Loading...
HomeMy WebLinkAboutS-1020 Map 9, CERTIFICATE OF SURVEYING ACCURACY CERTIFICATE OF OWNER 1 IH/ C-Or d '..4� 47 . I, Joe D. White, hereby certify that this plat correctly represents a boundary survey made by me and boundary markers shown hereon actually exist and their location, type and material are correctly shown. Date of Execution Joe X. White Registered Land Surveyor No. 534, Arkansas We, the undersigned, owners of the real es- tate shown and described herein, do hereby certify that we have laid off, platted, and subdivided, and do heia"y lay off, plat, nd subdivide said real est to in accordansith this plat. LjL2� ✓�C� EeC. Rate of Execution 17 a D.R. Page L•�C, Aig� AMOS Address Instrument No. &3-G8ro5 CERTIFICATE OF ENGINEERING ACCURACY CERTIFICATE OF FINAL APPROVAL I, Timothy E. Deters, hereby certify that this plat correctly represents a plan made by me, Pursuant to the Little Rock Subdivision Rules and that the engineering requirements of the and Regulations, and all of the conditions of Little Rock Subdivision Rules and Regulations approval having been completed, this docu- have been complied with. ment is hereby accepted. This certificate is hereby executed under the authority of said �aQ Rules and Regulations. J, � D to of Execution Timothy E. Daters '�5 "m "` Registered Professional to A6f E ecution Little Rock Planning Engineer No. 5033, Arkansas Commission - Or CERTIFICATE OF RECORDING C -This document, number filed for record ? -0 19_ Plat Book C. Pages. flame STATE OF b:AS LAN SJ �1yI ATf OFF. AR.h,INSAS REGISTERED PI10FESS10NAL ENGINEER o . No.5033 �E. - Le�B,� r.�eo;Z-rheWt_ff 270 `ten � �`� � P�; K r;G'c� t •c�r_r To T• � r. -� ry' ! ,,:,;: f�. y C 53`7 40 O 4n BD 12,0