Loading...
HomeMy WebLinkAboutS-0969-L ApplicationCity of Little Rock Planning and Development Filing Fees Date 20 i' Annexation $ Board of Adjustment $, Cond Use Permit/T U P $ Final Plat Planned Unit Dev $ Preliminaiy Plat $. Special Use Permit $� Rezoning $ Site Plans $ Street Name Change $ Street Name Signs Number at ea $ Public Hearing Signs Number at ea $ . Total $ 1 C 418 File No Location Applic OL By i CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: CHENAL PARK CENTRE LOT 4 INSPECTOR REPORT. I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: V LLv- REPORT TRAFFIC ENGINEER I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. l l — — - - Civil Engineer I/II Date: SURVEYOR REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. 2 Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. )L', r Date: I p /25b A' Design Review Engineer/Civil Engineering Manager Date: /� 3 Effective: OCT 23, 2018 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: CHENAL PARK CENTRE LOT 4 INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist mate: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. r r 'V,� l _ Addressing Specialist Date: ! D 2 Z �.. TRAFFIC ENGINEER REPORTy I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. - - - - Civil Engineer I/II Date: 1 D 123 SURVEYOR REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. _2_ Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. Date: I Design Review Engineer/Civil Engineering Manager Effective: OCT 23, 2018 Date: /�-e>2 Carney, Dana From: Brad Peterson <Brad.Peterson@craftontull.com> Sent: Thursday, October 18, 2018 10:29 AM To: Carney, Dana; Floriani, Vince Cc: Greg Sullivan; Jason Grayham Subject: FW: Lots 3 & 4 Chenal Centre Attachments: Chenal Utility Approvals; FINAL PLAT LOT 4 10-17-18.pdf, FINAL PLAT LOT 3 10-17-18.pdf; Lot 3 and 4 Declaration - Executed 2018_10_16_16_19_04.PDF Dana and Vince, We have received approval from LRWRA on the final plats for the Chenal Park Centre Lots 3 & 4. The email approval from Vince Hotho is below and PDFs of the other email approvals are in the attached email that Greg Sullivan sent to Donna. I've attached the latest plat documents and the Declaration that will incorporate these two lots into the recorded Restrictions and Covenants for the subdivision. Is there anything else needed before we bring in copies of the plat documents to be signed by the City? Thanks, Brad Brad Peterson, P.E., CFM, LEED AP Vice President I Infrastructure `` Craffon Tull Office: 501-664-3245 1 Direct: 501-748-8246 1 Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craffontull.com Disclaimer This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Thank you, we appreciate your cooperation. From: Vincent Hotho <Steven.Hotho@Irwra.com> Sent: Thursday, October 18, 2018 8:39 AM To: Greg Sullivan <Greg.Sullivan@craftontull.com> Cc: Brad Peterson <Brad.Pete rson@craftontuIl.com>; James, Donna <DJames@littlerock.gov> Subject: RE: Lots 3 & 4 Chenal Centre Sorry Greg, I thought I had already done it. LRWRA has no objection to the referenced plat. Thanks, Vince Vince Hotho Engineering Program Supervisor 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www.Irwra.com LITTLE ROCK Water Reclamation ALMor'n ONE WATER PUTUR. N. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Greg Sullivan <Greg.Sullivan@craftontull.com> Sent: Wednesday, October 17, 2018 4:19 PM To: Vincent Hotho <Steven.Hoth❑ @Irwra.com> Cc: Brad Peterson <Brad.Peterson_@craftontull.com> Subject: Lots 3 & 4 Chenal Centre Vince, Now that you have received the closeout documents, I would appreciate it if you could send me an email approving the plats. If you have any questions, please call. Thanks, Greg Sullivan, P.L.S. Survey Supervisor .::�.;. Grafton Tull Office: 501-664-3245 i Direct: 501-748-8241 i Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craftontull.com s r'j�1 