Loading...
HomeMy WebLinkAboutS-0992-Q Map 2PROPERTY DESCRIPTI❑N LOTS 8, 9 & 10, PHASE II PINfJACLE VALLEY SUBDIVISI❑N THIS PROPERTY DOES NOT LIE WITHIN THE 100' YEAR FLOODPLAIN ACCORDING TO FEMA MAP # 0501810091 F DATED OCTOBER 19, 2001 STATE PLANE C❑RDINATES N❑RTHING EASTING 1 172672.809 1179829,108 2 172566,486 1179987,692 3 172460.328 1180028,859 4 172672.809 1179829.108 5 172465,471 1179798.888 61 172469.428 1179648.938 7 172596.035 1179648.524 8 172593.246 1179788.066 9 172594.809 1179801.531 o R-50'--� COUNTRYSIDE COVE 50' R/W N co �D -,0 (U w 0 :r r. S 88.49147" E 136.56' 10' EASEMENT — N 83'22'47" El 25' BUILDING LINE 8R MINIMUM FINISHED FLOOR EVEV. 272.0 c O� 15' EASEMENT 150,0' IPF N 88'21'51" W 275,85' L N 1' = 4 0' S S6,09' 7S' EASEMENT— IPF IOR N \ r_ S MINIMUM FINISHED \ \ FLOOR EVEV. 272,0 230.02' 15' EASEMENT IPF I-� N 89-19'24" W 104.49' CERTIFICATE OF ENGINEERING ACCURACY I, --PATRICK -M, MCGETRICK __ HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A PLAN MADE BY ME, AND THAT THE ENGINEERING REQUIREMENTS OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS HAVE BEEN COMPLIED WITH, SIGNED 2/3/2003 ------------- ------------------------ DATE ❑F EXECUTI❑N NAME, REGISTERED PROFESSIONAL ENGINEER NoA_�j66__ ARKANSAS CERTIFICATE ❑F SURVEYING ACCURACY I, _-ROBERT C. LOWE_ HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A BOUNDARY SURVEY MADE BY ME AND BOUNDARY MARKERS SHOWN HEREON ACTUALLY EXIST AND THEIR LOCATION, TYPE AND MATERIAL ARE CORRECTLY SHOWN, SIGNED 2/3/2003 DATE OF EXECUTION NAME, REGISTERED LAND SURVEYOR No.12_____ ARKANSAS CERTIFICATE OF OWNER WE, THE UNDERSIGNED OWNERS OF THE REAL ESTATE SHOWN AND DESCRIBED HEREIN, DO HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED, AND SUBDIVIDED, AND D❑ HEREBY LAY OFF, PLAT, AND SUBDIVIDE SAID REAL ESTATE IN ACCORDANCE WITH THIS PLAT. SIGNED ----------------- -- ------------------------ DATE OF EXECUTI❑N KELT❑N R, BROWN JR. & VALERIE J. BROWN 4600 WESTCHESTER DR, LITTLE ROCK, AR 72212 SIGNED ------------------- ------------------------ DATE OF EXECUTION NAME: ADDRESS: SOURCE OF TITLE: D.R. ------- PAGE INSTRUMENT No,_______ CERTIFICATE OF FINAL APPROVAL PURSUANT TO THE LITLE ROCK SUBDIVISION RULES AND REGULATIONS, AND ALL OF THE C❑NDITIONS OF APPROVAL HAVING BEEN COMPLETED, THIS DOCUMENT IS HEREBY ACCEPTED, THIS CERTIFICATE IS HEREBY EXECUTED UNDER THE AUTHORITY OF SAID RULES AND REGULATI❑NS. SIGNED ---------------- ------------- --- DATE OF EXECUTI❑N L.R. PLANNING C❑MMISSION CERTIFICATE OF RECORDING THIS DOCUMENT, NUMBER _______ FILED FOR RECORD -------- 20___, IN PLAT BOOK PAGE ------------------------ CLERK I/ v03 3 ILI G.0 C � LOTS 8R &10R BEING A REPLAT OF LOTS 8, 9 & 10 PHASE II PINNACLE VALLEY SUBDIVISION LITTLE �McG�Ti�I ROCK, ARKANSAS CC K r_NG0N1.r_R,5 - PLAgNMRS - 5URV=- Y0Trt,5 319 PRESIDENT CLINTON AVE„ #202 DATE: JANUARY 31, 2003 LITTLE ROCK, ARKANSAS 72201 \2003\Pinnacle Valley Sub, Replat - 8R & 10R,DWG\12 PHONE 501-223-9900