Loading...
HomeMy WebLinkAboutZ-10027 Elevations 06252410 12 10 1210 12 10 12 10 12 Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"Header 31'-0 1/4"8'-10 1/4"Highest Ridge 37'-8 5/16"6'-8 1/16"CEMENT SIDING ARCHITECTURAL ASPHALT SHINGLES 10/12 ROOF PITCH (RAISE 3"+/- TO MATCH 8/12 FASCIA) METAL FASCIA PRECAST LINTEL & CROWN BRICK VENEER CAST STONE TRIM PRECAST LEDGE BRICK BATT COURSE PRECAST TRIM SOLDIER COURSE PRECAST LINTEL & CROWN PRECAST TRIM PRECAST COLUMNS ALUMINUM CLAD WOOD WINDOWS BARREL ROOF W/ METAL ROOF 10 12 10 12 10 12 10 12 Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"Highest Ridge 37'-8 5/16"15'-6 5/16"Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"Highest Ridge 37'-8 5/16"15'-6 5/16"PROJECT TITLECONTENTSELEVATIONSDATESHEETA 5.0GENERAL ELEVATION NOTES: 1. 2. 3. EXTERIOR FLASHING TO BE CORRECTLY INSTALLED AT ALL CHIMNEY CONNECTIONS BETWEEN ROOFS, WALLS, CHIMNEYS, PROJECTIONS AND PENETRATIONS AS REQUIRED BY APPROVED CONSTRUCTION PRACTICES. ALL PLUMBING AND MECHANICAL VENTS TO BE LOCATED CLOSE TOGETHER WITHIN THE PROVIDED CHASE SPACE WHEN POSSIBLE TO MINIMIZE THE NUMBER OF ROOF PENETRATIONS. ALL METAL AND PVC VENTS AND PENETRATIONS TO BE PRIMED AND PAINTED TO CLOSELY MATCH THE ROOF COLOR. CONTRACTOR TO LOCATE GUTTERS AND DOWN SPOUTS TO ALLOW POSITIVE DRAINAGE AWAY FROM THE BUILDING. GUTTERS AND DOWN SPOUTS TO CLOSELY MATCH TRIM COLOR. VERIFY WITH OWNER ON GUTTER AND DOWN SPOUT NEEDS. 2 SOUTH ELEVATION 3/16" = 1'-0" 1 NORTH ELEVATION 3/16" = 1'-0"5607 COUNTRY CLUB BLVD4/6/24 8 12 8 128 12 8 12 8 12 8 12 8 12 Top of Subfloor - 1st Floor 0'-0" Header 8'-0 1/2"8'-0 1/2"Top of Wall 10'-1 1/8"2'-0 5/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Header 19'-6 3/8"8'-0 1/2"Top of Wall 20'-7"1'-0 5/8"Top of Rafter Plate 22'-2"1'-7"Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"8 12 8 12 8 12 8 12 8 12 8 12 4 12 8 12 Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"Top of Subfloor - 1st Floor 0'-0" Top of Wall 10'-1 1/8"10'-1 1/8"Top of Subfloor - 2nd Floor 11'-5 7/8"1'-4 3/4"Top of Wall 20'-7"9'-1 1/8"Top of Rafter Plate 22'-2"1'-7"PROJECT TITLECONTENTSELEVATIONSDATESHEETA 5.1GENERAL ELEVATION NOTES: 1. 2. 3. EXTERIOR FLASHING TO BE CORRECTLY INSTALLED AT ALL CHIMNEY CONNECTIONS BETWEEN ROOFS, WALLS, CHIMNEYS, PROJECTIONS AND PENETRATIONS AS REQUIRED BY APPROVED CONSTRUCTION PRACTICES. ALL PLUMBING AND MECHANICAL VENTS TO BE LOCATED CLOSE TOGETHER WITHIN THE PROVIDED CHASE SPACE WHEN POSSIBLE TO MINIMIZE THE NUMBER OF ROOF PENETRATIONS. ALL METAL AND PVC VENTS AND PENETRATIONS TO BE PRIMED AND PAINTED TO CLOSELY MATCH THE ROOF COLOR. CONTRACTOR TO LOCATE GUTTERS AND DOWN SPOUTS TO ALLOW POSITIVE DRAINAGE AWAY FROM THE BUILDING. GUTTERS AND DOWN SPOUTS TO CLOSELY MATCH TRIM COLOR. VERIFY WITH OWNER ON GUTTER AND DOWN SPOUT NEEDS. 2 EAST ELEVATION 3/16" = 1'-0" 1 WEST ELEVATION 3/16" = 1'-0"5607 COUNTRY CLUB BLVD4/6/24