HomeMy WebLinkAboutS-0054-N Staff AnalysisMay 16, 1989
SUBDIVISION
ITEM NO.: D FILE NO.: S-54-N
NAME: Rain Forest Addition 2nd Preliminary
LOCATION: On the west side of Bowman Road approximately
one-half mile south of Kanis Road.
DEVELOPER: ENGINEER:
Rainey Development Co., Inc
18720 Kanis Road
Little Rock, AR 72211
821-1128
AREA: 53 acres
Marlar Engineering Co.,
Inc.
5318 J.F.K. Blvd.
No. Little Rock, AR 72116
NUMBER OF LOTS: 177
FT. NEW STREET: 7,987 Lineal Ft.
ZONING: "R-2" Single family
PROPOSED USES: Single family residences
PLANNING DISTRICT: 11
CENSUS TRACT: 40.02
VARIANCES REQUESTED:
1. To permit the ratio of lot depth to width to be greater
than the ordinance permits on Lot 177.
2. To allow the pipe stem design for Lots 85 and 122.
These two lots, together with Lot 176, are to be
dedicated to the Property Owners Association as park
areas.
3. To allow a 105 foot radius curve on Alder Drive as
indicated on the plat.
PLAT DEFICIENCIES NOTED: (January 23, 1989)
/ . Source of title.
2. Zoning reflected on and off site.
3. Need to deal with width -to -depth of lots ratio, Phase 5
specifically and Lots 73 and 74.
4. Additional detail on the Bowman Road entry design.
5. Angle exit on several streets, specific provision for
pavement termination.
6. Waiver request on pipe -stem lots as pipe -stems are
disallowed currently in the ordinance.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
7.
Dedicate
right-of-way on Bowman Road on both phases
abutting
8.
Sidewalks
on the plat as required by ordinance.
9.
Indicate
a change of name on Alder and Mahogany
Streets.
This is a continuous center line.
10.
Indicate
horizontal center line data.
11.
Indicate
relationship between the northeast corner of
Lot 29 and
the street right-of-way on Wagon Wheel.
12.
Indicate
change on the plat on Alder and Mahogany to a
50 foot
right-of-way with 27 foot pavement inasmuch as
this street does not qualify as a minor residential.
A. PROPOSAL/REQUEST:
The applicant proposes a large conventional single
family subdivision on lands that will tie Bowman Road
to a developing area off Kanis Road. Numerous
collector streets cross or enter and exit this
subdivision and its several phases. These collectors
are of utmost importance to traffic circulation in the
area.
B. EXISTING CONDITIONS:
The land is variable in elevation from east to west;
the eastern portion containing somewhat gentle slopes
and changing to some steeper slopes in the west central
area of the plat. There are drainage -ways crossing the
property north to south. The property takes its
primary access for Phase I from Bowman Road which is a
arterial street.
C. ENGINEERING COMMENTS:
1. Check divided roadway and median island. Note the
short reverse curves on Rain Forest at Bowman
Road.
2. Show preliminary street grades.
3. Show preliminary drainage plan with routing,
approximate quantities, preliminary pipe, bridge
and ditch sizes.
4. Show sidewalk one side of residential collector
and arterial streets as required by ordinance.
Show one-half Bowman Road improvements, 60 feet
pavement and 90 feet of right-of-way.
5. Address Stormwater and Excavation Ordinance
requirements.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
6. Mahogany Court will have a bad site distance if
the crest of the hill is not cut. Approval of
this street location should be made only if
Mahogany Loop grades are such that the required
site distance can be attained.
7. Street lights will be required in accordance with
Subdivision Ordinance.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
There are no apparent legal issues except the basic
ordinance requirements that have been omitted from the
plat. There are several design issues relative to
access to Bowman Road with the split intersection,
continuous center line on streets, sidewalks and the
need for specific waiver requests. One point which the
developer has raised in the cover letter on this
submittal deals with his request that this preliminary
be considered as a revision to the original preliminary
plat and that the original subdivision rules apply
concerning drainage detention design. None of the
previous phase of Point West (Rain Forest) have
required detention design. Mr. Rainey, the developer,
further points out that he has requested of the Home
Builders Association that a "smart house" project be
considered for this plat on Lots 1 and 2. He will
submit at some point a PCD on this site for the project
should these lots be accepted.
E. ANALYSIS:
The Planning Staff, in reviewing this plat, realizes
that the owner is attempting to continue a preliminary
which was approved on this property at an earlier time.
However, our feeling is that there are enough issues
involved that we should consider this as a new
preliminary plat in its entirety. This is based upon
recent changes in the Master Street Plan as to
collector streets and the requirements of the ordinance
that have not been dealt with within the plat.
