Loading...
HomeMy WebLinkAboutS-0981-E ApplicationC < 0 N (Op o m 0 Q T p D 3 1 c 0 0 � CD f o DD m m City of Little Rock j N Planning and Development o Filing Fees „N MAY 21 rl�Akt n m Date' - , 20 1 CITY Or LITTLE ROCK BUILDING CODE oAnnexation $ AD r Board of Adjustment $ N 0 Cond Use Permit/T UP $ Final Plat � $�a- Z Planned Unit Dev $ Preliminary Plat U) $ Special Use Permit $ 0 CD Rezoning $ ° Site PlansCD $ 0 Street Name Change $ Street Name Signs 3 0 Number at ea $ Public Hearing Signs Number at ea $ Total $2-to 4 File No Location1.9 45- Applicantz By Lift/� �cc(c l Z2� I 90 o — 3 -71 —. q-% ? - I(i I �rJ www.colliers.com CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: ONE SOURCE LOTS 1 $ B- RC-2 —R I have made a final inspection of the improvements and find that: �V,V?V - "� All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. rb (40 Certain Improvements remain uncompleted and a punch list has been prepared and Sant. 9�(V,,� Engineering Specialist Date: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date:^ CML ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. Civil Engineer IM Date: SURVEYOR REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. Surveyor Date: — all MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. Date: Design Review Engineer/Civil Engineering Manager Effective: May 5, 2021 RE: Lot Split - Chenal Splash Oil Subject: RE: Lot Split - Chenal Splash Oil From: Bradford Gaines <Bradford.Gaines@colliers.com> Date: 4/13/2021, 1:10 PM To: "Henderson, Jeremy" <jhende9@entergy.com> CC: Phillip Lewis <plewisenginee ring@yahoo.com>, Garrett <garrett@ phi Ili plewisengineering.com> Thanks Jeremy! Bradford Gaines, PLA Director of New Developments I Arkansas Development Division Bradford.Gaines@coIIiers.com Office: +1 501 372 6161 1 Mobile: +1 501 551 6508 One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA 0 coEEiers.comlarkarLsas I View Privacy Poli y From: Henderson, Jeremy <jhende9@entergy.com> Sent: Tuesday, April 13, 2021 12:41 PM To: Bradford Gaines <Bradford.Gaines@colliers.com> Cc: Phillip Lewis <plewisenginee ring@yahoo.com>; Garrett <garrett@ phi IIiplewisengineering.com> Subject: RE: Lot Split - Chenal Splash Oil Entergy has no objections to this proposal. Thanks! Jeremy Henderson Engineering Associate 11 Entergy Arkansas, LLC 9 Entergy Ct. Little Rock, AR 72211 501-223-6125 AM From: Bradford Gaines <Bradford.Gaines@colliers.com> Sent: Monday, April 12, 2021 9:45 AM To: Bates, Joni B<joni.bates@centerpointenergy.com>; Henderson, Jeremy <jhende9 entergy.com> Cc: Phillip Lewis <plewisengineeringahoo.com>; Garrett <garrettphilliplewisen ing� eering com> Subject: FW: Lot Split - Chenal Splash Oil EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way. DO NOT provide your 1 of 6 5/11/2021, 10:11 AM RE: Splash Chenal Final Plat Revision 4-20-2021 Subject: RE: Splash Chenal Final Plat Revision 4-20-2021 From: Vincent Hotho <Steven.Hotho@Irwra.com> Date: 4/23/2021, 3:31 PM To: Garrett Rich <garrett@philliplewisengineering.com> LRWRA has no objection to the plat. Please submit building and site plans to us for approval prior to construction. Thanks, Vince During this COVID-19 health crisis, LRWRA is continuing to provide customer service while implementing safety precautions to protect residents and employees. There may be a slight delay in email correspondence; but we will respond as soon as possible. S. Vincent Hotho, P.E. Engineering Manager 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www.irwra.com LITTLE ROCK ■Water Redamation fty ONE WATER Author ONE FUTURE. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Garrett Rich <garrett@philliplewisengineering.com> Sent: Wednesday, April 21, 2021 2:53 PM To: Vincent Hotho <Steven.Hotho@lrwra.com> Subject: Fwd: Splash Chenal Final Plat Revision 4-20-2021 Vince, Please find attached the revised plat Thanks, Begin forwarded message: From: Chris Herron <ch ris@ phi Ili plewisengineering.com> Date: April 21, 2021 at 2:43:14 PM CDT To: Garrett Rich <garrettph illiplewisengineering.com> Subject: Splash Chenal Final Plat Revision 4-20-2021 1 of 2 5/11/2021, 10:14 AM FW: [External] Re: [External] FW: Title Work - Splash Chenal Subject: FW: [External] Re: [External] FW: Title Work - Splash Chenal From: Andrew Pownall <Andrew.Pownall@carkw.com> Date: 5/12/2021, 10:56 AM To: 'Garrett' <garrett@philliplewisengineering.com> CC: Bradford Gaines <Bradford.Gaines@colliers.com> The attached plat dated 5/12/2021 is approved. Thank you for the updates. Andrew Pownall Senior Engineer Central Arkansas Water 501-377-1342 (Office) 501-218-6898 (Cell) From: Garrett Rich <garrett@philliplewisengineering.com> Sent: Wednesday, May 12, 2021 10:53 AM To: Andrew Pownall <Andrew.PownaII@carkw.com> Cc: Bradford Gaines <Bradford.Gaines@colliers.com> Subject: [External] Re: [External] FW: Title Work - Splash Chenal [CAUTION:] This email originated from outside of