HomeMy WebLinkAboutS-0981-E ApplicationC
<
0
N (Op
o
m
0
Q
T p
D
3
1 c
0 0 �
CD f o
DD
m m City of Little Rock j
N Planning and Development
o Filing Fees
„N MAY 21
rl�Akt
n
m Date' - , 20 1 CITY Or LITTLE ROCK
BUILDING CODE
oAnnexation $
AD
r Board of Adjustment $
N
0
Cond Use Permit/T UP $
Final Plat
� $�a-
Z Planned Unit Dev $
Preliminary Plat
U) $
Special Use Permit $
0
CD
Rezoning $
° Site PlansCD
$
0
Street Name Change $
Street Name Signs
3
0 Number at ea $
Public Hearing Signs
Number at ea $
Total $2-to 4
File No
Location1.9 45-
Applicantz
By
Lift/� �cc(c l Z2� I
90 o — 3 -71 —. q-% ? -
I(i I �rJ
www.colliers.com
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: ONE SOURCE LOTS 1 $ B- RC-2
—R
I have made a final inspection of the improvements and find that:
�V,V?V - "�
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards. rb (40
Certain Improvements remain uncompleted and a punch list has been prepared and Sant. 9�(V,,�
Engineering Specialist Date:
ADDRESSING SPECIALIST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Traffic Engineer Date:^
CML ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer IM Date:
SURVEYOR REPORT
I have reviewed the plat and find that:
All requirements for final plat approval have been satisfied.
Surveyor Date: — all
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date:
Design Review Engineer/Civil Engineering Manager
Effective: May 5, 2021
RE: Lot Split - Chenal Splash Oil
Subject: RE: Lot Split - Chenal Splash Oil
From: Bradford Gaines <Bradford.Gaines@colliers.com>
Date: 4/13/2021, 1:10 PM
To: "Henderson, Jeremy" <jhende9@entergy.com>
CC: Phillip Lewis <plewisenginee ring@yahoo.com>, Garrett <garrett@ phi Ili plewisengineering.com>
Thanks Jeremy!
Bradford Gaines, PLA
Director of New Developments I Arkansas
Development Division
Bradford.Gaines@coIIiers.com
Office: +1 501 372 6161 1 Mobile: +1 501 551 6508
One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA
0 coEEiers.comlarkarLsas I View Privacy Poli y
From: Henderson, Jeremy <jhende9@entergy.com>
Sent: Tuesday, April 13, 2021 12:41 PM
To: Bradford Gaines <Bradford.Gaines@colliers.com>
Cc: Phillip Lewis <plewisenginee ring@yahoo.com>; Garrett <garrett@ phi IIiplewisengineering.com>
Subject: RE: Lot Split - Chenal Splash Oil
Entergy has no objections to this proposal.
Thanks!
Jeremy Henderson
Engineering Associate 11
Entergy Arkansas, LLC
9 Entergy Ct.
Little Rock, AR 72211
501-223-6125
AM
From: Bradford Gaines <Bradford.Gaines@colliers.com>
Sent: Monday, April 12, 2021 9:45 AM
To: Bates, Joni B<joni.bates@centerpointenergy.com>; Henderson, Jeremy <jhende9 entergy.com>
Cc: Phillip Lewis <plewisengineeringahoo.com>; Garrett <garrettphilliplewisen ing� eering com>
Subject: FW: Lot Split - Chenal Splash Oil
EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is
unknown, or the message seems suspicious in any way. DO NOT provide your
1 of 6 5/11/2021, 10:11 AM
RE: Splash Chenal Final Plat Revision 4-20-2021
Subject: RE: Splash Chenal Final Plat Revision 4-20-2021
From: Vincent Hotho <Steven.Hotho@Irwra.com>
Date: 4/23/2021, 3:31 PM
To: Garrett Rich <garrett@philliplewisengineering.com>
LRWRA has no objection to the plat. Please submit building and site plans to us for approval prior to construction.
Thanks,
Vince
During this COVID-19 health crisis, LRWRA is continuing to provide customer service
while implementing safety precautions to protect residents and employees. There may
be a slight delay in email correspondence; but we will respond as soon as possible.
S. Vincent Hotho, P.E.
Engineering Manager
11 Clearwater Dr.
Little Rock, AR 72204
Office: (501)688-1452
www.irwra.com
LITTLE ROCK
■Water Redamation
fty ONE WATER
Author
ONE FUTURE.
This email and any files transmitted with it are confidential and intended solely for the
use of the individual or entity to whom they are addressed. If you have received this
email in error, please notify the sender. This message may contain confidential
information, and is intended only for the individual named.
From: Garrett Rich <garrett@philliplewisengineering.com>
Sent: Wednesday, April 21, 2021 2:53 PM
To: Vincent Hotho <Steven.Hotho@lrwra.com>
Subject: Fwd: Splash Chenal Final Plat Revision 4-20-2021
Vince,
Please find attached the revised plat
Thanks,
Begin forwarded message:
From: Chris Herron <ch ris@ phi Ili plewisengineering.com>
Date: April 21, 2021 at 2:43:14 PM CDT
To: Garrett Rich <garrettph illiplewisengineering.com>
Subject: Splash Chenal Final Plat Revision 4-20-2021
1 of 2 5/11/2021, 10:14 AM
FW: [External] Re: [External] FW: Title Work - Splash Chenal
Subject: FW: [External] Re: [External] FW: Title Work - Splash Chenal
From: Andrew Pownall <Andrew.Pownall@carkw.com>
Date: 5/12/2021, 10:56 AM
To: 'Garrett' <garrett@philliplewisengineering.com>
CC: Bradford Gaines <Bradford.Gaines@colliers.com>
The attached plat dated 5/12/2021 is approved.
Thank you for the updates.