F. STAFF RECOMMENDATION:
The Staff recommends deferral of the plat until the
next scheduled Subdivision Public Hearing in order to
provide sufficient time to address the concerns pointed
out by Planning and Engineering Staffs.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
SUBDIVISION COMMITTEE COMMENTS: (February 9, 1989)
Mr. Forest Marlar and Mr. Roy Rainey were present
representing this preliminary plat. There were a number of
questions raised by Mr. Marlar as to Staff comments. He
requested clarification,of the Staff's comment specifically
dealing with this preliminary plat as being a new
preliminary. His feelings were that the preliminary plat
had been previously approved in 1981 as a part of a larger
preliminary plat by the same name. During the intervening
years, hie indicated that there were a number of phases of
that preliminary plat that had been placed of record;
thereby granting permanence to this part of the preliminary
plat. It was pointed out by Mr. Marlar and Mr. Rainey that
their feeling was that the preliminary plat was being
submitted at this time in order to deal with changes in
areas such as the Master Street Plan. These changes were
the primary cause for their resubmittal and modifying the
plan from its current preliminary approval. The Planning
Staff responded by stating that it felt the plat had enough
new issues attendant that it could be called a new
preliminary plat. However, Staff was not bound by this
feeling and would take direction from the Commission on this
matter.
Richard Wood of the Planning Staff then, as directed by the
Chairman, performed a brief overview of the preliminary plat
pointing out the areas where Staff had suggested changes.
These had to do with street names and alignment on certain
streets which were reflected as minor streets but which
were, in fact, standard residential. There were a number of
pipe -stem lots which the ordinance now disallows. There
were requirements for dedication and sidewalk along Bowman
Road not reflected on the plat. Staff also pointed out that
the number of waivers that were apparent from interview
would require the Board of Directors' approval.
The Committee then moved to discussion of a request from Mr,
Ron Tyne who was present representing Winrock Development
Company. Mr..Tyne represented properties adjacent on the
north. A letter was presented from Winrock which pointed
out a need for an easement on Mr. Rainey's plat in order to
assure access to sewer service. A lengthy discussion of
this request followed during which Staff pointed out it was
a basic responsibility of the City and the Planning
Commission to provide easements for the installation of
basic utilities. This is not something out of the ordinary;
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
it is accomplished as a matter of course on many plats. Mr.
Rainey and his engineer offered comments on that subject to
the effect that they felt they should be paid for the
extension of Winrock's facility onto their property. The
Committee agreed with Staff that this was a standard
operating item and should be reflected on the plat as an
easement, especially in light of the fact that Mr. Rainey's
third phase in which the easement is required may not be
developed prior to Winrock's need. If that should occur,
then Mr. Rainey will no doubt be compensated for the
easement and sewer connection.
The Committee then questioned Mr. Rainey as to the design of
the cul-de-sac and intersecting property lines in the
northeast corner of the plat. There is an excessively deep
lot running west off Bowman Road that extends into the cul-
de-sac at an unusual angle. Mr. Marlar responded by saying
that Mr. Rainey was in negotiation with an adjacent property
owner to acquire portions of the property lying south and
east of the cul-de-sac. The acquisition of that property
would allow Mr. Rainey to plat a new configuration, thereby
allowing lots with radial lines from that cul-de-sac.
A couple of follow-up items for the engineer to work out
with the City Engineer's office involved the alignment of
Bowman Road and the question as to whether detention will be
necessary on this site, especially in light of the fact that
the preliminary plat may be ruled as an existing preliminary
plat, thereby predating the requirement for detention.
PLANNING COMMISSION ACTION: (February 21, 1989)
There were no objectors in attendance. The application was
not represented. A letter had been submitted by the
engineer, Mr. Forest Marlar, in the required time requesting
that this matter be deferred until the April 4th Planning
Commission Agenda. The Commission then discussed placing
this matter on the Consent Agenda for deferral. A motion
was made for deferral of the item as requested. The motion
passed by a vote of 8 ayes, 0 nays, 3 absent.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
PLANNING STAFF COMMENT AND UPDATE:
The Staff has reviewed a revised plan submitted by Mr.
Forest Marlar, the Engineer of Record on this project. The
revised plat addresses many of the concerns that were set
forth in the Engineering and Planning Department comments at
the previous meeting. There remain several points for the
Planning Commission to resolve, including three variances
which have now been added to the agenda and reflected on
page 1 of this write-up. Additional concerns offered by the
Public Works Department on this project deal with the need
to establish Rain Forest Drive as a collector street running
off Bowman Road. This collector street is deemed necessary
in order to carry the traffic circulation in this area until
such time as a fully fleshed out collector system is in
place. The Public Works Department feels that since the
lots on each side of this street are very shallow that the
60 foot right-of-way normally required could be reduced to
55 feet. The requirement for a 36 foot pavement should
still be the standard applied.
A second point of concern of the Engineering Department has
to do with the collector street, Point West Drive, entering
from the north and its potential connection with Banyan
Drive exiting the -south boundary. It is felt that perhaps
one street name could be assigned to this alignment thereby
committing the north/south collector at such time as the
Winrock properties are developed to the northeast.
The last point to be made by the Public Works Department is
that they feel the detention requirements cannot be waived
by the Planning Commission. They feel that this is a
requirement that would be a Board of Directors waiver issue.
It is felt that this is a new preliminary plat and should
conform to the current ordinance standards.
The Planning Staff, in its review of the revised
preliminary, note two areas that require some follow-up.
One is specific identification of the easement to serve as
sewer assess to the Winrock properties. This may be
reflected at this time, but is not specifically noted.
