2017
SUBDIVISION
ITEM NO.: 1 (Cont.)
FILE NO.: S-1026-B
North of the site is a property containing a building which is owned by a fraternal
organization. East of the site is property owned by the applicant and is currently
operated as mining.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners along with the Upper Baseline Neighborhood
Association and Southwest Little Rock United for Progress were notified of the
public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Engineering comments may apply at time of building permit or with future
development.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Sewer available to this site.
Entergy. Entergy Distribution does not object to this re -plat proposal. A three
phase power line exists along the northern edge of the 100 foot AP&L easement
depicted on the submitted drawing. This power line can be utilized to provide
power to any future development on this property. However, the replat also
involves an existing Entergy Transmission power line and easement. Should the
property develop, then contact Entergy Transmission well in advance to discuss
the future use of its easements and contact Entergy Distribution in advance to
discuss future service requirements, new Distribution facilities locations and
adjustments to existing Distribution facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: The existing 10-foot Central Arkansas Water Easement
needs to be added to the plat. Contact Central Arkansas Water for additional
information.
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning: No comment.
2
April 27, 2017
SUBDIVISION
ITEM NO.: 1 (Cont.)
FILE NO.: S-1026-B
Rock Region Metre: The site is located on Rock Region Metro Route #23, the
Baseline/Southwest Route.
F. ISSUESITECHNICAL/DESIGN:
Buildin Cade: No comment.
Planninq Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (April 5, 2017)
Mr. Pat McGetrick was present representing the request. Staff presented the
item stating there were few outstanding technical issues associated with the
request. Staff stated the applicant was seeking a replat to reduce the platting
building lines for the lot. Staff requested Mr. McGetrick provide the proposed bill
of assurance.
Public Works comments were addressed. Staff stated engineering comments
would be provided at the time of building permit. Staff stated radial dedications
of right of way was required at the intersections of the abutting streets.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion. The
Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plat to staff addressing the technical issues
associated with the request raised at the April 5, 2017, Subdivision Committee
meeting. The applicant has provided staff with the proposed bill of assurance for
the plat.
The request is to allow a replat of an existing platted lot to allow the previously
platted building lines to be reduced. The existing plat contains a 50-foot platted
building line along West 65th Street and Aerie Street and a platted building line
which varies along the 1-30 frontage. The plat is proposed with a 30-foot platted
building line along the 1-30 frontage, a 35-foot platted building line along West
65t" Street and Aerie Street.
To allow the building line as proposed requires a variance from the current
zoning district. The variance is from Section 36-320 to allow the building line
0
April 27, 2017
SUBDIVISION
ITEM NO.: 1 (Cont.)
FILE NO.: S-1026-B
along West 65t" Street to be reduced from 50-feet as typically required in the 1-2,
Light Industrial Zoning District to 35-feet as proposed by the applicant.
Staff is supportive of the applicant's request. The applicant is seeking a replat to
allow the future development of the site. There is a 100-feet Entergy Easement
running through the site which limits the developable area of the site. The
applicant is proposing future construction of a building to support an 1-2, Light
Industrial user. There are no other modifications proposed with the replat
request. Staff feels the request is appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request from Section 36-320 to allow
a reduced platted building for the lot.
PLANNING COMMISSION ACTION: (APRIL 27, 2017)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request from Section 36-320 to allow a reduced platted building for the lot. There was
no further discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 11 ayes, 0 noes and 0 absent.
C!
ITEM NO.: 1. S-1026-B
NAME: Lot Z-2-A-R Little Rock Industrial District Replat
LOCATION: located at 2400 West 65th Street
Plannina Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract list,
notice form with affidavit executed and proof of mailing. The notice must be mailed no
later than April 12, 2017. The Office of Planning and Development must receive the proof
of notice no later than April 21, 2017.
2. Complete the information sheet and variance request form for the application request.
3. Provide the bill of assurance for the subdivision and for the proposed replat.
Variance/Waivers: A variance to allow reduced platted building lines (Section 36-320) along
West 65th Street — 50-feet required, 35-feet proposed.
Public Works Conditions:
1. Engineering comments may apply at time of building permit or with future development.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Sewer available to this site.
Entergy: Entergy Distribution does not object to this re -plat proposal. A three phase power
line exists along the northern edge of the 100 foot AP&L easement depicted on the submitted
drawing. This power line can be utilized to provide power to any future development on this
property. However, the re -plat also involves an existing Entergy Transmission power line and
easement. Should the property develop, then contact Entergy Transmission well in advance
to discuss the future use of its easements and contact Entergy Distribution in advance to
discuss future service requirements, new Distribution facilities locations and adjustments to
existing Distribution facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: The existing 10-foot Central Arkansas waster Easement needs to
be added to the plat. Contact Central Arkansas Water for additional information.
Fire Department: No comment.
ITEM NO.: 1.
S-1026-B
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro:
Building Code: No comment.
Planning Division- No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the