Loading...
HomeMy WebLinkAboutS-0058-A Staff AnalysisJuly 9, 1985 SUBDIVISIONS Item No. 5 NAME: River Park Apartments (Phase II) LOCATION: Northwest Corner of Rebsamen Park Road and Riverfront Dr. DEVELOPER: APPLICANT: Riversedge Apt. John Kooistra Joint Venture 945 Savers Federal ENGINEER: Little Rock, AR 72201 Phone: 372-4125 Robinson, Wassell and Savage AREA: 4 acres ZONING: "MF-18" 8500 West Markham Little Rock, AR Phone: 227-5665 NO. OF LOTS: 1 FT. NEW ST.: 0 PROPOSED USE: Apartments A. Site History The first phase of this development approved by the Commission was entitled "Riversedge Apartments." It consisted of 38 units of apartments. B. Proposal 1. The construction of 70 apartments units on approximately 4 acres. 2. Unit Summar Unit Unit Mark Description Area No. A-1 1-Bedroom, 1 Bath 618 12 A-2 1-Bedroom, 1 Bath 618 12 B-1 2-Bedroom, 2 Bath 1,049 4 B-2 2-Bedroom, 2 Bath 1,049 4 B-3 2-Bedroom, 2 Bath 1,049 14 B-4 2-Bedroom, 2 Bath 1,049 10 B-5 2-Bedroom, 2 Bath 1,049 14 Total 6,481 70 July 9, 1985 SUBDIVISIONS Item No. 5 - Continued 3. Building Summary Bldg. No. of No • T7.� _'L .. Total Unit Area 1 16 11,612 2 16 11,612 3 14 14,686 4 10 10,490 5 14 14,686 Total 70 63,086 4. Parkinq Analysis Required ................... 105 Covered - Uncovered .................. 126 Total Parking .............. 126 Living Area for Parking .... 476 sq. ft. Parking Per Unit ........... 1.8 spaces C. En ig neering Comments None. D. Analysis During the review of Phase I, the applicant requested that he be allowed to file a "PUD" on Phase II at a later date. The second phase, as submitted at this time, does not need "PUD" review. Staff has found no problems with the submission. E. Staff Recommendation Approval. SUBDIVISION COMMITTEE REVIEW: Since the applicant was not present, there was no review of this application. Water Works - On -site fire lines and fire hydrants will be required. July 9, 1985 SUBDIVISIONS Item No. 5 - Continued PLANNING COMMISSION ACTION: The applicant -was present. There were no objectors in attendance. After a brief discussion, the Planning Commission voted unanimously to approve the site plan subject to location of fire hydrants and on -site water mains. The -vote: 8 ayes, 0 noes and 3 absent.