Loading...
HomeMy WebLinkAboutS-1010-E ApplicationCity of Little Rock Planning and Development Filing Fees Date In , 20(0 Annexation $ Board of Adjustment $ Cond Use Permit/T UP $ Final Plat $ Planned Unit Dev $ Preliminaiy Plat $ Special Use Permit $ Rezoning Site Plans $ Street Name Change $ Street Name Signs Number at ea $ Public Hearing Signs Number -at -ea $ Total $ File No -------------- Location, Applicant YL-I �, By ,� Page 1 of 1 James, Donna From: Blake.Weindorf@CArkW.com Sent: Thursday, August 26, 2010 12:58 PM To: James, Donna Cc: mcgetrick2@sbcgloba1.net Subject: APPLE BLOSSOM SUB PH 3A Final Plat NO OBJECTIONS to APPLE BLOSSOM SUB PH 3A Final Plat as submitted by McGetrick. Please let me know if I may be of further assistance. Thanks, Blake F. Weindorf, P.E. Senior Engineer Central Arkansas Water 501.377.1224 501.210.4980 (fax) blake.weindorf@carkw.com Before you print this email think about the environment. 8/26/2010 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME -APPLE BLOSSOM III -A INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist ADDRESSING SPECIALIST'S REPORT Date: I have rev' ed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REP T I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. Traffic Engineer Date: �— 0 O CIVIL ENGINEER REPORT I havereviewedthe file for this matter and find that: 1/ The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. f Civil Engineer I/II Date: ! g fa ?Eo— PKWV6 e—A L 4"..' KNis.'Y Cc]S5� ` 65v..,.j9 S^7�7 SURVEYOR'S REPORT 'T'6 PA-Tc �l I.�r�sc g+E pAuFt] G,.] 7'jo�►V��rT Twbr L.,.� IF�ST. I have reviewed the plat and find that: V All requirements for final plat approval have been satisfied. Surveyor Date: f�— Z 3 610 MANAG APPROVAL All Civil Engineering requirements for filing this final plat have been satisfireed. .. Date: Design Review Engineer/Civil Engineering Manager August 23, 2010 James, Donna From: Floriani, Vince Sent: Wednesday, September 08, 2010 10:16 AM To: 'craig jeup' Cc: 'MCGETRICK MCGETRICK'; James, Donna Subject: RE: Street Repair Letter I spoke with Redstone Construction today and was promised the completion of the street patch would be completed at the latest by Friday, September 10, 2010. With that information, Public Works signed off on the final plat and it has been delivered to Donna James, Planning Department Subdivision Administrator. She can be contacted at 501-371-6821 or by email about receiving her sign off. Vince Floriani, P.E. Design Review Engineer Little Rock Public Works 501-371-4817 -----Original Message ----- From: craig jeup [mailto:cjeup@comcast.net] Sent: Tuesday, September 07, 2010 1:35 PM To: Floriani, Vince Cc: 'MCGETRICK MCGETRICK' Subject: RE: Street Repair Letter Below is your email clearly stating the letter from Redstone is sufficient for final approval of the plat. -----Original Message ----- From: Floriani, Vince [mailto:VFloriani@littlerock.org] Sent: Friday, August 27, 2010 11:08 AM To: craig jeup Cc: bjparent@comcast.net; MCGETRICK MCGETRICK; Dexter Doyne; Philpott, Steve Subject: RE: Street Repair Letter Mr. Jeup, The letter provided is sufficient for approval of the final plat pertaining to the repair to the existing City street. I am told the plat is still being held by Traffic Engineering due to a streetlight issue. Vince Floriani, P.E. Design Review Engineer Little Rock Public Works 501-371-4817 -----Original Message ----- From: craig jeup [mailto:cjeup@comcast.net] Sent: Wednesday, August 25, 2010 11:11 AM To: Floriani, Vince Cc: bjparent@comcast.net; 'MCGETRICK MCGETRICK'; 'Dexter Doyne' Subject: FW: Street Repair Letter Mr. Floriani, Please confirm that the attached letter from Redstone Construction provides the City of Little Rock the assurances necessary for final plat approval for the current phase of the Keown Homes Development. 