HomeMy WebLinkAboutS-0058-A Staff AnalysisJuly 9, 1985
SUBDIVISIONS
Item No. 5
NAME: River Park Apartments
(Phase II)
LOCATION: Northwest Corner of Rebsamen
Park Road and Riverfront Dr.
DEVELOPER: APPLICANT:
Riversedge Apt. John Kooistra
Joint Venture
945 Savers Federal ENGINEER:
Little Rock, AR 72201
Phone: 372-4125 Robinson, Wassell and Savage
AREA: 4 acres
ZONING: "MF-18"
8500 West Markham
Little Rock, AR
Phone: 227-5665
NO. OF LOTS: 1 FT. NEW ST.: 0
PROPOSED USE: Apartments
A. Site History
The
first phase of
this development
approved by
the
Commission
was entitled
"Riversedge
Apartments."
It
consisted
of 38 units
of apartments.
B. Proposal
1.
The construction
of 70 apartments
units on
approximately
4
acres.
2.
Unit Summar
Unit
Unit
Mark
Description
Area
No.
A-1
1-Bedroom,
1
Bath
618
12
A-2
1-Bedroom,
1
Bath
618
12
B-1
2-Bedroom,
2
Bath
1,049
4
B-2
2-Bedroom,
2
Bath
1,049
4
B-3
2-Bedroom,
2
Bath
1,049
14
B-4
2-Bedroom,
2
Bath
1,049
10
B-5
2-Bedroom,
2
Bath
1,049
14
Total
6,481
70
July 9, 1985
SUBDIVISIONS
Item No. 5 - Continued
3.
Building Summary
Bldg. No. of
No • T7.� _'L ..
Total Unit Area
1
16
11,612
2
16
11,612
3
14
14,686
4
10
10,490
5
14
14,686
Total
70
63,086
4. Parkinq Analysis
Required ................... 105
Covered -
Uncovered .................. 126
Total Parking .............. 126
Living Area for Parking .... 476 sq. ft.
Parking Per Unit ........... 1.8 spaces
C. En ig neering Comments
None.
D. Analysis
During the review of Phase I, the applicant requested
that he be allowed to file a "PUD" on Phase II at a
later date. The second phase, as submitted at this
time, does not need "PUD" review. Staff has found no
problems with the submission.
E. Staff Recommendation
Approval.
SUBDIVISION COMMITTEE REVIEW:
Since the applicant was not present, there was no review of
this application.
Water Works - On -site fire lines and fire hydrants will be
required.
July 9, 1985
SUBDIVISIONS
Item No. 5 - Continued
PLANNING COMMISSION ACTION:
The applicant -was present. There were no objectors in
attendance. After a brief discussion, the Planning
Commission voted unanimously to approve the site plan
subject to location of fire hydrants and on -site water
mains. The -vote: 8 ayes, 0 noes and 3 absent.