The last item is one of a street name suffix change on Alder
Drive and Alder Place. This should be a single street name
and "Drive" should be applied.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
SUBDIVISION COMMITTEE COMMENT: (March 23, 1989)
The application was represented by Mr. Forest Marlar, the
engineer, and Mr. Roy Rainey, the owner. The Staff
presented an update on the revised preliminary plat
submittal. Staff pointed out there were a few remaining
issues to be resolved.
Jerry Gardner of the Public Works Department pointed out
several of the issues that remained of concern to his
office. These dealt with provision of a 36 foot street
pavement in an appropriate right-of-way for Rain Forest
Drive running west off Bowman Road. He pointed out that
some additional consideration should be given to the reverse
curve design at the point of entry of this street from
Bowman Road. He indicated the transition was too short.
Mr. Gardner also pointed out that inasmuch as the detention
requirements are required by an ordinance other than the
subdivision regulations, the Planning Commission cannot
waive these standards. He indicated that the Board of
Directors would have to deal with this matter. A brief
discussion followed on these points. The engineer and Mr.
Rainey indicated they would follow up on these comments
prior to the public hearing on April 4.
Richard Wood of the Planning Staff then pointed out the last
items in the write-up that required addition work by the
plat engineer. This had to deal with the placement of the
easement that had been previously discussed to serve the
Winrock property and the changing of one of the street names
on Alder Drive/Alder Place.
PLANNING COMMISSION ACTION: (April 4, 1989)
Richard Wood of the Planning Staff offered a brief comment
on the staff recommendation and pointed out that the staff
generally supports the preliminary plat and the various
elements of the proposal except for several variances which
have been requested and a couple of items that have been
introduced by the Public Works Department.
Mr. Jerry Gardner of the City Engineer's staff was asked by
Staff to provide input on the several objections they have
to the plat proposal. Mr. Gardner outlined the several
points of concern as follows, the primary being the street
improvements for Rain Forest Drive. He pointed out that
this street will, for a number of years, provide the only
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
access to a significant subdivision. He stated that until
some unknown point in the future when Phase IV is developed,
there will not be an alternate access to either Bowman Road
or to Kanis Road on the north. Mr. Gardner suggested that
the City require this street to be constructed to the
collector width and require a wider right-of-way for its
construction. The second point of concern dealt with two
streets, one which enters this plat from the north, another
which crosses the plat in its southeastern quadrant. These
two streets are titled Banyan Drive and Point West Drive.
His concern dealt with the potential for these two collector
streets aligning with a common center line at some future
time, thereby creating a street name conflict. He felt that
this is the time to resolve this issue rather than wait to
determine the street alignment when the Winrock Developers
develop their properties. He indicated that the
intersection of these two streets would occur within the
Winrock development which is north and east of this plat.
The third concern offered by Mr. Gardner had to deal with
the requirement for redesign of the Rain Forest intersection
at Bowman Road. He indicated that this had possibly been
resolved by the developer agreeing to remove the median in
the street and change the design on the reverse curve
somewhat. A fourth point raised by Mr. Gardner, which is
not a requirement of the Subdivision Ordinance, deals with
the provision, of retention within the plat boundary for
rainfall runoff. He again pointed out, as he had on
previous occasions, that this requirement for a waiver or
variance will require approval by the Board of Directors.
A brief discussion then followed involving several of the
Commissioners and Mr. Gardner dealing with the similarity of
the collector street issue and other streets in the City
such as Shackleford Road, and collector streets within
Hillsboro Subdivision.
The Commission then asked Mr. Forest Marlar, the engineer of
record on this project, for his comments. Mr. Marlar
addressed the concerns raised by Mr. Gardner. He indicated
that he had designed this preliminary plat with the Master
Street Plan in mind and felt like he had met the Master
Street Plan standards. He indicated that if the 36 foot
collector street is imposed upon this plat, he would like to
provide that right-of-way at 50 feet with 5 foot easements
on either side rather than a 55 foot right-of-way
dedication. He further indicated that straightening of the
reverse curve would be accomplished and provision of the
larger turning radius.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
Mr. Roy Rainey, the developer, then offered comments
concerning the street name and collector street alignment
issue. He indicated he wanted to avoid conflict between his
plat and the adjacent Point West Addition. He felt that
extension of that street name to the interior of his plat
may cause conflict.
Commissioner Rector then pointed out the need for the
temporary collector street as requested by Staff. Mr.
Rainey indicated that he felt it would be no problem to
provide that street. However, he followed that comment by
indicating that the collector street, Point West, should be
and could be turned out to Bowman Road inasmuch as that
would be the shorter route for connecting a collector street
with an arterial.
Commissioner Oleson suggested that the name Banyan Drive be
left within the plat on preliminary and the issue be
addressed for conflict at some future time when the real
need could be identified. Several comments by others
indicated that this was the time to resolve this issue
rather than make a commitment on a preliminary plat.
Commissioner Rector then raised questions about the
Stormwater Detention Ordinance. A lengthy discussion
followed involving Mr. Marlar, the engineer, and Mr.