Disclaimer This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Thank you, we appreciate your cooperation. This Instrument Prepared by: Price C. Gardner FRIDAY, ELDREDGE & CLARK, LLP 400 West Capitol Avenue, Suite 2000 Little Rock, Arkansas 72201 RATIFICATION AND JOINDER OF LOTS 3 AND 4 TO DECLARATION OF RESTRICTIONS AND COVENANTS FOR CHENAL PARK CENTRE THIS RATIFICATION AND JOINDER OF LOTS 3 AND 4 TO DECLARATION OF RESTRICTIONS AND COVENANTS FOR CHENAL PARK CENTRE (this "Joinder") is made as of the day of October, 2018, by and between, CHENAL PARK CENTRE, LLC, an Arkansas limited liability company (hereinafter referred to as the "Grantor"), and LLEJ VII, LLC, an Arkansas limited liability company (hereinafter referred to as the "Lot 2 Owner"). RECITALS WHREAS, the Grantor was the owner of certain property containing approximately 6.208 acres located on Chenal Parkway, Little Rock, Pulaski County, Arkansas, which is more particularly described on Exhibit A attached hereto and made a part hereof (collectively referred to as the "Development Property") and still owns a portion of such Development Property; WHEREAS, the Grantor caused a portion of the Development Property to be surveyed by Crafton, Tull & Associates, Inc., and a Final Plat thereof dated November 22, 2017, identified by the title "Final Plat of Lot 2, Chenal Park Centre," to be prepared and filed of record as Instrument Number 20170882491, on December 28, 2017, in the records of the Circuit Clerk of Pulaski County, Arkansas (the "Lot 2 Plat"), and following the filing of the Lot 2 Plat, Grantor conveyed Lot 2 to the Lot 2 Owner; WHEREAS, in connection with the preparation and filing of the Lot 2 Plat, the Grantor caused to be prepared and filed that certain Declaration of Restrictions and Covenants For Chenal Park Centre (Lot 2 and Development Property) dated December 27, 2017, to be filed of record as Instrument Number 2017062490, on 6617320.1 December 28, 2017, in the records of the Circuit Clerk of Pulaski County, Arkansas (the "Declaration") covering Lot 2 and the Development Property; WHEREAS, the Grantor has now caused a portion of the Development Property the property to be to be surveyed by Crafton, Tull & Associates, Inc., thereof dated October , 2018 , identified by the title "Final Plat of Lot 3, Chenal Park Centre," as more particularly described on Exhibit B attached hereto ("Lot 3 "), and made a part hereof and bearing the signature and seal of Jason H. Grayham, Registered Professional Land Surveyor, and Bradley A. Peterson, as Registered Professional Engineer, to be prepared and filed of record as Instrument Number on October , 2018, in the records of the Circuit Clerk of Pulaski County, Arkansas (the "Lot 3 Plat"); WHEREAS, the Grantor has now caused a portion of the Development Property the property to be to be surveyed by Crafton, Tull & Associates, Inc., thereof dated October , identified by the title "Final Plat of Lot 4, Chenal Park Centre," as more particularly described on Exhibit C attached hereto ("Lot 4"), and made a part hereof and bearing the signature and seal of Jason H. Grayham, Registered Professional Land Surveyor, and Bradley A. Peterson, as Registered Professional Engineer, to be prepared and filed of record as Instrument Number on October , 2018, in the records ofthe Circuit Clerk of Pulaski County, ,I Arkansas (the "Lot 4 Plat"); WHEREAS, Grantor desires to file this ratification and joinder agreement ratifying and confirming that Lot 3 and Lot 4 are part of the Development Property described in the Declaration and are subject to the covenants and restrictions set forth therein, NOW, THEREFORE, in consideration of the foregoing, and the covenants and agreements set forth herein, the Owners agree as follows: Ratification and Joinder of Lots 3 and4. Grantor and Lot 2 Owner hereby acknowledge and agree that the obligations, rights and duties of the parties under the Declaration are incorporated herein by reference and the Grantor, as the owner of Lots 3 and 4, respectively, hereby ratifies, confirms and joins the Declaration of Restrictions and Covenants For Chenal Park Centre and agrees that Lots 3 and 4 shall be bound by and subject to the terms and conditions thereof. 