Loading...
HomeMy WebLinkAboutS-0992-V ApplicationCity of Little Rock Planning and Development Filing Fees Date'- —Q 20L f2 M 18 ZM7 Annexation Sr , ROCK Board of Adjustywmt Cond. Use Perrnit/T.U.P. Final Plat Planned Unit Dev. Preliminary Plat Special Use Permit Rezoning Site Plans Street Name Change Street Name Signs Numberatea. Public Hearing Signs Numbei at ea. Total File No. Location A It'-&, C 3 _J is Applicant YVLL By 2807048122 06/19/2RD7 63:22:57 PM Filed 8 Recorded in Official Records of PAT O'BRIEN PULASKI COUNTY CIRCUIT/COUNTY CLERK Fees $26.60 BILL OF ASSURANCE REPLAT OF LOT 3 PINNACLE VALLEY SUBDIVISION KNOW ALL MEN BY THESE PRESENTS: THAT WHEREAS, Kelton R. Brown, Jr. & Valerie J. Brown, hereinafter called "Grantors", are the owner of the following described property: Lot 3 Pinnacle Valley Subdivision, Little Rock, Arkansas AND WHEREAS, it is deemed advisable to replat the above -described property. NOW, THEREFORE, the Grantors have caused the land to be surveyed by McGetrick Engineering, Inc., Engineers and Surveyors, and a plat made thereof, identified by the title "Lots 3-A and 3-B being a replat of Lot 3 Pinnacle Valley Subdivision, Final Plat, Little Rock, Arkansas ". The plat bears the signatures and seals of Patrick M. McGetrick, Registered Professional Engineer, Robert C. Lowe, Jr., Registered Professional Land Surveyor, the signature Of the Grantors, bears a Certificate of Approval executed by the Little Rock Planning Commission, and is filed for record as Plat # Z - S in the Records of the Circuit County Clerk of Pulaski County, Arkansas. The filing of the plat for record shall constitute a complete and valid delivery of any and all easements and/or rights -of -way shown on the Plat. The lands embraced in the plat shall be forever known as Lots 3-A and 3-B, being a replat of Lot 3 Pinnacle Valley Subdivision, Final Plat, Little Rock, Arkansas, and every deed of conveyance shall bear the lot designations as indicated on the plat. 8 The lots in the subdivision shall be used only for single-family residential purposes. All Building Codes and Zoning Ordinances of the City of Little Rock shall be applicable. WITNESS the si&mature of the Grantors this day of ,2007 o-- APPROVED: LITTLE ROCK PLANNING COMhUSSION Reviewed only fcr inclusion of minimum standards required by the Cibj cf Lim to RocN subdivision regulationo. Bill of Assure.nc,- provisions cot biishad ty'L.-M developer may exceed mini; � u r,;u!aftns of the the Rock subdivision and zoning ordinances. � 1 'a [6 rl C46 Little Rock Planning Commission GRANTORS PAA Welton R. Brown, Jr. 4Varie J. 4Bw'] ACKNOWLEDGMENT STATE OF ARKANSAS) COUNTY OF GRANT) BE IT REMEMBERED, that on this date came before me, a Notary Public, duly commissioned and acting for the State and County, aforesaid Kelton R. Brown, Jr. & Valerie J. Brown and stated that as Grantors in the foregoing Bill of Assurance, were authorized to and had executed the same for the purposes set forth therein_ Notary Public 212Z)ZC) z S Ems,' "OFFICIALrNotary My Commission Expires Rachel S. Menzies Public, State of Arkansas County of Grant Commission Exp. OV22120 "' CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME PINNACLEVALLEY SUB PHASE H INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist ADDRESSING SPECIALIST'S REPORT Date: I have rev wed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: 6 —l3 0 7 TRAFFIC ENGINEER RE ❑RT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. Traffic Engineer Date: Gr Ilia CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. 1 1 V ' —�—� Civil Engineer I/II Date: G 13 0 - SURVEYOR'S REPORT I have reviewed the plat and find that: �Allrements for Fnai plat.ap vat have been satisfied. �- r -� Surveyor Date: MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. - �` -- Date: & / j 3 Jo 7 Design Review Engineer/Civil Engineering Manager February 2007