the CAW. Do not click links or open attachments unless you recognize the sender and know the content is safe. Andrew, I placed the easements as described in the records you sent me, along with adding the additional 15' easements along the property lines abutting the streets. Please see attached for your review. -- Thanks, Garrett Rich Project Engineer I Phillip Lewis Engineering, Inc. LE.phone: _ 501j 213-5190 email: garrett@ph illiplewisengineering corn On 5/11/2021 3:35 PM, Andrew Pownall wrote: Thank you. I sent a couple extra easements to Garrett that my system shows to be included in this property. I believed they are checking to see where the easements are located. Andrew Pownall Senior Engineer 1 of 3 5/12/2021,11:00 AM Bradford Gaines From: Gober, Adam P <adam.gober@centerpointenergy.com> Sent: Thursday, May 13, 2021 1:22 PM To: Garrett Rich Cc: Phillip Lewis; Bradford Gaines Subject: RE: [External Email] Chenal Splash Carwash - Plat Approval Garrett, CenterPoint approves this plat. Thank you, Adam P. Gober ie17telftinj Engineer I AR/OK Region EneW 501.377.4737 w. 1501.541.7509 c. CenterPointEnergy.com 0000 From: Garrett Rich <Barrett@ phi Iliplewisengineering.com> Sent: Tuesday, May 11, 2021 10:48 AM To: Gober, Adam P <adam.gober@centerpointenergy.com> Cc: Phillip Lewis <plewisengineering@yahoo.com>; Bradford Gaines <bradford.gaines@colliers.com> Subject: [External Email] Chenal Splash Carwash - Plat Approval EXTERNAL EMAIL Good morning Adam, We are in the process of finalizing a lot split for the Splash carwash on Chenal Pkwy & Wellington Hills Rd. I have attached the Final Plat we have created for the property. We are trying to file this in the next day or two and need an approval from you guys on the current easements we have in place. Can I get you to look at this in the near future and provide us with that approval? I apologize as we are last minute once again. I really appreciate you taking the time to look at this! -- Thanks, Garrett Rich Project Engineer I Phillip Lewis Engineering, Inc. phone: (501) 213-5190 LE. email: Barrett@phillinlewisengineering.com Moore, Monte From: Bradford Gaines <Bradford.Gaines@colliers.com> Sent: Thursday, May 20, 2021 12:34 PM To: Moore, Monte Cc: Phillip Lewis; 'Garrett' Subject: FW: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers (Bradford Gaines) Attachments: OneSource Addition Lot 2-3 Final Plat 05-12-2021.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Monte, See approval from ATT. See you around 2PM. Thanks! Bradford Gaines, PEA Director of New Developments I Arkansas Development Division Bradford. Gaines coltiers.corn Office: +1 501 372 6161 1 Mobile: +1 501 551 6508 One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA 0 n 0 calllers.cornlarkansas I View Privacy Palic From: KEATHLEY, CHRIS <ck0826@att.com> Sent: Thursday, May 20, 2021 12:32 PM To: Bradford Gaines <Bradford.Gaines@colliers.com> Cc: Phillip Lewis <plewisengineering@yahoo.com>; 'Garrett'<garrett@philliplewisengineering.com>; GURLEY, JOHN CURTIS <JG0866@att.com> Subject: RE: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers (Bradford Gaines) Bradford..... AT&T approves the attached proposed replat of lot 1B & 1C Onesource addition in the city of Little Rock, AR. Thanx Chris Chris Keathley Lead 05P Ping & Eng Dsgn 501.615.5823 Cell ck0826@att.com 1 l at&t From: Bradford Gaines <Bradford.Gaines@colfiers.com> Sent: Thursday, May 20, 2021 12:01 PM To: KEATHLEY, CHRIS <ckd$26@att.com> Cc: Phillip Lewis <plewisengineeringflyahoo.com>; 'Garrett' < arrett hilli lewisen ineerin .com> Subject: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers (Bradford Gaines) Chris, See attached lot split for our Splash Oil Change project. Can you drop me a quick approval note that ATT is good with proposed split. We are maintaining all perimeter right of ways along Kanis & Wellington Hills. Trying to file this today, if you could drop me a quick note. Thanks! Bradford Gaines, PLA Director of New Developments I Arkansas Development Division Bradford. Ga i nes@cal I iers. co m Office: +1 501 372 6161 1 Mobile: +1 501 551 6508 One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA 000 00 coliiers.Comlarkansaq I View PrivacyPoliCy Member firm, U.S. Green Building Council -The U.S. Green Building Council is a 501(c)(3) non-profit community of leaders working to make green buildings available to everyone within a generation. Notice: This communication and any attached documents contain confidential information, which is intended only for the use of the person(s) named above, and which also may be legally privileged. If you are not the intended recipient of this transmission, you are hereby notified that any dissemination, copying, or use of the information contained herein is prohibited. If you have received this transmission in error, please notify the sender immediately by reply e-mail, and immediately delete this message.