HomeMy WebLinkAboutS-1010-E ApplicationCity of Little Rock
Planning and Development
Filing Fees
Date In , 20(0
Annexation
$
Board of Adjustment
$
Cond Use Permit/T UP
$
Final Plat
$
Planned Unit Dev
$
Preliminaiy Plat
$
Special Use Permit
$
Rezoning
Site Plans
$
Street Name Change
$
Street Name Signs
Number at ea
$
Public Hearing Signs
Number -at -ea
$
Total
$
File No
--------------
Location,
Applicant YL-I �,
By ,�
Page 1 of 1
James, Donna
From: Blake.Weindorf@CArkW.com
Sent: Thursday, August 26, 2010 12:58 PM
To: James, Donna
Cc: mcgetrick2@sbcgloba1.net
Subject: APPLE BLOSSOM SUB PH 3A Final Plat
NO OBJECTIONS to APPLE BLOSSOM SUB PH 3A Final Plat as submitted by McGetrick.
Please let me know if I may be of further assistance.
Thanks,
Blake F. Weindorf, P.E.
Senior Engineer
Central Arkansas Water
501.377.1224
501.210.4980 (fax)
blake.weindorf@carkw.com Before you print this email think about the environment.
8/26/2010
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
NAME -APPLE BLOSSOM III -A
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist
ADDRESSING SPECIALIST'S REPORT
Date:
I have rev' ed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REP T
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage and street lights.
Indicate the number of street signs ordered for this plat for billing to developer
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Traffic Engineer Date: �— 0 O
CIVIL ENGINEER REPORT
I havereviewedthe file for this matter and find that:
1/ The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied. f
Civil Engineer I/II Date: ! g fa
?Eo— PKWV6 e—A L 4"..' KNis.'Y Cc]S5� ` 65v..,.j9 S^7�7
SURVEYOR'S REPORT 'T'6 PA-Tc �l I.�r�sc g+E pAuFt] G,.] 7'jo�►V��rT Twbr L.,.� IF�ST.
I have reviewed the plat and find that:
V All requirements for final plat approval have been satisfied.
Surveyor Date: f�— Z 3 610
MANAG APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfireed.
.. Date:
Design Review Engineer/Civil Engineering Manager
August 23, 2010
James, Donna
From:
Floriani, Vince
Sent:
Wednesday, September 08, 2010 10:16 AM
To:
'craig jeup'
Cc:
'MCGETRICK MCGETRICK'; James, Donna
Subject:
RE: Street Repair Letter
I spoke with Redstone Construction today and was promised the completion of the street
patch would be completed at the latest by Friday, September 10, 2010.
With that information, Public Works signed off on the final plat and it has been delivered
to Donna James, Planning Department Subdivision Administrator. She can be contacted at
501-371-6821 or by email about receiving her sign off.
Vince Floriani, P.E.
Design Review Engineer
Little Rock Public Works
501-371-4817
-----Original Message -----
From: craig jeup [mailto:cjeup@comcast.net]
Sent: Tuesday, September 07, 2010 1:35 PM
To: Floriani, Vince
Cc: 'MCGETRICK MCGETRICK'
Subject: RE: Street Repair Letter
Below is your email clearly stating the letter from Redstone is sufficient
for final approval of the plat.
-----Original Message -----
From: Floriani, Vince [mailto:VFloriani@littlerock.org]
Sent: Friday, August 27, 2010 11:08 AM
To: craig jeup
Cc: bjparent@comcast.net; MCGETRICK MCGETRICK; Dexter Doyne; Philpott, Steve
Subject: RE: Street Repair Letter
Mr. Jeup,
The letter provided is sufficient for approval of the final plat pertaining
to the repair to the existing City street. I am told the plat is still
being held by Traffic Engineering due to a streetlight issue.
Vince Floriani, P.E.
Design Review Engineer
Little Rock Public Works
501-371-4817
-----Original Message -----
From: craig jeup [mailto:cjeup@comcast.net]
Sent: Wednesday, August 25, 2010 11:11 AM
To: Floriani, Vince
Cc: bjparent@comcast.net; 'MCGETRICK MCGETRICK'; 'Dexter Doyne'
Subject: FW: Street Repair Letter
Mr. Floriani,
Please confirm that the attached letter from Redstone Construction
provides
the City of Little Rock the assurances necessary for final plat approval
for
the current phase of the Keown Homes Development.
1
Thank you,
Craig Jeup
JPM Group LLC
4110 Southpoint Blvd.
Suite 206
Jacksonville, FL 32216
(904) 279-0132 Office
(904) 513-9227 Fax
-----Original Message -----
From: kurt cosse [mailto:kurt.cosse@redstone-cg.com]
Sent: Wednesday, August 25, 2010 11:46 AM
To: craig jeup
Subject: Street Repair Letter
Please see attached.
Kurt Cosse
Project Manager
RedStone Construction Group, Inc.
505 West Dixon Road, Little Rock, AR 72206 Mobile (501) 539-2716 Phone
(501)374-1557 Fax (501)374-8314 kurt.cosse@redstone-cg.com
-----Original Message -----
From: Toshiba 232 Copier [mailto:toshiba@redstone-cg.com]
Sent: Wednesday, August 25, 2010 11:41 AM
To: kurt cosse
Subject: Scanned from MFP-05138538 [Kurt—Cosse] 08/25/2010 10:40
Scanned from MFP-05138538.
Kurt Cosse
Date: 08/25/2010 10:40
Pages:l
Resolution:200x200 DPI
Please see attachments.