Gardner. The discussion centered on whether this is, in
fact, a new preliminary plat or an extension of a previous
approval granted in the late 1970's. Mr. Marlar indicated
that the existing Point West Addition in its several phases
has received waivers of the Detention Ordinance and that
those properties were part of this preliminary plat in the
original filing. Mr. Gardner indicated that some developers
may have been exempt from the requirements but he did not
have authority to extend such an exception. He again
indicated the City Board had that authority and
responsibility. Commissioner Nicholson then asked about the
time period for approval of preliminary plats and the effect
of that on the Detention Ordinance. Mr. Gardner identified
the forming process for phasing of plats and their relation
to the requirement for submitting plans for detention. A
general discussion then followed broadening the involvement
of the discussion to include Mr. Rainey, Mr. Marlar and
several Commissioners, the subject matter being the
Detention Ordinance primarily. Mr. Rainey closed his
remarks on the subject by describing his relationship to the
original land holdings, the subsequent history of selling
several of the parcels, and a statement that he felt he had
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
the same preliminary plat with some minor modifications.
Mr. Marlar indicated to the Commission that he had not
designed detention into this plat. Mr. Gardner indicated
the same. A lengthy discussion then followed involving all
of the various parties. The discussion centered primarily
on the detention issue and a means for resolving the street
name conflict.
Several attempts at a motion were made resulting in a motion
for approval of the preliminary plat subject to the deferral
of the Master Street Plan alignment and name issue until
May 16th. The motion included the approval of several
variances which would be recommended for approval to the
Board of Directors. The motion also included an
understanding that the developer had agreed to certain
modifications to meet the Public Works Department
requirements. Those requirements were specified in a letter
dated April 4, 1989 and were five in number:
Item #1 dealt with the Rain Forest Drive construction.
This was agreed to be 36 feet of pavement in a 50 foot
right-of-way with 5 foot parallel easements.
Item 92 dealt with the reverse curve which was to be
eliminated.
Item #3, the Banyan Drive street name conflict was to
be deferred to May 16 for resolution.
Item #4, the substandard center line radius on Alder
Drive would be modified to 150 feet.
Item # 5, the Stormwater Detention requirements to be
forwarded to the City Board for variance consideration.
The motion also included recommendation of approval on two
variances initially requested dealing with the ratio of lot
depth to width and the provision of pipe stem lots on two
lots. A vote was offered on the motion as made. The vote
produced 9 ayes, 0 nays, 2 absent. The motion passed.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
A lengthy discussion of this matter then followed, the
result of which was a member of the Commission calling the
item for a vote. The Chairman placed the matter on the
floor as presented for a vote. The vote on the action was
as follows: 2 ayes, 4 nays, 2 abstaining, 3 absent. As a
result of this vote, the matter was determined to be
automatically deferred until the Planning Commission meeting
on May 16, 1989 due to the failure to obtain the minimum
6 votes for final action.
As a result of the vote, the several items contained within
the discussion of the Commission and applicant were
presented to the Staff in the form of requests for a report.
These included:
1. The Public Works Department to present a graphic and
written report on the several phases of Pointe West and
Rain Forest Subdivisions which have been approved and
constructed, the purpose of which would show the
relationship of the street systems, the ties between
the several plats and to this proposal, and, last, a
record of the review and position of the Public Works
Department on the several final plats as to the
requirement for the stormwater detention requirements.
2. The Planning Staff was directed to report in two weeks
on those circumstances which were used by Staff and
specified by ordinance as permitting the continuance of
a preliminary plat beyond the one-year initial
approval.
3. The City Attorney was requested to review, for legal
opinion, the applicability of the Stormwater Detention
Ordinance on a preliminary plat which was approved by
the Commission prior to the adoption of the Stormwater
Detention Ordinance.
PLANNING COMMISSION ACTION: (May 16, 1989)
The applicant was present. The City Attorney stated that
due to a lapse of time, as well as a preliminary plat
redesign, the applicant would be bound by the Detention
Ordinance requirements. Mr. Anson Nix, a Little Rock
resident, stated that due to the current drainage problems
of the City, the developer should be required to comply with
the Detention Ordinance.
May 16, 1989
SUBDIVISION
ITEM NO.: D (Continued)
...
Mr. Roy Rainey, owner of the proposal, argued that the plat
was part of an overall preliminary plat that was approved
prior to the current Detention Ordinance requirements and,
therefore, should not be required of this plat. Mr. Rainey
also stated that he agreed to comply with the requirement to
name the collector street Pointe West as it continued
through his proposal.
The Commission then voted 0 ayes, 8 noes, 1 abstention
(McDaniel) and 2 absent to deny the variance from the
Detention Ordinance requirements.
1.
Meeting Date: May 2, 1989
2.
Case No.: S-54-6
3_
Request: For Subdivision Ordinance
waivers to permit
lot dept-to-width ratios which exceed
ordinance
standards and permission to plat two
pipe -stem lots.
4.
Location: On the west side of Bowman
Road
approximately one -quarter mile south
of Kanis Road.
5.
Owner/Applicant: Roy Rainey
6.
Existing Status: Vacant land
7.
Pr_oposed Use: New single family subdivision
with
177 lots.
