HomeMy WebLinkAboutS-0979 Staff AnalysisJune 1, 1993
ITEM NO.: 6 FILE NO.: Sw979
NAME: SHACKLEFORD SQUARE - PRELIMINARY PLAT
LOCATION: Northwest corner of Shackleford Road and Kanis Road
DEVELOPER:
ENGINEER•
STEVE BOND JOE WHITE
HATHAWAY GROUP WHITE-DATERS AND ASSOC., INC.
3600 Cantrell Road 401 Victory Street
Little Rock, AR 72202 Little Rock, AR 72201
664-5400 371-1666
AREA: 4.14 ACRES NUMBER OF LOTS: 3 FT. NEW STREET: 0
ZONING: C-3 PROPOSED USES: Commercial
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARTANCES REQUESTED: None
STATEMENT OF PROPOSAL:
The developer proposes a three (3) lot commercial subdivision
involving 4.14 acres. No variances are requested. Entrance to
the center and north lots is proposed to be gained by way of a
drive approach at the center lot and an access easement extending
from this drive approach north, to the north lot. Access to the
south/corner lot is proposed to be from Kanis and Shackleford
Roads. No improvements are proposed to Shackleford or Kanis
Roads, although additional right-of-way is proposed to be
dedicated for Kanis Road.
A. PROPOSAL/REQUEST:
Approval of the Planning Commission of a preliminary plat is
requested for the development of a three -lot commercial
subdivision. The property is approximately 288 feet across
(east -to -west) and 638 feet north -and -south along
Shackleford. The proposed development would create a north
lot of approximately 1.4 acre, a center lot of approximately
1.7 acre, and a south lot of approximately 1 acre.
Access to the center and north lots is proposed by way of a
center drive approach and an access easement to the north
lot. No restriction of access is proposed to the
south/corner lot. A right-of-way dedication of 15 feet
additional land for Kanis Road is proposed.
June 1, 1993
SUBDIVISION
ITEM NO.: 5 Continued FILE NO.: S- 7
B. EXISTING CONDITIONS:
The existing site is heavily wooded and overgrown with a
46 foot elevation change (6.5% grade) across the site (474
foot elevation at the northeast corner of the property
versus 428 feet at the southwest corner). The "C-3" zoned
site is surrounded on the north and west with an 0-3 zone.
Across Shackleford to the east is the 110-3" zoned Farm
Bureau property. To the southeast at the corner of
Shackleford and Kanis is an 0-2 zone surrounded by 0-3
property. Immediately to the south across Kanis is a PCD
and C-2 property.
C. ENGINEERING/UTILITY COMMENTS:
The Engineering Division reports that right-of-way and
Master Street Plan improvements will be required on Kanis
Road, and that a right turn lane will be required on
Shackleford Road. Further, Engineering Division reports
that a sidewalk will be required on Shackleford. They
suggest that the access easement from the drive approach on
Shackleford Road north to Lot 1 also needs to be extended
south to Lot 3. Engineering cautions that the Excavation
and Detention Ordinances are applicable.
Water Works reports that an additional public fire hydrant
may be needed; that this would be installed by Water Works,
but coordination would need to be done with this
development.
Wastewater Utility says that a sewer main extension will be
required with easements. Wastewater Utility should be
contacted for information concerning payment of the required
reimbursement fee for connection to the Farm Bureau Outfall.
Southwestern Bell Telephone Company reports that easements
will be required.
Arkansas Louisiana Gas Company has approved the plat as
submitted.
The Fire Department has approved the plat without comment.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
A review of the documents submitted with the application
reveals the following deficiencies:
The source of title is not provided.
The matter or the source of water nor the means of
disposal of wastewater is addressed.
2
June 1, 1993
SUBDIVISION
ITEM NO.: 6 Continued FILE NC • S-979
There is no preliminary storm drainage plan provided
showing typical ditch sections.
The names of abutting subdivisions is not provided.
The names of owners of all land contiguous to the
proposed subdivision is not provided.
The zoning classifications within and abutting the plat
are omitted.
The locations of proposed PAGIS monuments are omitted.
There is no draft Bill of Assurance included.
Conformance to the requirements of the Master Street Plan
will be required regarding improvements on Shackleford and
Ranis Roads.
E. ANALYSIS•
The property is zoned appropriately for the proposed uses
and there are no major deficiencies in the submitted
technical document. There should be no reason that
requirements imposed cannot be accommodated.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, subject
to making the modifications cited by the Engineering staff.
SUBDIVISION COMMITTEE COMMENT: (MAY 13, 1993)
Mr. Joe white of white-Daters and Associates was present to
represent the applicant. Mr. white presented the item. The
Engineering staff reiterated their comment that a right turn lane
off Shackleford Road would be required, as indicated in the
Master Street Plan; that improvements to Ranis Road would be
required; that a sidewalk along Shackleford is required; and that
the access easement from the central drive on Shackleford into
Lot 2 and extending north for access to Lot 1 should also be
extended to Lot 3 on the south. Mr. white quizzed the
Engineering staff about their restricting access to Lot 3 (the
south corner lot), but made no challenge to it. There were no
other observations by the Committee or Staff; so, the item was
referred to the Commission for final resolution.
3
June 1, 1993
SUBDIVISION
ITEM NO.: 5 (Continued) FILE NO.: S-97
STAFF UPDATE:
The engineering staff relented on the requirement to restrict
access to the corner lot, Lot 3, and requiring access to this lot
be gained by way of the access easement located on Lot 2 which
extends north to Lot 1. The applicant submitted revised drawings
showing the sidewalk along Shackleford Road, the right turn lane
off Shackleford onto Kanis, and the remaining requirements of
staff.
PLANNING COMMISSION ACTION: (JIINE 1, 1993)
This item was included on the Consent Agenda for approval and, as
such, was approved by the Planning Commission with a vote of nine
(9) ayes and no (0) nays to approve the Consent Agenda.
4