ITEM NO.: 8 FILE NO.: S-1 04-C
NAME: ASHLEY-HANKINS -- SITE PLAN REVIEW
DEVELOPER: ENGINEER:
Rick Ashley
2851 Lakewood village
North Little Rock, AR 72116
AREA: 3.83 ACRES
ZONING• C-3
NUMBER OF LOT -a: 1
PLANNING DISTRICT: #19 Chenal
CENSUS TRACT: 42.06
VARIANCES REQUESTED: None
BACKGROUND:
Tim Daters
White-Daters and Assoc.
401 South Victory
Little Rock, AR 72201
FT. NEW STREET: 0
This parcel was created as Lot 3 of the Chenal Square Preliminary
Plat (S-1004). Lot 1 has been developed as a Coulson Oil -
Burger King joint facility (Z-5869). No development proposals
for the remaining two lots has been submitted at this time.
A. PROPOSAL:
To develop two retail use buildings and a structure proposed
as a restaurant near the corner of West Markham and Chenal
Parkway Streets. Building "A" will consist of 8,000 square
feet and utilized for retail uses. Building "B" is designed
for 24,000 square feet of shop -retail uses. The last
building is designated as a freestanding 3,200 square foot
Fazoli's restaurant. A total of 171 parking spaces with
accompanying landscaping is planned.
B. EXISTING CONDITIONS:
The property is undeveloped and heavily wooded. The site
has 505 feet of frontage on Chenal Parkway and a driveway
access from West Markham Street. The West Markham Street
right-of-way alignment, which existed prior to Chenal
Parkway being developed crosses the northwest corner of the
site. This right-of-way has been abandoned and the utility
easement remains. The Arkansas Power and Light Service
Center abuts the site to the east.
August 29, 1996
SUBDIVISION
ITEM NO.: 8(Cont.) FILE NO.: 5-1004-C
C. NEIGHBORHOOD COMMENTS:
None at this writing.
D. PUBLIC WORKS COMMENTS:
Grading and drainage plan with soil loss calculations is
required prior to construction. Stormwater Detention will
be required. Widen Markham to 30 feet from centerline and
provide 45 feet of right-of-way from centerline. Address
issue of access to adjacent property with drive shown on
east property line. 1992 traffic count for Markham was
11,670 and Chenal was 10,100 average daily traffic.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not directly
affected.
Arkla: OK
Southwestern Bell: OK
Water: Water main extension required.
AP&L: No comment
Fire Department: Show all existing fire hydrants on
site plan. All buildings need to be
within 500 feet of a fire hydrant.
County Planning: No comment
planning Division: No comment
F. ISSUES TECHNICAL DESIGN:
Landscape•
The proposed on site street buffer width along Chenal
Parkway meets the 21 foot requirement when averaged out. A
three foot wide building landscape strip is required between
public parking areas and the building. There is some
flexibility with this requirement. If there are to be
separate lot lease lines then a four to six foot wide
landscape strip will be required by the Landscape Ordinance
along either side of the lot lease line associated with
vehicular use areas. This is not required, however, where
platted access easements occur.
Issues•
The following are unresolved items on the site plan review
submittal.
Sign location and design
Lighting Plan
2
August 29, 1996
i]SDIVISION
ITEM NO.: $(Cont.)FILE NO_: S-1004-C
G. ANALYSIS:
The site plan for Lot 3 as proposed is compatibility with
adjacent commercial uses. The design of internal streets,
parking and landscaping conform with adopted ordinances. At
this time nothing has been submitted for Lots 2 or 4.
H. STAFF RECOMMENDATIONS:
Approval of site plan (Z-6166) for Lot 3 of Ashley -Hankins
commercial center located generally at West Markham and
Chenal Parkway. Approval is subject to conditions listed in
paragraphs D, E, and F of this report.
SUBDIVISION COMMITTEE COMMENT:
(AUGUST 8, 1996)
Tim Daters, project engineer, represented the applicant and
answered questions. Staff indicated that there was not
sufficient detail on the plans submitted for proper review.
Public Works will require a grading and drainage plan. David
Scherer asked Tim Daters to address the issue of access to
adjacent property with the drive shown on the east property line.
The applicant needs to provide a site plan with specific details
including all dimensions to the Planning and Public Works staff
no later than 5:00 p.m., Thursday, August 15, 1996. Provided a
timely revised submittal is made, the item is to be forwarded to
the full Commission for consideration.
PLANNING COMMISSION ACTION:
(AUGUST 29, 1996)
Larry Jones indicated to the Planning Commission that staff was
adding the requirement for a 10 foot minimum easement along
Chenal Parkway to accommodate a sidewalk and public utilities.
This item was included as part of the Consent Approval Agenda.
A motion to approve the Consent Approval Agenda. The motion
passed by a vote of 8 ayes, 0 nays, 2 absent and 1 open position.