Andrew Pownall
Senior Engineer
Central Arkansas Water
501-377-1342 (Office)
501-218-6898 (Cell)
From: Garrett Rich <garrett@philliplewisengineering.com>
Sent: Wednesday, May 12, 2021 10:53 AM
To: Andrew Pownall <Andrew.PownaII@carkw.com>
Cc: Bradford Gaines <Bradford.Gaines@colliers.com>
Subject: [External] Re: [External] FW: Title Work - Splash Chenal
[CAUTION:] This email originated from outside of the CAW. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Andrew,
I placed the easements as described in the records you sent me, along with adding the additional 15'
easements along the property lines abutting the streets. Please see attached for your review.
-- Thanks,
Garrett Rich
Project Engineer I Phillip Lewis Engineering, Inc.
LE.phone: _ 501j 213-5190
email: garrett@ph illiplewisengineering corn
On 5/11/2021 3:35 PM, Andrew Pownall wrote:
Thank you. I sent a couple extra easements to Garrett that my system shows to be included in this
property. I believed they are checking to see where the easements are located.
Andrew Pownall
Senior Engineer
1 of 3 5/12/2021,11:00 AM
Bradford Gaines
From: Gober, Adam P <adam.gober@centerpointenergy.com>
Sent: Thursday, May 13, 2021 1:22 PM
To: Garrett Rich
Cc: Phillip Lewis; Bradford Gaines
Subject: RE: [External Email] Chenal Splash Carwash - Plat Approval
Garrett,
CenterPoint approves this plat.
Thank you,
Adam P. Gober
ie17telftinj Engineer I AR/OK Region
EneW 501.377.4737 w. 1501.541.7509 c.
CenterPointEnergy.com
0000
From: Garrett Rich <Barrett@ phi Iliplewisengineering.com>
Sent: Tuesday, May 11, 2021 10:48 AM
To: Gober, Adam P <adam.gober@centerpointenergy.com>
Cc: Phillip Lewis <plewisengineering@yahoo.com>; Bradford Gaines <bradford.gaines@colliers.com>
Subject: [External Email] Chenal Splash Carwash - Plat Approval
EXTERNAL EMAIL
Good morning Adam,
We are in the process of finalizing a lot split for the Splash carwash on Chenal Pkwy & Wellington Hills Rd. I
have attached the Final Plat we have created for the property. We are trying to file this in the next day or two
and need an approval from you guys on the current easements we have in place. Can I get you to look at this in
the near future and provide us with that approval?
I apologize as we are last minute once again. I really appreciate you taking the time to look at this!
-- Thanks,
Garrett Rich
Project Engineer I Phillip Lewis Engineering, Inc.
phone: (501) 213-5190
LE. email: Barrett@phillinlewisengineering.com
Moore, Monte
From: Bradford Gaines <Bradford.Gaines@colliers.com>
Sent: Thursday, May 20, 2021 12:34 PM
To: Moore, Monte
Cc: Phillip Lewis; 'Garrett'
Subject: FW: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers
(Bradford Gaines)
Attachments: OneSource Addition Lot 2-3 Final Plat 05-12-2021.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Monte,
See approval from ATT.
See you around 2PM.
Thanks!
Bradford Gaines, PEA
Director of New Developments I Arkansas
Development Division
Bradford. Gaines coltiers.corn
Office: +1 501 372 6161 1 Mobile: +1 501 551 6508
One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA
0 n 0 calllers.cornlarkansas I View Privacy Palic
From: KEATHLEY, CHRIS <ck0826@att.com>
Sent: Thursday, May 20, 2021 12:32 PM
To: Bradford Gaines <Bradford.Gaines@colliers.com>
Cc: Phillip Lewis <plewisengineering@yahoo.com>; 'Garrett'<garrett@philliplewisengineering.com>; GURLEY, JOHN
CURTIS <JG0866@att.com>
Subject: RE: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers (Bradford Gaines)
Bradford..... AT&T approves the attached proposed replat of lot 1B & 1C Onesource addition in the city of Little Rock,
AR. Thanx Chris
Chris Keathley
Lead 05P Ping & Eng Dsgn
501.615.5823 Cell
ck0826@att.com
1
l at&t
From: Bradford Gaines <Bradford.Gaines@colfiers.com>
Sent: Thursday, May 20, 2021 12:01 PM
To: KEATHLEY, CHRIS <ckd$26@att.com>
Cc: Phillip Lewis <plewisengineeringflyahoo.com>; 'Garrett' < arrett hilli lewisen ineerin .com>
Subject: Lot Split Approval - Splash Oil Change - Wellington Hills at Kanis - Colliers (Bradford Gaines)
Chris,
See attached lot split for our Splash Oil Change project. Can you drop me a quick approval note that ATT is good with
proposed split. We are maintaining all perimeter right of ways along Kanis & Wellington Hills.
Trying to file this today, if you could drop me a quick note.
Thanks!
Bradford Gaines, PLA
Director of New Developments I Arkansas
Development Division
Bradford. Ga i nes@cal I iers. co m
Office: +1 501 372 6161 1 Mobile: +1 501 551 6508
One Allied Drive, Suite 1500 1 Little Rock, AR 72202 1 USA
000 00 coliiers.Comlarkansaq I View PrivacyPoliCy
Member firm, U.S. Green Building Council -The U.S. Green Building Council is a 501(c)(3) non-profit community of leaders
working to make green buildings available to everyone within a generation.
Notice: This communication and any attached documents contain confidential information, which is intended
only for the use of the person(s) named above, and which also may be legally privileged. If you are not the
intended recipient of this transmission, you are hereby notified that any dissemination, copying, or use of the
information contained herein is prohibited. If you have received this transmission in error, please notify the
sender immediately by reply e-mail, and immediately delete this message.