8. Staff Recommendation: The Planning Staff recommends
approval of the preliminary plat with the several
modifications as included in the Staff's recommendation
dealing with design of street center line, street name
change, collector street status on Rain Forest Drive,
reverse curve redesign at point of entry to subdivision
and working with Staff and Public Works Department to
resolve the street name conflict on the Point West
Drive collector street. The issue of on -site detention
of stormwater was determined to be a matter for the
Board of Directors resolution and possible variance.
Therefore, the Staff and Planning Commission rendered
no decision.
9. P I ann i ng_ Comm_i_sS i on, Recommenda.t i on: Approval of the
preliminary plat subject to those items outlined in the
Staff recommendation.
10. Recommendation Forwarded With: 9 ayes, 0 nays,
2 absent.
11. ObJectors: None
FILE NO.: S-54-N
NAME: Rain Forest Addition 2nd Preliminary
LOCATION: On the west side of Bowman. Road approximately
one-half mile south of Kanis Road.
DEVELOPER:
Rainey Development Co., Inc.
18720 Kanis Road
Little Rock, AR 72211
821-1128
AREA: 53 acres
FT. NEW STREET: 7,987 Lineal Ft.
ZONING: "R-2" Single family
ENGINEER:
Marlar Engineering Co.,
Inc.
5318 J.F.K. Blvd.
No. Little Rock, AR 72116
NUMBER OF LOTS: 177
PROPOSED USES: Single family residences. 11
CENSUS TRACT: 40.02
VARIANCES REQUESTED:
1. To permit the ratio of lot depth to width to be greater
than the ordinance permits on Lot
177.
2.
To allow the pipe stem design for
Lots 85 and 122.
These two lots, together with Lot
176, are to be
dedicated to the Property Owners
Association as park
areas.
3.
To allow a 105 foot radius curve
on Alder Drive as
indicated on the plat.
PLAT
DEFICIENCIES NOTED: (January
23, 1989)
1.
Source of tiā¢fIe.
2.
Zoning reflected on and off site.
3.
Need to deal with width -to -depth
of lots ratio, Phase 5
specifically and Lots 73 and 74.
4.
Additional detail on the Bowman Road
entry design.
5.
Angle exit on several streets, specific
provision for
pavement termination.
6.
Waiver request on pipe -stem lots
as pipe -stems are
disallowed currently in the ordinance.
(Continued)
7.
Dedicate
right-of-way on Bowman Road on both phases
abutting
8.
Sidewalks
on the plat as required by ordinance.
9.
Indicate
a change of name on Alder and Mahogany
Streets.
This is a continuous center line.
10.
Indicate
horizontal center line data.
11.
Indicate
relationship between the northeast corner of
Lot 29 and
the street right-of-way on Wagon Wheel.
12_
Indicate
change on the plat on Alder and Mahogany to a
50 foot
right-of-way with 27 foot pavement inasmuch as
this street
does not qualify as a minor residential.
A . PROPOSAL(_R_EQUEST
The applicant proposes a large conventional single
family subdivision on lands that will tie Bowman Road
to a developing area off Kanis Road. Numerous
collector streets cross or enter and exit this
subdivision and its several phases. These collectors
are of utmost importance to traffic circulation in the
area.
B. EXISTING CONDITIONS:
The land is variable in elevation from east to west;
the eastern portion containing somewhat gentle slopes
and changing to some steeper slopes in the west central
area of the plat. There are drainage -ways crossing the
property north to south. The property takes its
primary access for Phase I from Bowman Road which is a
arterial street.
C. ENGINEERING COMMENTS:
1.
Check divided roadway and median island. Note the
short reverse curves on
Rain Forest at Bowman
Road.
2.
Show preliminary street
grades.
3.
Show preliminary drainage
plan with routing,
approximate quantities,
preliminary pipe, bridge
and ditch sizes.
4.
Show sidewalk one side
of residential collector
and arterial streets as
required by ordinance.
Show one-half Bowman Road
improvements, 60 feet
pavement and 90 feet of
right-of-way.
5.
Address Stormwater and
Excavation Ordinance
requirements.
(Continued)
6. Mahogany Court will have a bad site distance if
the crest of the hill is not cut. Approval of
this street location should be made only if
Mahogany Loop grades are such that the required
site distance can be attained.
7. Street lights will be required in accordance with
Subdivision Ordinance.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
There are no apparent legal issues except the basic
ordinance requirements that have been omitted from the
plat. There are several design issues relative to
access to Bowman Road with the split intersection,
continuous center line on streets, sidewalks and the
need for specific waiver requests. One point which the
developer has raised in the cover letter on this
submittal deals with his request that this preliminary
be considered as a revision to the original preliminary
plat and that the original subdivision rules apply
concerning drainage detention design. None of the
previous phase of Point West (Rain Forest) have
required detention design. Mr. Rainey, the developer,
further points out that he has requested of the Home
Builders Association that a "smart house" project be
considered for this plat on Lots 1 and 2. He will
submit at some point a PCD on this site for the project
should these lots be accepted.
