HomeMy WebLinkAboutS-1004-A Staff AnalysisSeptember 6, 1994
ITEM NO.: 2 FILE NO.: S-1]04-A
NAME: ASHLEY-HANKINS SUBDIVISION -- PRELIMINARY PLAT
LOCATION: At the southeast corner of W. Markham Street and
Chenal Parkway
DEVELOPER:
ENGINEER•
Rick Ashley James C. Summerlin
ASHLEY COMPANY SUMMERLIN ASSOCIATES, INC.
2649 Pike Ave. 2649 S. Broadway
North Little Rock, AR 72114 Little Rock, AR 72206
758-7745 376-1323
AREA: 9.13 ACRES NUMBER OF LOTS: 4 FT. NEW STREET: 0
ZONING: C-3 PROPOSED USES: Commercial
PLANNING DISTRICT: 18
CENSUS TRACT: 42.06
VARIANCES__REOUESTED: Deferral of the requirement to construct
sidewalks along the Chenal Parkway and W. Markham Street
frontages of the site as a condition of approval of the final
plat(s), and require the sidewalks be constructed as a condition
of the building permits as building permits are issued for
construction on the various lots.
STATEMENT OF PROPOSAL:
The applicant proposes a 4-lot commercial subdivision on a 9.13
acre tract, with frontages on both Chenal Parkway and W. Markham
St. Development is proposed of lots which range in size from
0.89 acres for the southern -most lot, to 5.17 acres for the
central lot, to two mid -size lots (1.32 acres and 1.75 acres) for
the northern -most lots. The site is one for which a preliminary
plat was approved by the Commission on March 8, 1994, (for a
subdivision to be known as "Chenal Square"), but which was
subsequently abandoned by the proposed developer. The applicant
seeks to "tie" the construction of the required sidewalks along
both the Chenal Parkway and W. Markham St. frontages of the site
to future sale of and construction on the various lots, and seeks
a deferral of the requirement from being a requirement for filing
a final plat to being a requirement of the building permits for
the various lots as they are developed.
September 6, 1994
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: 5-1004-A
A. PROPOSAL/REQUEST:
The applicant requests Planning Commission approval of a
preliminary plat for a 4-lot commercial subdivision at the
southeast corner of Chenal Parkway and W. Markham St. Also
requested is Commission approval of a deferral of the
requirement to construct the sidewalks along the Chenal
Parkway and W. Markham St. frontages of the site as a
condition of the final plat(s), and require that they be
constructed as a condition of the building permits as
building permits are issued for development of the various
lots.
B. EXISTING CONDITIONS:
The site is undeveloped and heavily wooded. An abandoned
right-of-way for the previous alignment of W. Markham St.
lies within the site.
The existing zoning of the site is C-3, with C-3 zoning
existing on lands to the east, north, and south. A recently
approved PCD lies directly across Chenal Parkway to the
west.
C. ENGINEERINGIUTILITY COMMENTS:
The proposed PAGIS monuments must be designated on the plat.
The pipe stem portion of Lot 3 is to be labeled as a
permanent access easement for Lots 1 & 2. A complete
grading and drainage plan will be required prior to issuing
building permits for individual lots.
Water Works reports that a 20-inch water main crosses the
site and will need to be protected. (Water Works is to be
contacted for approval of any construction in the area of
this main.) No domestic service will be available directly
off the 20-inch main. On site fire protection may be
required.
Wastewater reports that a sewer main extension, with an
easement, will be required for service to Lot 4.
Arkansas Power and Light Co. will require easements.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. will require easements.
The Fire Department approved the submittal as presented.
F"
September 6, 1994
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: 5-1004-A
D. ISSUES/LEGALITECHNICALIDESIGN:
Section 31-287 states: "Where any commercial subdivision
has in excess of 300 feet of frontage on an arterial street,
special provisions for internal circulation shall be
required.... These provisions shall be determined by the
Planning Commission...." "Location of private service
easements shall be indicated on the plat...." In order to
monitor these provision, the access points and access
easements which are anticipated must be indicate on the
plat.
To be heard on the same agenda with the preliminary plat is
a request for a conditional use on the lot which lies at the
northwest corner of the site encompassed by the preliminary
plat. The site plan for the proposed development indicates
an access easement along both the west and south property
lines of the lot. These access easements must be indicated
on the preliminary plat.
Information which the Subdivision Ordinance requires to be
shown on the plat, but which was omitted on the plat, as
submitted, includes the zoning classifications of abutting
lands.
The Master Street Plan and the Subdivision Regulations
(Section 31-209) will require sidewalks along the Chenal
Parkway and W. Markham Street frontages of the subdivision.
The Subdivision Regulations will require that the sidewalks
be in place, or that the "subdivider and City have entered
into an agreement assuring the completion of all required
improvements...." [Section 31-121(c)] The developer is
seeking approval, and has asked for a deferral of the
sidewalk requirements, to tie the requirement for the
sidewalks to the building permits, in lieu of being tied to
the approval of the final plat(s).
E. ANALYSIS•
With only minor additions of information to the plat, the
plat will meet Subdivision Regulations standards. The
zoning classifications of the abutting properties, the
location of the drive access points and access easements,
and the location of the proposed access easements are the
only remaining deficiencies.
The rationale for the requested deferral of the sidewalks
until building permits are requested is that, as a part of a
construction project, funds from construction loans are
3
September 6, 1994
SUBDIVISION
ITEM NO.: 2 Cont.) FILE NO.: S-1004-A
available for construction of sidewalks. Also, the
subdivider can defer to the purchaser those costs which are
associated with a construction project.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, and of
the deferral of the sidewalk requirement to be tied to the
issuance of building permits in lieu of being required for
approval of the final plat(s).
SUBDIVISION COMMITTEE COMMENT: (AUGUST 18, 1994)
Mr. Jim Summerlin, the project engineer, and Mr. J. D. Ashley,
Jr., the developer, were present. Staff presented an overview of
the proposal, and reviewed with the applicant and his engineer
the comments contained in the discussion outline. The discussion
outline contained a comment from the Public Works Department that
additional right-of-way for construction of an additional lane
along W. Markham St. would be required to be dedicated; however,
in the discussion, it was determined that the anticipated
additional lane could be constructed in the existing right-of-
way, and this requirement was deleted. The Committee members
asked Mr. Summerlin and Mr. Ashley if they could comply with the
deficiencies noted in the discussion outline, to which they
responded in the affirmative. The Committee forwarded the item
to the Commission for the public hearing.
4