Loading...
HomeMy WebLinkAboutS-0992-T Staff AnalysisJanuary 18, 2007 ITEM NO.: 1 FILE NO.: 5-992-T NAME: Pinnacle Valley Revised Preliminary Plat LOCATION: Located on the West side of Pinnacle Valley Road, just North of Cantrell Road DEVELOPER: Kelton Brown c/o McGetrick and McGetrick Engineers 10 Otter Creek Court, Suite A Little Rock, AR 72210 ENGINEER: McGetrick and McGetrick Engineers 10 Otter Creek Court, Suite A Little Rock, AR 72210 AREA: 2.09 acres URRENT ZONIN PLANNING DISTRICT: CENSUS TRACT: NUMBER OF LOTS: 3 R-2, Single-family 1 — River Mountain 42.05 FT. NEW STREET: 0 VARIANCESM/AIVERS REQUESTED: None requested. A. PROPOSAL/REQUEST: The request includes a revision to the previously approved Pinnacle Valley Phase V Preliminary Plat to allow the creation of three lots from this remaining 2.09-acre tract. The lots are proposed with a 30-foot building setback along Pinnacle Valley Road as required per the Subdivision Ordinance for lots abutting a collector street. According to the applicant's cover letter, the right of way dedication and in -lieu payment for improvements to Pinnacle Valley Road were previously paid to the City. January 18, 2007 SUBDIVISION NO.: 1 (Cont. B. EXISTING CONDITIONS: FILE NO.: S-992-T There is an existing single-family home located on proposed Lot 1. There are single-family homes to the south located in the Pinnacle Valley Phase V Subdivision. To the east of the site is the Beau View Subdivision, a single-family subdivision located on five -acre tracts. To the west of the site are single-family homes located within Pinnacle Valley Subdivision Phase IV. Adjacent to the site Pinnacle Valley Road has not been constructed to Master Street Plan standards. Partial street improvements have been completed to the area located to the south of the site; adjacent to Pinnacle Valley Phase V Subdivision. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received one informational phone call from an area resident. All abutting property owners and the River Valley Neighborhood Association and the Pinnacle Valley Neighborhood Association were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to Pinnacle Valley Road including curb, gutter and sidewalk with the planned development. A payment has already been received from the property owner in -lieu of improvements to Pinnacle Valley Road to a rural standard. 2. The proposed right-of-way dedication meets Master Street Plan requirements. 3. Per City standards for streets and site development, the minimum driveway spacing on a minor arterial street is 300 feet. This would allow only one (1) access for the three (3) lots because the existing driveway to the south is considered. Access should be taken from other lots located to the south not Pinnacle Valley Road. Show access location. 4. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 5. Storm water detention ordinance applies to this property. The project would qualify for a contribution in -lieu of construction at the time of final platting. 6. If the subdivision plans to access Pinnacle Valley Road, provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 2 January 18, 2007 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-992-T E F. G UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available to the property. Entergy: No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The existing easement water and sewer easements will severely impact development of Lots 2 and 3. Contact Central Arkansas Water at 377-1225 for additional information. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route, ISSU ESITECH N ICALIDES IG N : Planninq Division: No comment. Landscape: No comment. SUBDIVISION COMMITTEE COIy1MENT (December 28, 2006) The applicant was present representing the request. Staff presented an overview of the proposed development indicating there were concerns with the buildability of Lot 3. Staff requested Mr. McGetrick provide the total buildable area to ensure a new home could be constructed on the lot. Public Works comments were addressed. Staff stated the proposed development would be allowed only one additional curb cut. Staff requested Mr. McGetrick indicate the driveway locations on the proposed preliminary plat. Staff requested Pinnacle Valley Road be constructed to Master Street Plan standard complete with curb, gutter and sidewalk. Staff noted an in -lieu payment had been received from the developer to allow the construction of the street to a rural standard. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information 01 January 18, 2007 SUBDIVISION EM NO.: 1 (Cont. FILE NO.: 5-992-T and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing most of the issues raised at the December 28, 2006, Subdivision Committee meeting. The applicant has indicated a buildable area for proposed Lot 3 allowing sufficient area to construct a new home, avoiding the existing easements and adhering to the indicated platted 30-foot platted building line. The revised plat indicates the placement of one additional driveway on Pinnacle Valley Road. The southern two lots will share a drive while the new home will utilize a new drive extending from Pinnacle Valley Road. Staff is supportive of the indicated driveway locations. The applicant has also submitted a letter certifying the sight distance for the proposed driveway location. Staff is supportive of the proposed preliminary