E. ANALYSIS:
The Planning Staff, in reviewing this plat, realizes
that the owner is attempting to continue a preliminary
which was approved on this property at an earlier time.
However, our feeling is that there are enough issues
involved that we should consider this as a new
preliminary ,plat in its entirety. This is based upon
recent changes in the Master Street Plan as to
collector streets and the requirements of the ordinance
that have not been dealt with within the plat.
F. STAFF RECOMMENDATION:
The Staff recommends deferral of the plat until the
next scheduled Subdivision Public Hearing in order to
provide sufficient time to address the concerns pointed
out by Planning and Engineering Staffs.
(Continued)
SUBDIVISION COMMITTEE COMMENTS: (February 9, 1989)
Mr. Forest Marlar and Mr. Roy Rainey were present
representing this preliminary plat. There were a number of
questions raised by Mr. Marlar as to Staff comments. He
requested clarification of the Staff's comment specifically
dealing with this preliminary plat as being a new
preliminary. His feelings were that the preliminary plat
had been previously approved in 1981 as a part of a larger
preliminary plat by the same name. During the intervening
years, he indicated that there were a number of phases of
that preliminary plat that had been placed of record;
thereby granting permanence to this part of the preliminary
plat. .It was pointed out by Mr. Marlar and Mr. Rainey that
their feeling was that the preliminary plat was being
submitted at this time in order to deal with changes in
areas such as the Master Street Plan. These changes were
the primary cause for their resubmittal and modifying the
plan from its current preliminary approval. The Planning
Staff responded by stating that it felt the plat had enough
new issues attendant that it could be called a new
preliminary plat. However, Staff was not bound by this
feeling and would take direction from the Commission on this
matter.
Richard Wood of the Planning Staff then, as directed by the
Chairman, performed a brief overview of the preliminary plat
pointing out the areas where Staff had suggested changes.
These had to do with street names and alignment on certain
streets which were reflected as minor streets but which
were, in fact, standard residential. There were a nurdber of
pipe -stem hots which the ordinance now disallows. There
were requirements for dedication and sidewalk along Bowman
Road not reflected on the plat. Staff also pointed out that
the number of waivers that were apparent from interview
would require the Board of Directors' approval.
The Committee then moved to discussion of a request from Mr.
Ron Tyne who was present representing Winrock Development
Company. Mr. Tyne represented properties adjacent on the
north. A letter was presented from Winrock which pointed
out a need for an easement on Mr. Rainey's plat in order to
assure access to sewer service. A lengthy discussion of
this request followed during which Staff pointed out it was
a basic responsibility of the City and the Planning
Commission to provide easements for the installation of
basic utilities. This is not something out of the ordinary;
(Continued)
it is accomplished as a matter of course on many plats. Mr.
Rainey and his engineer offered comments on that subject to
the effect that they felt they should be paid for the
extension of Winrock's facility onto their property. The
Committee agreed with Staff that this was a standard
operating item and should be reflected on the plat as an
easement, especially in light of the fact that Mr. Rainey's
third phase in which the easement is required may not be
developed prior to Winrock's need. If that should occur,
then Mr. Rainey will no doubt be compensated for the
easement and sewer connection.
The Committee then questioned Mr. Rainey as to the design of
the cul-de-sac and intersecting property lines in the
northeast corner of the plat. There is an excessively deep
lot running west off Bowman Road that extends into the cul-
de-sac at an unusual angle. Mr. Marlar responded by saying
that Mr. Rainey was in negotiation with an adjacent property
owner to acquire portions of the property lying south and
east of the cul-de-sac. The acquisition of that property
would allow Mr. Rainey to plat a new configuration, thereby
allowing lots with radial lines from that cul-de-sac.
A couple of follow-up items for the engineer to work out
with the City Engineer's office involved the alignment of
Bowman Road and the question as to whether detention will be
necessary on this site, especially in light of the fact that
the preliminary plat may be ruled as an existing preliminary
plat, thereby predating the requirement for detention.
PLANNING COMMISSION ACTION: (February 21, 1989)
There were no objectors in attendance. The application was
not represented. A letter had been submitted by the
engineer, Mr. Forest Marlar, in the required time requesting
that this matter.be deferred until the April 4th Planning
Commission Agenda-. The Commission then discussed placing
this matter on the Consent Agenda for deferral. A motion
was made for deferral of the item as requested. The motion
passed by a vote of 8 ayes, 0 nays, 3 absent.
(Continued)
PLANNING STAFF COMMENT AND UPDATE;
The Staff has reviewed a revised plan submitted by Mr.
Forest Marlar, the Engineer of Record on this project. The
revised plat addresses many of the concerns that were set
forth in the Engineering and Planning Department comments at
the previous meeting. There remain several points for the
Planning Commission to resolve, including three variances
which have now been added to the agenda and reflected on
page 1 of this write-up. Additional concerns offered by the
Public Works Department on this project deal with the need
to establish Rain Forest Drive as a collector street running
off Bowman Road. This collector street is deemed necessary
in order to carry the traffic circulation in this area until
such time as a fully fleshed out collector system is in
place. The Public Works Department feels that since the
lots on each side of this street are very shallow that the
60 foot right-of-way normally required could be reduced to
55 feet. The requirement for a 36 foot pavement should
still be the standard applied.
