HomeMy WebLinkAboutZ-10027 Elevations 06252410
12
10
1210
12
10
12
10
12
Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"Header
31'-0 1/4"8'-10 1/4"Highest Ridge
37'-8 5/16"6'-8 1/16"CEMENT SIDING
ARCHITECTURAL ASPHALT SHINGLES
10/12 ROOF PITCH (RAISE 3"+/- TO MATCH 8/12 FASCIA)
METAL FASCIA
PRECAST LINTEL & CROWN
BRICK VENEER
CAST STONE TRIM
PRECAST LEDGE
BRICK BATT COURSE
PRECAST TRIM
SOLDIER COURSE
PRECAST LINTEL & CROWN
PRECAST TRIM
PRECAST COLUMNS
ALUMINUM CLAD WOOD WINDOWS
BARREL ROOF W/ METAL ROOF
10
12
10
12
10
12
10
12
Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"Highest Ridge
37'-8 5/16"15'-6 5/16"Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"Highest Ridge
37'-8 5/16"15'-6 5/16"PROJECT TITLECONTENTSELEVATIONSDATESHEETA 5.0GENERAL ELEVATION NOTES:
1.
2.
3.
EXTERIOR FLASHING TO BE CORRECTLY INSTALLED AT
ALL CHIMNEY CONNECTIONS BETWEEN ROOFS, WALLS,
CHIMNEYS, PROJECTIONS AND PENETRATIONS AS
REQUIRED BY APPROVED CONSTRUCTION PRACTICES.
ALL PLUMBING AND MECHANICAL VENTS TO BE
LOCATED CLOSE TOGETHER WITHIN THE PROVIDED
CHASE SPACE WHEN POSSIBLE TO MINIMIZE THE
NUMBER OF ROOF PENETRATIONS. ALL METAL AND PVC
VENTS AND PENETRATIONS TO BE PRIMED AND PAINTED
TO CLOSELY MATCH THE ROOF COLOR.
CONTRACTOR TO LOCATE GUTTERS AND DOWN SPOUTS
TO ALLOW POSITIVE DRAINAGE AWAY FROM THE
BUILDING. GUTTERS AND DOWN SPOUTS TO CLOSELY
MATCH TRIM COLOR. VERIFY WITH OWNER ON GUTTER
AND DOWN SPOUT NEEDS.
2 SOUTH ELEVATION
3/16" = 1'-0"
1 NORTH ELEVATION
3/16" = 1'-0"5607 COUNTRY CLUB BLVD4/6/24
8
12
8
128
12
8
12
8
12
8
12
8
12
Top of Subfloor - 1st Floor
0'-0"
Header
8'-0 1/2"8'-0 1/2"Top of Wall
10'-1 1/8"2'-0 5/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Header
19'-6 3/8"8'-0 1/2"Top of Wall
20'-7"1'-0 5/8"Top of Rafter Plate
22'-2"1'-7"Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"8
12
8
12
8
12
8
12
8
12
8
12
4
12
8
12
Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"Top of Subfloor - 1st Floor
0'-0"
Top of Wall
10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor
11'-5 7/8"1'-4 3/4"Top of Wall
20'-7"9'-1 1/8"Top of Rafter Plate
22'-2"1'-7"PROJECT TITLECONTENTSELEVATIONSDATESHEETA 5.1GENERAL ELEVATION NOTES:
1.
2.
3.
EXTERIOR FLASHING TO BE CORRECTLY INSTALLED AT
ALL CHIMNEY CONNECTIONS BETWEEN ROOFS, WALLS,
CHIMNEYS, PROJECTIONS AND PENETRATIONS AS
REQUIRED BY APPROVED CONSTRUCTION PRACTICES.
ALL PLUMBING AND MECHANICAL VENTS TO BE
LOCATED CLOSE TOGETHER WITHIN THE PROVIDED
CHASE SPACE WHEN POSSIBLE TO MINIMIZE THE
NUMBER OF ROOF PENETRATIONS. ALL METAL AND PVC
VENTS AND PENETRATIONS TO BE PRIMED AND PAINTED
TO CLOSELY MATCH THE ROOF COLOR.
CONTRACTOR TO LOCATE GUTTERS AND DOWN SPOUTS
TO ALLOW POSITIVE DRAINAGE AWAY FROM THE
BUILDING. GUTTERS AND DOWN SPOUTS TO CLOSELY
MATCH TRIM COLOR. VERIFY WITH OWNER ON GUTTER
AND DOWN SPOUT NEEDS.
2 EAST ELEVATION
3/16" = 1'-0"
1 WEST ELEVATION
3/16" = 1'-0"5607 COUNTRY CLUB BLVD4/6/24