2 6617320.1 (m) Any funeral home, creamatorium or similar business." 2. Ratification and Joinder of Lots 3 and 4. Grantor and Lot 2 Owner hereby acknowledge and agree that the obligations, rights and duties of the parties under the Declaration are incorporated herein by reference and the Grantor, as the owner of Lots 3 and 4, respectively, hereby ratifies, confirms and joins the Declaration of Restrictions and Covenants For Chenal Park Centre and agrees that Lots 3 and 4 shall be bound by and subject to the terms and conditions thereof. 3. Effect of Joinder. Except as expressly modified or amended as set forth herein the terms and conditions of the Declaration are incorporated herein by reference and made a part hereof. Capitalized terms not otherwise defined herein shall have the definition and meaning ascribed thereto in the Declaration. IN WITNESS WHEREOF, this First Amendment, Ratification and Joinder to the Declaration has been executed as of the date first above written. GRANTOR: CHENAL PARK CENTRE, LLC: By: GL--, Leonard Boen, Manager LOT 2 OWNER: LLEJ VIII, LLC By: Leonard Boen, Manager 3 6407087.0 ACKNOWLEDGMENT STATE OF ARKANSAS ) ) ss. COUNTY OF PULASKI } On this day, before me, a Notary Public, duly commissioned, qualified and acting, within and for said County and State, appeared in person the within named Leonard Boen, to me personally well known, who stated that he was the Manager of CHENAL PARK CENTRE, LLC, an Arkansas limited liability company, and that he was duly authorized in his capacity to execute the foregoing instrument for and in the name and behalf of said limited liability company, and further stated and acknowledged that he had so signed, executed and delivered said foregoing instrument for the consideration, uses and purposes therein mentioned and set forth. IN TESTIMONY WHEREOF, I have hereunto set my hand and official seal this day of em/. &z- , 2018. Notary Public My Commission Expires: -nrt)Commissions 2389626 EXPME$: October 1.2022 ACKNOWLEDGMENT STATE OF ARKANSAS ) ) ss. COUNTY OF PULASKI ) On this day, before me, a Notary Public, duly commissioned, qualified and acting, within and for said County and State, appeared in person the within named Leonard Bocn, to me personally well known, who stated that he was the Manager of LLEJ VIII, LLC, an Arkansas limited liability company, and that he was duly authorized in his capacity to execute the foregoing instrument for and in the name and behalf of said limited liability company, and further stated and acknowledged that he had so signed, executed and delivered said foregoing instrument for the consideration, uses and purposes therein mentioned and set forth. IN TESTIMONY WHEREOF, I have hereu my hand and official seal this _ day of 6VG70047-, 2018. Notary Public My Commission Expires: /a-/-zOz7, 4 6617320.1 r e PENCE C. GAIMPNER Commission g t2389G26 ..max EXPIRES' October 1, 2022 {a.. Pulaski Count 's EXHIBIT A -I DEVELOPMENT PROPERTY SUBJECT PROPERTY DESCRIPTION: (AS PER SURVEY) PART OF THE NW1/4 OF SECTION 6, TOWNSHIP 1 NORTH, RANGE 13 WEST, IN THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS. BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS- STARTING AT THE SOUTHWEST CORNER OF LOT 5, CHENAL COMMERCIAL PARK, (RECORDED IN PLAT BOOK E, PAGE 4,25); THENCE SOUTH 82 DEGREES 03 MINUTES 16 SECONDS EAST ALONG THE SOUTHERLY LINE OF THE SAID LOT 5 A DISTANCE OF 88.85 FEET TO THE POINT OF BEGINNING; THENCE CONTINUING SOUTH 82 DEGREES 09 MINUTES 53 SECONDS EAST ALONG THE SAID SOUTHERLY LINE OF LOT 5 A DISTANCE OF 