HomeMy WebLinkAboutS-0993 Staff AnalysisOctober 5, 1993
ITEM NO.; 2 BILE NO.: S-993
NAME: MABELVALE BUSINESS PARR - PRELIMINARY PLAT
LO ATI South-east corner of I-30 and Mabelvale Pike
DEVELOPER:
ENGINEER:
CONSERVATIVE DEVELOPMENT CO. WHITE-DATERS & ASSOCIATES, INC.
2649 Pike Ave. 401 Victory St.
North Little Rock, AR 72207 Little Rock, AR 72201
758-7745 374-1666
SEA: 61.57 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: C-3 & I-2
PLANNING DISTRICT: 15
CENSUS TRACT: 22.03
VARIANCES REQUESTED: None
STATEMENT OF PROPOSAL:
PROPOSED USES: Commercial Development
The applicant proposes the development of one lot commercial
subdivision involving 61.57 acres of land which is presently
zoned C-3 and I-2. Improvements to the boundary streets are
proposed; however, internal roadways are proposed to be private
drives.
A. PRQPQSAWREQQEST:
The applicant requests approval of a preliminary plat for a
one -lot commercial subdivision involving 61.57 acres.
Improvements to the boundary streets, Mabelvale Pike and the
I-30 access road are anticipated. Internal roadways are
proposed to be private drives. No variances are requested.
B. EXISTING CONDITIONS:
The existing zoning is C-3 along the north 1348 feet
(measured along the east property line) and I-2 at the rear
533 feet. The site is heavily wooded and is undeveloped.
There is approximately a 20 foot difference in elevation
across the site, dropping from the south-west corner to the
north-east corner of the site. There is a 1-acre pond on
the site.
October 5, 1993
ITEM NO.: 2 (Continued) FILE N4.- 5-993
C. ENGINEERI GIUTILITY COMMENTS:
Engineering comments that they need to be contacted
regarding the traffic to be generated, the design of the
internal streets, the tie-in with the Wal-Mart drive, and
the tie-in to the I-30 access road. Verification of
approval (or lack of disapproval) by the Highway Department
is required.
Water Works reports that water mains and on -site fire
service will be required. Wal-Mart will have to complete
the deficiencies on the existing main before service can be
extended to this property. The easement shown along the
east property line is a water easement, not a utility
easement.
Wastewater Utility reports that sewer main extensions, with
easements, will be required.
The Fire Department approved the submittal without comment.
AP&L will require easements.
ARRLA and Southwestern Bell approved the submittal without
comment.
D. ISSUR VLEGAL/TECHNICALZDE�Ig :
The plat which has been submitted is deficient in the
following ways: 1) the names of abutting subdivisions,
with the book and page number or instrument number of their
filing, or the names of abutting property owners on
unplatted land is to be shown; 2) the location and
description of monuments is to be shown; 3) the existing
zoning classification of the tract and of the abutting
tracts is to be shown; 4) the proposed treatment of the
lake and of water courses leaving the site is to be
addressed; and, 5) the location of PAGIS monuments is to be
shown.
A preliminary bill of assurance is required.
An agreement needs to be presented for verification that the
applicant and Wal-Mart may have direct access from one
parking lot to the other and are sharing in the development
of the common drive.
E. ANALYSIS•
The proposed preliminary plat, as an item, is fairly
straight forward; it is a one lot subdivision, albeit the
one lot is a very large one. The deficiencies in the
2
October 5, 1993
SIIHDIVISION
ITEM No.: 2 (Continu!p, a ) FILE NO.: 5-993
submittals are fairly easily remedied and should not be a
problem to complete. There are at this writing, however,
questions on the part of the Engineering Division regarding
approvals by the Highway Department and approval of the
access points to the site from Mabelvale Pike and the I-30
access road. There are also questions regarding the status
of the internal streets.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the plat, subject to
Engineering's approval and correcting the deficiencies
noted.
,5-UBDIVL,9-IQN COMMITTEE COMMENT: (September 16, 1993)
Mr. Joe White, with White-Daters and Associates, Inc., the
engineering firm on the project was present. Staff presented the
request and Mr. White reviewed the proposal with the Committee.
Mr. White indicated that the State Highway had approved the
location of the access points to Mabelvale Pike and to the I-30
access road. Engineering noted the concerns they had with the
location of the access drive off the I-30 access road. Mr. white
and the Engineering Division personnel will hold further meetings
on the engineering issues. The Committee forwarded the request
to the Commission for the public hearing.
3
November 16, 1993
ITEM NO.:
;M10
NAME: MABELVALE BUSINESS PARK - PRELIMINARY PLAT
LOCATION: South-east corner of I-30 and Mabelvale Pike
DEVELOPER:
ENGINEER:
CONSERVATIVE DEVELOPMENT CO. WHITE-DATERS & ASSOCIATES, INC.