A second point of concern of the Engineering Department has
to do with the collector street, Point West Drive, entering
from the north and its potential connection with Banyan
Drive exiting the south boundary. It is felt that perhaps
one street name could be assigned to this alignment thereby
committing the north/south collector at such time as the
Winrock properties are developed to the northeast.
The last point to be made by the Public Works Department is
that they feel the detention requirements cannot be waived
by the Planning Commission. They feel that this is a
requirement that would be a Board of Directors waiver issue.
It is felt that this is a new preliminary plat and should
conform to the current ordinance standards.
The Planning Staff, in its revicw of the revised
preliminary, note'two areas that require some follow-up.
One is specific identification of the easement to serve as
sewer assess to the Winrock properties. This may be
reflected at this time, but is not specifically noted.
The last item is one of a street name suffix change on Alder
Drive and Alder Place. This should be a single street name
and "Drive" should be applied.
(Continued)
SUBDIVISION COMMITTEE COMMENT: (March 23, 1989)
The application was represented by Mr. Forest Marlar, the
engineer, and Mr. Roy Rainey, the owner. The Staff
presented an update on the revised preliminary plat
submittal. Staff pointed out there were a few remaining
issues to be resolved.
Jerry Gardner of the Public Works Department pointed out
several of the issues that remained of concern to his
office. These dealt with provision of a 36 foot street
pavement in an appropriate right-of-way for Rain Forest
Drive running west off Bowman Road. He pointed out that
some additional consideration should be given to the reverse
curve design at the point of entry of this street from
Bowman Road. He indicated the transition was too short.
Mr. Gardner also pointed out that inasmuch as the detention
requirements are required by an ordinance other than the
subdivision regulations, the Planning Commission cannot
waive these standards. He indicated that the Board of
Directors would have to deal with this matter. A brief
discussion followed on these points. The engineer and Mr.
Rainey indicated they would follow up on these comments
prior to the public hearing on April 4.
Richard Wood of the Planning Staff then pointed out the last
items in the write-up that required addition work by the
plat engineer. This had to deal with the placement of the
easement that had been previously discussed to serve the
Winrock property and the changing of one of the street names
on Alder Drive/Alder Place.
PLANNING COMMISSION ACTION: (April 4, 1989)
Richard Wood of the Planning Staff offered a brief comment
on the staff recommendation and pointed out that the staff
generally supports the preliminary plat and the various
elements of the proposal except for several variances which
have been requested and a couple of items that have been
introduced by the Public Works Department.
Mr. Jerry Gardner of the City Engineer's staff was asked by
Staff to provide input on the several objections they have
to the plat proposal. Mr. Gardner outlined the several
points of concern as follows, the primary being the street
improvements for Rain Forest Drive. He pointed out that
this street will, for a number of years, provide the only
(Continued)_
access to a significant subdivision. He stated that until
some unknown point in the future when Phase IV is developed,
there will not be an alternate access to either Bowman Road
or to Kanis Road on the north. Mr. Gardner suggested that
the City require this street to be constructed to the
collector width and require a wider right-of-way for its
construction. The second point of concern dealt with two
streets, one which enters this plat from the north, another
which crosses the plat in its southeastern quadrant. These
two streets are titled Banyan Drive and Point West Drive.
His concern dealt with the potential for these two collector
streets aligning with a common center line at some future
time, thereby creating a street name conflict. He felt that
this is the time to resolve this issue rather than wait to
determine the street alignment when the Winrock Developers
develop their properties. He indicated that the
intersection of these two streets would occur within the
Winrock development which is north and east of this plat.
The third concern offered by Mr. Gardner had to deal with
the requirement for redesign of the Rain Forest intersection
at Bowman Road. He indicated that this had possibly been
resolved by the developer agreeing to remove the median in
the street and change the design on the reverse curve
somewhat. A fourth point raised by Mr. Gardner, which is
not a requirement of the Subdivision Ordinance, deals with
the provision of retention within the plat boundary for
rainfall runoff. He again pointed out, as he had on
previous occasions, that this requirement for a waiver or
variance will require approval by the Boar,' of Directors.
A brief discussion then followed involving several of the
Commissioners and Mr. Gardner dealing with the similarity of
the collector street issue and other streets in the City
such as Shackleford Road, and collector streets within
Hillsboro Subdivision.
The Commission then asked Mr. Forest Marlar, the engineer of
record on this project, for his comments. Mr. Marlar
addressed the concerns raised by Mr. Gardner. He indicated
that he had designed this preliminary plat with the Master
Street Plan in mind and felt like he had met the Master
Street Plan standards. He indicated that if the 36 foot
collector street is imposed upon this plat, he would like to
provide that right-of-way at 50 feet with 5 foot easements
on either side rather than a 55 foot right-of-way
dedication. He further indicated that straightening of the
reverse curve would be accomplished and provision of the
larger turning radius.
(Continued)
Mr. Roy Rainey, the developer, then offered comments
concerning the street name and collector street alignment
issue. He indicated he wanted to avoid conflict between his
plat and the adjacent Point West Addition. He felt that
extension of that street name to the interior of his plat
may cause conflict.
