Loading...
HomeMy WebLinkAboutS-0993-A Staff AnalysisAugust 7, 1997 ITEM NO.: 4 FILE NO.: S-993-A NAME: Mabelvale Business Park Preliminary Plat LOCATION: South side of Baseline Road at I-30 DEVELOPER: ENGINEER: Conservative Development White-Daters Engineers 2851 Lakewood Village Dr. 401 Victory Street No. Little Rock, AR 72116 Little Rock, AR 72201 758-7745 AREA: 61.6 acres NUMBER OF LOTS: 6 FT. NEW STREET: 0 ZONING: C-3 and I-2 PLANNING DISTRICT: #15 Geyer Springs West CENSUS TRACT: 41.05 VARIANCESZWAIVERS REQUESTED: owviP.r �a-�' 1. Approval of Private Street System 2. Frontage Road Improvements A. PROPOSAL: To convert a single tract lease lot arrangement to a conventional commercial plat, but, with a private street system. The request specifically requests Planning commission authorize private streets. This is an authority granted by ordinance and is done occasionally. A second variance is to eliminate curb, gutter and sidewalk along the I-30 frontage. The owner does not desire to change his site plan of record but, sell the sites not lease them. B. EXISTING CONDITIONS: This large parcel of land is mostly cleared and occupied by two buildings that were authorized by a prior site plan. There is little or no grade on the land. Abutting uses are a mix of residential to the west and Wal-Mart to the east. Highway commercial exists around the interchange. C. NEIGHBORHOOD COMMENTS: None received at this writing. August 7, 1997 SUBDIVISION ITEM NO.: 4 (Cont.) FILE NO.: 5-993-A D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Provide striping and signage plans for the development, for Traffic Engineering approval. 2. Proposed ditch sections. 3. Developer shall contribute 50% to fund installation of traffic signals at Mabelvale Pike at I-30 Frontage Road. Mabelvale Pike at I-30 frontage is the highest priority on traffic signal warrant study. 4. I-30 Frontage Road has a 1995 average daily traffic count of 19,531. 5. Mabelvale Pike has a 1995 average daily traffic count of 15,570. 6.Sidewalks on I-30 Frontage Road will be required with development or developer may contribute in -lieu fees for construction. 7. Stormwater detention ordinance applies to this property. 8. Show the following: a) Easements shown for proposed storm drainage. b) Easements for proposed stormwater detention facilities. 9.Contact the AHTD for work within the State Highway right - o f -way . E. UTILITIES• Wastewater: Sewer main extension required with easements. Entergy: No response. Arkla: OK as submitted. Southwestern Bell: Approved as submitted. Water: Water main extension to each parcel will be required. On site protection will be required. Some existing fire service lines may cross more than one parcel. Modifications will be required to rectify that situation. Fire Department: Show fire hydrant locations. CATA: Bus routes 17 and 17-A serve this site with all day service. F. ISSUES/TECHNICAL/DESIGN: Landscape: No comment required. Issues: Planning Division: No comment - plan conformance 2 August 7, 1997 SUBDIVISION ITEM NO.: 4 Cont.) FILE NO.: S-993-A G. ANALYSIS• There are not many plat deficiencies to correct and these of plat notation requirement. There are no issues of consequence except the waivers and staff takes their usual approach of approval of private streets and denial of waivers. The plat needs are: 1. Indicate feet of new street. 2. Average lots size and platting format (one at a time) 3. Where is lot #1 and show? 4. Will there be additional lots in phases II and III. 5. Lot dimensions on Lot 6 6. Building line from easement/ROW not curb line. 7. Drive spacing on lots 2 thru 6 8. Phases II and III will later require more information. H. STAFF RECOMMENDATIONS: APPROVAL of the plat as requested with private streets but denial of Frontage Road improvements entirely. We defer to Public Works on specifics. SUBDIVISION COMMITTEE COMMENT: (JULY 17, 1997) The applicant was represented by Mr. Joe White, Jr. The staff presented its comments and briefly discussed the plat with both applicant and committee. In general the staff comments dealt with basic items that need to be added to the drawing. David Scherer of Public Works Department raised a couple of issues that he felt were of particular note, these were: The priority traffic signal at Mabelvale Pike and I-30 and the construction of sidewalks along I-30 Frontage Road. These matters were discussed at length. Mr. White was instructed to make the plat changes and resubmit by July 24th. The Committee forwarded the application to the full Commission of final action. PLANNING COMMISSION ACTION: (AUGUST 7, 1997) The Staff reported that the applicant has removed the only variance request. (Street improvements) and that the plat is in good order and should be placed on Consent Agenda. A motion to place the preliminary plat on Consent Agenda for approval was made. A motion to approve the preliminary plat passed by a vote of 8 ayes, 0 noes and 3 absent. 3