plat. The plat indicates the creation of two additional lots from an existing tract. The lots are indicated with a minimum lot size of 0.30 acres and an average lot size of 0.69 acres. The proposed preliminary plat indicates the required building line adjacent to Pinnacle Valley Road (30-feet) and sufficient area to construct the new homes. To staffs knowledge there are no outstanding issues associated with the request. Staff does. not feel the creation of three lots from this 2.09-acre site will have any adverse impact on the adjoining properties. I. STAFF RECOMMENDATIONS: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the above agenda staff report. n January 18, 2007 SUBDIVISION ITEM NO.: 1 (Cont.) FILE NO.: S-992-T and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing most of the issues raised at the December 28, 2006, Subdivision Committee meeting. The applicant has indicated a buildable area for proposed Lot 3 allowing sufficient area to construct a new home, avoiding the existing easements and adhering to the indicated platted 30-foot platted building line. The revised plat indicates the placement of one additional driveway on Pinnacle Valley Road. The southern two lots will share a drive while the new home will utilize a new drive extending from Pinnacle Valley Road. Staff is supportive of the indicated driveway locations. The applicant has also submitted a letter certifying the sight distance for the proposed driveway location. Staff is supportive of the proposed preliminary plat. The plat indicates the creation of two additional lots from an existing tract. The lots are indicated with a minimum lot size of 0.30 acres and an average lot size of 0.69 acres. The proposed preliminary plat indicates the required building line adjacent to Pinnacle Valley Road (30-feet) and sufficient area to construct the new homes. To staffs knowledge there are no outstanding issues associated with the request. Staff does not feel the creation of three lots from this 2.09-acre site will have any adverse impact on the adjoining properties. 1. STAFF RECOMMENDATIONS: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the above agenda staff report. PLANNING COMMISSION ACTION- (JANUARY 18, 2007) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. There was no further discussion of the item. The chair entertained a motion for placement of the item on the consent agenda for approval. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. M McGETRICK & McGETRICK, INC. ENGINEERS - PLANNERS - DEVELOPERS January 04, 2007 Ms. Donna James Subdivision Administrator 723 Markham Street Little Rock, AR 72201 Re: Revised Preliminary Plat Pinnacle Valley Subdivision Dear Ms. James: This letter is to verify that the site distance for the two driveways shown on the Preliminary Plat meet city requirements. If you have any questions regarding this application, please feel free to contact us. Sincere, McGetrick & McGetrick, Inc. Patrick M. McGetrick, P.E. PM: cb 10 0VW Grad: Cou % Slate A Uttla Rock, AR 72210 501-455- B99 floc 501,455-8&% M NAME: Pinnacle Valley Revised Preliminary Plat S-992-T LOCATION: located on the West side of Pinnacle Valley Road, just North of Cantrell Road Planning Staff Comments- 1. Provide notification of abutting property owners of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than January 3, 2007. The Office of Planning and Development must receive the proof of notice no later than January 12, 2007. 2. Provide the name of owner, owner's address and source of title in the general notes section of the proposed preliminary plat. 3. Provide the buildable area for each of the proposed lots. Variance/Waivers- None requested. Public Works Conditions: 1. With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to Pinnacle Valley Road including curb, gutter and sidewalk with the planned development. A payment has already been received from the property owner in -lieu of improvements to Pinnacle Valley Road to a rural standard. 2. The proposed right-of-way dedication meets Master Street Plan requirements. 3. Per City standards for streets and site development, the minimum driveway spacing on a minor arterial street is 300 feet. This would allow only one (1) access for the three (3) lots because the existing driveway to the south is considered. Access should be taken from other lots located to the south not Pinnacle Valley Road. Show access location. 4. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 5. Storm water detention ordinance applies to this property. The project would qualify for a contribution in -lieu of construction at the time of final platting. 6. If the subdivision plans to access Pinnacle Valley Road, provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. Utilities and Fire Department/County Planning: Wastewater: Sewer available to the property. Entergy: No comment received. Item # I Center -Point Ener-gy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. The existing easement water and sewer easements will severely impact development of Lots 2 and 3. Contact Central Arkansas Water at 377-1225 for additional information. Fire Department: Approved as submitted. County Plannin1g: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Planning Division: No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the additional information as noted above) to staff on Wednesday, January 6, 3007. Item # I