Loading...
HomeMy WebLinkAboutS-0050-K Map 3'40"�l LIGHT DUTY PA N G HEAVY DUTY P AV I N G 6" SB-2 & 2" HMAC 8" SB-2 &3" HMAC 50 0 50 Note: This contract shall include all grading work and erosion control measures. All other storm drainage and utility work shown GRADING PLAN on this plan is not part of this contract. 50 SCALE 150 NTION CALCULATIONS 1 /I Acres / I Undeve pad DevtO2 ant 0. 5 itration (min.) 1 II Intensity (in./hr.) 7.1 8.5 Doff Rate (R) = 0.92(8.5)-0.55(7.1) = 3.92 in./hr. Tie Formula luired=RxA%Tex60 = 3.92 x 12.83 x 5 x 60 15,E cubic foot vided CMP x 150' = 1060 cubic foot Inlets x 12' = 235 cubic foot = I295 cubic foot 3r Undevolped Flow at Northwest Corner to 1.2 Acres to 1.0 Acres 2.2 Acres ent 0.44 itration 20 min. II Intensity 5.4 In./hr. 2.2) = 5.2 cfs P '29hj" x(2 x 32.2 x 8)/2 5.2 cfs 'IE ]IDA717E1�� �.�O(CC71°1�,�9 iCC, CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING PLEASANT RIDGE 401 VICTORY STREET LITTLE ROCK, ARKANSAS 72201 Revised Date 4-21 —97 Scale Nor. I Vert. Sheet 4 of U- Job No. 97-0081 j2- I Survey By: I Drawn By: I Checked Bv: I Aooroved Bv: 1 LITTLE ROCK, ARKANSAS