1 Thank you, Craig Jeup JPM Group LLC 4110 Southpoint Blvd. Suite 206 Jacksonville, FL 32216 (904) 279-0132 Office (904) 513-9227 Fax -----Original Message ----- From: kurt cosse [mailto:kurt.cosse@redstone-cg.com] Sent: Wednesday, August 25, 2010 11:46 AM To: craig jeup Subject: Street Repair Letter Please see attached. Kurt Cosse Project Manager RedStone Construction Group, Inc. 505 West Dixon Road, Little Rock, AR 72206 Mobile (501) 539-2716 Phone (501)374-1557 Fax (501)374-8314 kurt.cosse@redstone-cg.com -----Original Message ----- From: Toshiba 232 Copier [mailto:toshiba@redstone-cg.com] Sent: Wednesday, August 25, 2010 11:41 AM To: kurt cosse Subject: Scanned from MFP-05138538 [Kurt—Cosse] 08/25/2010 10:40 Scanned from MFP-05138538. Kurt Cosse Date: 08/25/2010 10:40 Pages:l Resolution:200x200 DPI Please see attachments. 2 McGETIUCK & McGEMCK, iNc ENGINEERS - PLANNERS - SURVEYORS 10 Otter. Creek Court, Suite A j Little ]dock, Arkansas 72210 (PHONE: 501-455-8899 FAX: 501-455-8898 FA IDA E: V 2 ,�,.z,,1,: 0: FROM: PAGES: TES: j•d doo:90 01 0a des FW: final plat apple subdivision phase 3a - 'att.net Mail' Page 1 of 1 ��IICAD!, MAID. ctas,,c FW: final plat apple subdivision phase 3a Friday, September 17, 2010 12!33 PM From! "J;m Boyd" <jim.,oyd.rn. IrWL'.COm> To: "'James, Donna" <DJa-iesr?lIttlerork.org> Cc: "MCGETP.ICK MCGE.TRICK" <mcyetric'KZCq-sbcg'obal_net> File (1145KB) apple ph.. Sewer is available to this property and no additional easements are required by LRW. LRW has no objection to filling this plat. jamcs 90vcl, P-E. Engincering Supervisor l .tale. Rock Wastewater #1 l Clearwater Drive Little Rock, M1 72204 Uil'ice %1-6R3-1414' \3nbile 501-3�2-0390 email j inJ.i�aydiu.ln; u.coui From; MCGETRICK MCGETRICK[mailte:megetrick2@sbcglobal.net] Sent: Thursday, August 05, 2010 9:01 AM To: Jim Boyd Cc: Jo -A Bates; Chris Kelthley; ,+hompl@entergy.com; blake weindorf Subject: final plat apple subdivision phase 3a Please review the final plat for phase 3a. We will fo ward as-buiits on water and sewer by the 9th. Pat http:l ras.nle 1 so l .mail.yanoo.coat me/showMessage?sklid=2&RlterBy=&.rand=9 i 545814... 9%20,12010 Z•d do4:so al oa das FW: final plat apple sub. phase 3a-'att.net flail' MAIL Clss&ic Page 1 of 1 FW: final plat apple sub. phase 3a Tuesdzy, September 7, 2010 10:47 AM PromT "CAPPS, TROY G (ATTb4,'9T)" ITC7972�§Iatt.com� To: ricoetr,ck2tnL sb:global.neF 1 File (2291<13) r� apple Ph — Pat, Att approves final plate Troy Capps Manager- Engineedrig Design 501-373-3713 From. KEATHLEY, CHRIS (ATTSWBT) ^� Sent: Tuesday, September 07, 2010 9:49 AM To: CAPPS, TROYID (ATTSWBT) Subject: FW: final plat apple sub. phase 3a Chris Kee, hiey Manager OSP Ping & Eng Ds9n 501.373.6594 O 501.615.5823 C From: MCGETRICK MCGETRICK[mailto:mcgetrick2Csbcglobal.net] y Sent: Tuesday, September 07, 2010 9:26 AhA To: KEAT4LEY, ChRIS (ATTS'NBT) Subject: final plat apple sub phase 3a Chris I need to get a sign off on this plat -Call if You have any questions. Pat nttp: us.mc]80l.trail.yahoo.c.oln:'niGshowMessage^fid=lnbox&mid=1_13.55L'_i_AFsl-'vO-. 9i7/2010 g•d d00:90 OL 02 das Sep PO 10 06:41p p.4 T I. d {- Na �NiyW ri{ I Y 3 �• ; � '?9 �� SJ� R iN� P„ I g �� Ipp �Ss a�pp� RE: apple subdivision phase 3a -'att.net Mail' CA14C)o!, M A IL Classic Page 1 of I RE: apple subdivision phase 3a Friday, September 3, 2010 10:50 AM Frcm: "Bates. Joni 0."<joni.bateslcenterpcinlenergy. rom> To: "MCGETRICK MCGETRIrK" <rncgetrirk2Csbcalobal.ret> Approved From: MCGETRICK MCGETRICK[mailto:mogetrick2@sbcglobal.net] Sent: Friday, September 03, 2010 9:26 AM To: Bates, Joni B. Subject: apple subdivision phase 3a Joni I need a sign off on the final plat. They are going all electric. Thanks Pat http:/,Ius.mc 1801.mail.yahoo.com/mc/showMessage?sMid= I &filterBy=&.rand=196922044... 93/2010 9'd o110:90 01 02 des APPLE BLOSSOM SUB PH 3A Final Plat-'att.net Mail' Pa°e i of 1 -jL7.HC>0f, MAIL C 31ai'z APPLE BLOSSOM SUB PH 3A Final Plat Thursday, August 26, 2010 12:58 PNI From: "Slake.V,emdorf@iCArkpl,com" <Blake.welndorf@CArkVd.com> To: Iacies, Dcnna" <D]ames@littierotk.org> Cc: mcgetr.ck7.Qaiasbr.globil.net 1 File (-145KB) 'apple ph... NO OBJECTIONS to APPLE BLOSSOM SUB PH 3A Final Plat as submitted by McGetrick. Please let me know if I may be of further assistance. Thanks, Blake F. Weindorf, P.E. Senior Engineer Central Arkansas Water 501,377.1224 501.210.4980 (fax) blake.weindorf@carkv.com A Before you print this email think about the environment. htp:+';us.mc1801.mail. ahoo.cam,melshow"Message?sMid=68&filterBy—&.rand=i588221... 9,1202010 9•d difr:90 of oa das