336.93 FEET; THENCE ALONG SAID SOUTHERLY UNE ON A CURVE TO THE RIGHT HAVING A RADIUS OF 376.72 FEET, AN ARC LENGTH OF 329.27 FEET AND A CHORD WHICH BEARS SOUTH 57 DEGREES 06 MINUTES 24 SECONDS EAST 318.89 FEET; THENCE ALONG SAID SOUTHERLY LINE SOUTH 31 DEGREES 54 MINUTES 40 SECONDS EAST 7.66 FEET; THENCE ALONG SAID SOUTHERLY LINE ON A CURVE TO THE LEFT HAVING A RADIUS OF 30.00 FEET, AN ARC LENGTH OF 46.58 FEET AND A CHORD WHICH BEARS SOUTH 76 DEGREES 28 MINUTES 42 SECONDS EAST 42.04 FEET TO A POINT ON THE NORTHERLY RIGHT OF WAY OF CHENAL PARKWAY, (100' RIGHT OF WAY); THENCE ALONG SAID NORTHERLY RIGHT OF WAY LINE THE FOLLOWING COURSES AND DISTANCES: (1) ALONG A CURVE TO THE LEFT HAVING A RADIUS OF 724.07 FEET, AN ARC LENGTH OF 15.78 FEET AND A CHORD WITH BEARS SOUTH 58 DEGREES 10 MINUTES 03 SECONDS WEST 18.78 FEET; (2) THENCE SOUTH 57 DEGREES 42 MINUTES 33 SECONDS WEST 263.B4 FEET; (3) THENCE ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 904.93 FEET, AN ARC LENGTH OF 621.24 FEET AND A CHORD WHICH BEARS SOUTH 77 DEGREES 20 MINUTES 52 SECONDS WEST 609.11 FEET; THENCE, LEAVING SAID NORTHERLY RIGHT OF WAY LINE, NORTH 19 DEGREES 46 MINUTES 21 SECONDS EAST 552.28 FEET TO THE POINT OF BEGINNING. TRACT CONTAINING 270,400 SQUARE FEET OR 5,208 ACRES MORE OR LESS, 5 6617320.1 EXHIBIT B Lot 3 Legal Description PART OF THE NW1/4 OF SECTION 6, TOWNSHIP 1 NORTH, RANGE 13 WEST, IN THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF LOT 2, CHENAL PARK CENTRE, (RECORDED AS DOCUMENT No. 2017082491); THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 724.85 FEET AND A CHORD BEARING AND DISTANCE OF N 77°53'35" E, 40.00 FEET TO THE POINT OF BEGINNING; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 724.85 FEET AND A CHORD BEARING AND DISTANCE OF N 68031'04" E, 196.60 FEET; THENCE S 29"1T13" E A DISTANCE OF 180.08 FEET TO A POINT ON THE NORTH RIGHT OF WAY LINE OF CHENAL PARKWAY; THENCE ALONG SAID RIGHT OF WAY, ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 904.93 FEET AND A CHORD BEARING AND DISTANCE OF S 67040'27" W 219.08 FEET; THENCE LEAVING SAID RIGHT OF WAY ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET AND A CHORD BEARING AND DISTANCE OF N 58043'00" W, 43.64 FEET; THENCE N 12002'51" W A DISTANCE OF 148.90 FEET TO THE POINT OF BEGINNING, CONTAINING 0.92 ACRES MORE OR LESS. 6 6617320.1 EXHIBIT C Lot 4 Legal Description PART OF THE NW1/4 OF SECTION 6, TOWNSHIP 1 NORTH, RANGE 13 WEST, IN THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF LOT 2, CHENAL PARK CENTRE, (RECORDED AS DOCUMENT No. 2017082491); THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 724.85 FEET AND A CHORD BEARING AND DISTANCE OF N 70005'56" E, 236.16 FEET TO THE POINT OF BEGINNING; THENCE ALONG A CURVE TO THE LEFT, HAVING A RADIUS OF 724.85 FEET AND A CHORD BEARING AND DISTANCE OF N 59°12'08" E, 38.48 FEET; THENCE N 57°42'33" E A DISTANCE OF 171.49 FEET; THENCE ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 326.72 FEET AND A CHORD BEARING AND DISTANCE OF S 44°11'15" E, 154.32 FEET; THENCE ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET AND A CHORD BEARING AND DISTANCE OF S 13035'27" W, 41.77 FEET TO A POINT ON THE NORTH RIGHT OF WAY LINE OF CHENAL PARKWAY; THENCE ALONG SAID RIGHT OF WAY,S 57042'33" W A DISTANCE OF 173.23 FEET; THENCE ALONG A CURVE TO THE RIGHT, HAVING A RADIUS OF 904.93 FEET AND A CHORD BEARING AND DISTANCE OF S 59012'04" W 48.02 FEET; THENCE LEAVING SAID RIGHT OF WAY N 29017'13" W A DISTANCE OF 180.08 FEET TO THE POINT OF BEGINNING, CONTAINING 0.98 ACRES MORE OR LESS. 7 6617320.1 Greg Sullivan From: Biggs, Shawn M <sbiggs@entergy.com> Sent: Wednesday, September 5, 2018 7:51 AM To: Greg Sullivan Subject: RE: Final Plat Review Greg, The plats look like what was previously discussed, so I have no complaints. As an FYI, Mr. Thompson has taken his retirement and is no longer with the company. Shawn Biggs P.E. