Loading...
HomeMy WebLinkAboutS-1004-C Staff AnalysisAugust 29, 1996 ITEM NO.: 8 FILE NO.: S-1 04-C NAME: ASHLEY-HANKINS -- SITE PLAN REVIEW DEVELOPER: ENGINEER: Rick Ashley 2851 Lakewood village North Little Rock, AR 72116 AREA: 3.83 ACRES ZONING• C-3 NUMBER OF LOT -a: 1 PLANNING DISTRICT: #19 Chenal CENSUS TRACT: 42.06 VARIANCES REQUESTED: None BACKGROUND: Tim Daters White-Daters and Assoc. 401 South Victory Little Rock, AR 72201 FT. NEW STREET: 0 This parcel was created as Lot 3 of the Chenal Square Preliminary Plat (S-1004). Lot 1 has been developed as a Coulson Oil - Burger King joint facility (Z-5869). No development proposals for the remaining two lots has been submitted at this time. A. PROPOSAL: To develop two retail use buildings and a structure proposed as a restaurant near the corner of West Markham and Chenal Parkway Streets. Building "A" will consist of 8,000 square feet and utilized for retail uses. Building "B" is designed for 24,000 square feet of shop -retail uses. The last building is designated as a freestanding 3,200 square foot Fazoli's restaurant. A total of 171 parking spaces with accompanying landscaping is planned. B. EXISTING CONDITIONS: The property is undeveloped and heavily wooded. The site has 505 feet of frontage on Chenal Parkway and a driveway access from West Markham Street. The West Markham Street right-of-way alignment, which existed prior to Chenal Parkway being developed crosses the northwest corner of the site. This right-of-way has been abandoned and the utility easement remains. The Arkansas Power and Light Service Center abuts the site to the east. August 29, 1996 SUBDIVISION ITEM NO.: 8(Cont.) FILE NO.: 5-1004-C C. NEIGHBORHOOD COMMENTS: None at this writing. D. PUBLIC WORKS COMMENTS: Grading and drainage plan with soil loss calculations is required prior to construction. Stormwater Detention will be required. Widen Markham to 30 feet from centerline and provide 45 feet of right-of-way from centerline. Address issue of access to adjacent property with drive shown on east property line. 1992 traffic count for Markham was 11,670 and Chenal was 10,100 average daily traffic. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available, not directly affected. Arkla: OK Southwestern Bell: OK Water: Water main extension required. AP&L: No comment Fire Department: Show all existing fire hydrants on site plan. All buildings need to be within 500 feet of a fire hydrant. County Planning: No comment planning Division: No comment F. ISSUES TECHNICAL DESIGN: Landscape• The proposed on site street buffer width along Chenal Parkway meets the 21 foot requirement when averaged out. A three foot wide building landscape strip is required between public parking areas and the building. There is some flexibility with this requirement. If there are to be separate lot lease lines then a four to six foot wide landscape strip will be required by the Landscape Ordinance along either side of the lot lease line associated with vehicular use areas. This is not required, however, where platted access easements occur. Issues• The following are unresolved items on the site plan review submittal. Sign location and design Lighting Plan 2 August 29, 1996 i]SDIVISION ITEM NO.: $(Cont.)FILE NO_: S-1004-C G. ANALYSIS: The site plan for Lot 3 as proposed is compatibility with adjacent commercial uses. The design of internal streets, parking and landscaping conform with adopted ordinances. At this time nothing has been submitted for Lots 2 or 4. H. STAFF RECOMMENDATIONS: Approval of site plan (Z-6166) for Lot 3 of Ashley -Hankins commercial center located generally at West Markham and Chenal Parkway. Approval is subject to conditions listed in paragraphs D, E, and F of this report. SUBDIVISION COMMITTEE COMMENT: (AUGUST 8, 1996) Tim Daters, project engineer, represented the applicant and answered questions. Staff indicated that there was not sufficient detail on the plans submitted for proper review. Public Works will require a grading and drainage plan. David Scherer asked Tim Daters to address the issue of access to adjacent property with the drive shown on the east property line. The applicant needs to provide a site plan with specific details including all dimensions to the Planning and Public Works staff no later than 5:00 p.m., Thursday, August 15, 1996. Provided a timely revised submittal is made, the item is to be forwarded to the full Commission for consideration. PLANNING COMMISSION ACTION: (AUGUST 29, 1996) Larry Jones indicated to the Planning Commission that staff was adding the requirement for a 10 foot minimum easement along Chenal Parkway to accommodate a sidewalk and public utilities. This item was included as part of the Consent Approval Agenda. A motion to approve the Consent Approval Agenda. The motion passed by a vote of 8 ayes, 0 nays, 2 absent and 1 open position. 3