HomeMy WebLinkAboutS-0992-D Staff AnalysisOctober 10, 1996
ITEM NO.: 1 FILE NO.: S-992-D
NAME: PINNACLE VALLEY SUBDIVISION PHASE III
LOCATION: On south side of Pinnacle Valley Road about 3/4 mile
south of railroad tracts.
DEVELOPER:
Carl Boshears
Route 2 Box 1162AA
Perryville, AR 72126
ENGINEER•
Pat McGetrick
McGetrick Engineering
11225 Huron Ln., Ste. 200
Little Rock, AR 72211
AREA: 5.75 ACRES NUMBER OF LOTS: 20 FT. NEW STREET: 1,015
ZONING: R-2 PROPOSED USES: Single Family Residential
PLANNING DISTRICT: #1, River Mountain
CENSUS TRACT: 42.05
VARIANCES REQUESTED:
1) Length cul-de-sac street
2) Rural street standards on Pinnacle Valley Road with no curb,
gutter or sidewalks
BACKGROUND•
This parcel of land was not previously developed when the area
across the creek was subdivided. This proposal will create 20
single family lots situated adjacent to Pinnacle Valley Road.
A. PROPOSAL/REQUEST:
To create 20 new single family residential lots with access
from a proposed cul-de-sac which will connect with Pinnacle
Valley Road. The developer is requesting a variance for a
cul-de-sac which will exceed the maximum allowable length
portion of the ordinance. A variance is also requested to
allow that portion of Pinnacle Valley Road to be developed
as a rural street. This would eliminate the required
installation of curb, gutter and sidewalk improvements. The
proposed cul-de-sac would include curb, gutter and sidewalks
on one side of the street.
October 10, 1996
SUBDIVISION
ITEM NO.: 1 [Cont.} FILE NO.: S-992-D
B. EXISTING CONDITIONS:
The vacant land is wooded and generally lower than the
existing grade of Pinnacle Valley Road. A 48 inch raw
waterline and a 20 inch sanitary sewer line run through the
property. A portion of the property is site is within the
f loodplain.
C. NEIGHBORHOOD COMMENTS:
None to date.
D. ENGINEERING COMMENTS:
PUBLIC WORKS COMMENTS:
Based flood elevations are to be shown on all lots that have
floodplain on them. A sketch grading and drainage per
section 29-186 will be required. A grading permit for
special flood hazard area and a development permit for
special flood hazard area will be required prior to
construction. Submit base flood elevation in sketch grading
plan prior to construction. Submit base flood elevation in
sketch grading plan prior to Planning Commission approval.
Addresses for this site will be assigned at final platting.
The length of the cul-de-sac exceeds limits according to the
minor residential street standards which limits a cul-de-sac
lengthy to 750 feet. Staff can support a cul-de-sac length
variance because there are only 20 residential lots shown
accepting access from this street. We recommend
construction of a sidewalk and the safety standards relative
to sight distance for a residential street. Pinnacle Valley
Road is a minor arterial on the Master Street Plan. Right-
of-way dedication to 45 feet from centerline will be
required. Construction of frontage improvements to 30 feet
from centerline with the sidewalk are required by ordinance.
Staff could support a deferral of improvements beyond
collector streets standards. Collector street width 36 foot
pavement would facilitate left turn movement on this narrow
roadway. Recommend that the plat be redrawn to eliminate
the residential frontage of lots 6, 7, 8 and 1 on this minor
arterial. Storm water detention ordinances apply.
E. UTILITY COMMENTS/FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements.
Isom Fees will be required.
Arkla : No comment
Southwestern Bell: OK
2
October 10, 1996
SUBDIVISION
ITEM NO.: 1 (Cant.) FILE NO.: S-992-D
Water: There may be restrictions on the amount of cut
and/or fill allowed in the waterline easement. A
water main extension will be required.
AP&L : No comment
Fire Department: No comment
County Planning: No comment
Landscape: No comment
F. ISSUES/TECHNICAL/DESIGN:
The following are unresolved items with the preliminary plat
submittal.
• Show plat boundaries.
• Include all floodway as a tract.
■ Eliminate Lots 1, 6, 7 and 8 which are shown with direct
access from Pinnacle Valley Road.
G. ANALYSIS:
A number of outstanding issues addressed at the Subdivision
Committee meeting remain unresolved at the time of the
preparation of this staff report. Staff is prepared to
proceed with the preliminary map contingent on the revisions
listed above.
H. STAFF RECOMMENDATIONS:
APPROVAL of the preliminary plat provided that the developer
make changes to the plat outlined in paragraph F. Approval
is subject to the conditions listed in paragraphs D, E, F of
this staff report.
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 19, 1996)
Mr. Pat McGetrick, project engineer summarized the major aspects
of the proposed preliminary plat. Larry Jones stated that Lots
1, 6, 7 and 8 could not take direct access from Pinnacle Valley
Road. Mr. McGetrick indicated he would take a look at some other
form of access for those lots. David Scherer expressed concern
about who will be responsible for future improvements to portions
of Pinnacle Valley Road that are not controlled by this
subdivider. Larry Jones asked Mr. McGetrick to define the
boundaries of the preliminary plat.
This item is to be forwarded to the full Commission for
determination.
3
October 10, 1996
SUBDIVISION
ITEM NO.. 1_ (Cont.) FILE NO.: S-992-D
PLANNING COMMISSION ACTION: (OCTOBER 10, 1996)
Mr. Jones presented the staff report. He stated that proposed
Lots 1,6, 7 and 8 had been redesigned to not take access from
Pinnacle Valley Road. Mr. Harry Willems requested a 25 foot
driveway easement across Lot 1 to provide access to a house he
owns adjacent to this subdivision. Mr. Pat McGetrick agreed to
provide that easement. Mr. McGetrick also stated his request for
a waiver of curb, gutter and sidewalks on Pinnacle Valley Road.
There was a long discussion between David Scherer and Chairman
Putnam concerning road improvements. The applicant wants only to
provide rural standard improvements on Pinnacle Valley Road.
Several commissioners asked questions concerning the difference
between a waiver or deferral. The Chairman asked for a motion on
the preliminary plat only.
Motion to approve the preliminary plat as submitted. Motion
passed with 9 ayes, 0 nays and 2 absent. Motion to defer curb,
gutter and sidewalk requirements until the last three lots are
final platted. Motion passed with 6 ayes, 3 nays and 2 absent.
4