Commissioner Rector then pointed out the need for the
temporary collector street as requested by Staff. Mr.
Rainey indicated that he felt it would be no problem to
provide that street. However, he followed that comment by
indicating that the collector street, Point West, should be
and could be turned out to Bowman Road inasmuch as that
would be the shorter route for connecting a collector street
with an arterial.
Commissioner Oleson suggested that the name Banyan Drive be
left within the plat on preliminary and the issue be
addressed for conflict at some future time when the real
need could be identified. Several comments by others
indicated that this was the time to resolve this issue
rather than make a commitment on a preliminary plat.
Commissioner Rector then raised questions about the
Stormwater Detention Ordinance. A lengthy discussion
followed involving Mr. Marlar, the engineer, and Mr.
Gardner. The discussion centered on whether this is, in
fact, a new preliminary plat or an extension of a previous
approval granted in the late 1970's. Mr. Marlar indicated
that the existing Point West Addition in its several phases
has received waivers of the Detention Ordinance and that
those properties were part of this preliminary plat in the
original filing. Mr. Gardner indicated that some developers
may have been exempt from the requirements but he did not
have authority to extend such an exception. He again
indicated the City Board had that authority and
responsibility. Commissioner Nicholson then asked about the
time period for approval of preliminary plats and the effect
of that on the Detention Ordinance. Mr. Gardner identified
the forming process for phasing of plats and their relation
to the requirement for submitting plans for detention. A
general discussion then followed broadening the involvement
of the discussion to include Mr. Rainey, Mr. Marlar and
several Commissioners, the subject matter being the
Detention Ordinance primarily. Mr. Rainey closed his
remarks on the subject by describing his relationship to the
original land holdings, the subsequent history of selling
several of the parcels, and a statement that he felt he had
(Continued)
the same preliminary plat with some minor modifications.
Mr. Marlar indicated to the Commission that he had not
designed detention into this plat. Mr. Gardner indicated
the same. A lengthy discussion then followed involving all
of the various parties. The discussion centered primarily
on the detention issue and a means for resolving the street
name conflict.
Several attempts at a motion were made resulting in a motion
for approval of the preliminary plat subject to the deferral
of the Master Street Plan alignment and name issue until
May 16th. The motion included the approval of several
variances which would be recommended for approval to the
Board of Directors. The motion also included an
understanding that the developer had agreed to certain
modifications to meet the Public Works Department
requirements. Those requirements were specified in a letter
dated April 4, 1989 and were five in number:
Item 91 dealt with the Rain Forest Drive construction.
This was agreed to be 36 feet of pavement in a 50 foot
right-of-way with 5 foot parallel easements.
Item #2 dealt with the reverse curve which was to be
eliminated.
Item #3, the Banyan Drive street name conflict was to
be deferred to May 16 for resolution.
Item #4, the substandard center line radius on Alder
Drive would be modified to 150 feet.
Item # 5, the Stormwater Detention requirements to be
forwarded to the City Board for variance consideration.
The motion also included recommendation of approval on two
variances initially requested dealing with the ratio of lot
depth to width and the provision of pipe stem lots on two
lots. A vote was offered on the motion as made. The vote
produced 9 ayes, 0 nays, 2 absent. The motion passed.
February 21, 1989
SUBDIVISION
ITEM NO.: 3 (Continued)
it is accomplished as a matter of course on many plats. Mr.
Rainey and his engineer offered comments on that subject to
the effect that they felt they should be paid for the
extension of Winrock's facility onto their property. The
Committee agreed with Staff that this was a standard
operating item and should be reflected on the plat as an
easement, especially in light of the fact that Mr. Rainey's
third phase in which the easement is required may not be
developed prior to Winrock's need. If that should occur,
then Mr. Rainey will no doubt be compensated for the
easement and sewer connection.
The Committee then questioned Mr. Rainey as to the design of
the cul-de-sac and intersecting property lines in the
northeast corner of the plat. There is an excessively deep
lot running west off Bowman Road that extends into the cul-
de-sac at an unusual angle. Mr. Marlar responded by saying
that Mr. Rainey was in negotiation with an adjacent property
owner to acquire portions of the property lying south and
east of the cul-de-sac. The acquisition of that property
would allow Mr. Rainey to plat a new configuration, thereby
allowing lots with radial lines from that cul-de-sac.
A couple of follow-up items for the engineer to work out
with the City Engineer's office involved the alignment of
Bowman Road and the question as to whether detention will be
necessary on this site, especially in light of the fact that
the preliminary plat may be ruled as an existing preliminary
plat, thereby predating the requirement for detention.
PLANNING COMMISSION ACTION: (February 21, 1989)
There were no objectors in attendance. The application was
not represented. A letter had been submitted by the
engineer, Mr. Forest Marlar, in the required time requesting
that this matter be deferred until the April 4th Planning
Commission Agenda. The Commission then discussed placing
this matter on the Consent Agenda for deferral. A motion
was made for deferral of the item as requested. The motion
passed by a vote of 8 ayes, 0 nays, 3 absent.