2
McGETIUCK & McGEMCK, iNc
ENGINEERS - PLANNERS - SURVEYORS
10 Otter. Creek Court, Suite A
j Little ]dock, Arkansas 72210
(PHONE: 501-455-8899 FAX: 501-455-8898
FA
IDA E: V 2 ,�,.z,,1,:
0:
FROM:
PAGES:
TES:
j•d doo:90 01 0a des
FW: final plat apple subdivision phase 3a - 'att.net Mail' Page 1 of 1
��IICAD!, MAID.
ctas,,c
FW: final plat apple subdivision phase 3a Friday, September 17, 2010 12!33 PM
From! "J;m Boyd" <jim.,oyd.rn. IrWL'.COm>
To: "'James, Donna" <DJa-iesr?lIttlerork.org>
Cc: "MCGETP.ICK MCGE.TRICK" <mcyetric'KZCq-sbcg'obal_net>
File (1145KB)
apple ph..
Sewer is available to this property and no additional easements are required by LRW. LRW has no
objection to filling this plat.
jamcs 90vcl, P-E.
Engincering Supervisor
l .tale. Rock Wastewater
#1 l Clearwater Drive
Little Rock, M1 72204
Uil'ice %1-6R3-1414'
\3nbile 501-3�2-0390
email j inJ.i�aydiu.ln; u.coui
From; MCGETRICK MCGETRICK[mailte:megetrick2@sbcglobal.net]
Sent: Thursday, August 05, 2010 9:01 AM
To: Jim Boyd
Cc: Jo -A Bates; Chris Kelthley; ,+hompl@entergy.com; blake weindorf
Subject: final plat apple subdivision phase 3a
Please review the final plat for phase 3a. We will fo ward as-buiits on water and sewer by the 9th.
Pat
http:l ras.nle 1 so l .mail.yanoo.coat me/showMessage?sklid=2&RlterBy=&.rand=9 i 545814... 9%20,12010
Z•d do4:so al oa das
FW: final plat apple sub. phase 3a-'att.net flail'
MAIL
Clss&ic
Page 1 of 1
FW: final plat apple sub. phase 3a Tuesdzy, September 7, 2010 10:47 AM
PromT "CAPPS, TROY G (ATTb4,'9T)" ITC7972�§Iatt.com�
To: ricoetr,ck2tnL sb:global.neF
1 File (2291<13)
r�
apple Ph —
Pat,
Att approves final plate
Troy Capps
Manager- Engineedrig Design
501-373-3713
From. KEATHLEY, CHRIS (ATTSWBT) ^�
Sent: Tuesday, September 07, 2010 9:49 AM
To: CAPPS, TROYID (ATTSWBT)
Subject: FW: final plat apple sub. phase 3a
Chris Kee, hiey
Manager OSP Ping & Eng Ds9n
501.373.6594 O
501.615.5823 C
From: MCGETRICK MCGETRICK[mailto:mcgetrick2Csbcglobal.net] y
Sent: Tuesday, September 07, 2010 9:26 AhA
To: KEAT4LEY, ChRIS (ATTS'NBT)
Subject: final plat apple sub phase 3a
Chris
I need to get a sign off on this plat -Call if You have any questions.
Pat
nttp: us.mc]80l.trail.yahoo.c.oln:'niGshowMessage^fid=lnbox&mid=1_13.55L'_i_AFsl-'vO-. 9i7/2010
g•d d00:90 OL 02 das
Sep PO 10 06:41p
p.4
T
I. d
{- Na �NiyW
ri{
I
Y 3
�•
; �
'?9 �� SJ� R iN�
P„
I
g
��
Ipp
�Ss
a�pp�
RE: apple subdivision phase 3a -'att.net Mail'
CA14C)o!, M A IL
Classic
Page 1 of I
RE: apple subdivision phase 3a Friday, September 3, 2010 10:50 AM
Frcm: "Bates. Joni 0."<joni.bateslcenterpcinlenergy. rom>
To: "MCGETRICK MCGETRIrK" <rncgetrirk2Csbcalobal.ret>
Approved
From: MCGETRICK MCGETRICK[mailto:mogetrick2@sbcglobal.net]
Sent: Friday, September 03, 2010 9:26 AM
To: Bates, Joni B.
Subject: apple subdivision phase 3a
Joni
I need a sign off on the final plat. They are going all electric.
Thanks Pat
http:/,Ius.mc 1801.mail.yahoo.com/mc/showMessage?sMid= I &filterBy=&.rand=196922044... 93/2010
9'd o110:90 01 02 des
APPLE BLOSSOM SUB PH 3A Final Plat-'att.net Mail' Pa°e i of 1
-jL7.HC>0f, MAIL
C 31ai'z
APPLE BLOSSOM SUB PH 3A Final Plat Thursday, August 26, 2010 12:58 PNI
From: "Slake.V,emdorf@iCArkpl,com" <Blake.welndorf@CArkVd.com>
To: Iacies, Dcnna" <D]ames@littierotk.org>
Cc: mcgetr.ck7.Qaiasbr.globil.net
1 File (-145KB)
'apple ph...
NO OBJECTIONS to APPLE BLOSSOM SUB PH 3A Final Plat as submitted by McGetrick.
Please let me know if I may be of further assistance.
Thanks,
Blake F. Weindorf, P.E.
Senior Engineer
Central Arkansas Water
501,377.1224
501.210.4980 (fax)
blake.weindorf@carkv.com A Before you print this email think about the environment.
htp:+';us.mc1801.mail. ahoo.cam,melshow"Message?sMid=68&filterBy—&.rand=i588221... 9,1202010
9•d difr:90 of oa das