2649 Pike Ave. 401 Victory St.
North Little Rock, AR 72207 Little Rock, AR 72201
758-7745 374-1666
AREA: 61.57 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: C-3 & I-2 PROPOSED USES: Commercial Development
PLANNING DISTRICT: 15
CENSUS TRACT: 22.03
VARIANCES REQUESTED: None
STATEMENT OF PROPOSAL:
The applicant proposes the development of one lot commercial
subdivision involving 61.57 acres of land which is presently
zoned C-3 and I-2. Improvements to the boundary streets are
proposed; however, internal roadways are proposed to be private
drives.
A. PROPOSAL/REQUEST:
The applicant requests approval of a preliminary plat for a
one -lot commercial subdivision involving 61.57 acres.
Improvements to the boundary streets, Mabelvale Pike and the
I-30 access road are anticipated. Internal roadways are
proposed to be private drives. No variances are requested.
B. EXISTING CONDITIONS:
The existing zoning is C-3 along the north 1348 feet
(measured along the east property line) and I-2 at the rear
533 feet. The site is heavily wooded and is undeveloped.
There is approximately a 20 foot difference in elevation
across the site, dropping from the south-west corner to the
north-east corner of the site. There is a 1-acre pond on
the site.
November 16, 1993
ITEM NO.: B (Continued) FILE NO.: S-923
C. ENGINEERINGIUTILITY COMMENTS:
Engineering comments that they need to be contacted
regarding the traffic to be generated, the design of the
internal streets, the tie-in with the Wal-Mart drive, and
the tie-in to the I-30 access road. Verification of
approval (or lack of disapproval) by the Highway Department
is required.
Water Works reports that water mains and on -site fire
service will be required. Wal-Mart will have to complete
the deficiencies on the existing main before service can be
extended to this property. The easement shown along the
east property line is a water easement, not a utility
easement.
Wastewater Utility reports that sewer main extensions, with
easements, will be required.
The Fire Department approved the submittal without comment.
AP&L will require easements.
ARKLA and Southwestern Bell approved the submittal without
comment.
D. ISSUESI LEGALITECHNICALIDENIGN:
The plat which has been submitted is deficient in the
following ways: 1) the names of abutting subdivisions,
with the book and page number or instrument number of their
filing, or the names of abutting property owners on
unplatted land is to be shown; 2) the location and
description of monuments is to be shown; 3) the existing
zoning classification of the tract and of the abutting
tracts is to be shown; 4) the proposed treatment of the
lake and of water courses leaving the site is to be
addressed; and, 5) the location of PAGIS monuments is to be
shown.
A preliminary bill of assurance is required.
An agreement needs to be presented for verification that the
applicant and Wal-Mart may have direct access from one
parking lot to the other and are sharing in the development
of the common drive.
E. ANALYSIS•
The proposed preliminary plat, as an item, is fairly
straight forward; it is a one lot subdivision, albeit the
one lot is a very large one. The deficiencies in the
2
November 16, 1993
ITEM NO.: B Continued FILE NO.: S-993
submittals are fairly easily remedied and should not be a
problem to complete. There are at this writing, however,
questions on the part of the Engineering Division regarding
approvals by the Highway Department and approval of the
access points to the site from Mabelvale Pike and the I-30
access road. There are also questions regarding the status
of the internal streets.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the plat, subject to
Engineering's approval and correcting the deficiencies
noted.
SUBDIVISION COMMITTEE COMMENT: (September 16, 1993)
Mr. Joe White, with White-Daters and Associates, Inc., the
engineering firm on the project was present. Staff presented the
request and Mr. White reviewed the proposal with the Committee.
Mr. White indicated that the State Highway had approved the
location of the access points to Mabelvale Pike and to the I-30
access road. Engineering noted the concerns they had with the
location of the access drive off the I-30 access road. Mr. White
and the Engineering Division personnel will hold further meetings
on the engineering issues. The Committee forwarded the request
to the Commission for the public hearing.
PLANNING COMMISSION ACTION: (OCTOBER 5, 1993)
The item was included on the consent agenda for approval and
was passed by the Planning Commission with the vote of 8 ayes,
no nays, 2 absent, no abstentions, and 1 open position.
SUBDIVISION COMMITTEE COMMENT (October 28, 1993)
The applicant, Mr. Rick Ashley, and his engineer, Mr. Joe White,
were present. The Planning staff asked for confirmation that the
Engineering Division is satisfied that all requirements have been
met as far as the Highway Department and City Engineering are
concerned regarding the layout of the proposed interior streets
and access points to the public rights -of -way. The Engineering
staff responded that an agreement has been reached, and that the
Highway Department is in agreement. Revised drawings reflecting
the agreed -to layout need to be submitted. After a short
discussion regarding the location of a temporary tie-in to
Mabelvale Pike at the west edge of the project, the Committee
forwarded the item to the Commission for resolution.
01
November 16, 1993
ITEM NO.: E (Continued) FILE NO-: S-993
PLANNING COMMISSION ACTION: (November 16, 1993)
Staff presented the item and recommended approval of the request.
It was pointed out that, where more than one business is on one
"block" and a common drive serves these businesses, an access
easement must be provided to encompass the common drive;
otherwise, the required landscaping at the lease lot line will
be applicable. The item was included on the consent agenda for
approval and was approved with the vote of 8 ayes, no nays,
2 absent, no abstentions, and 1 open position.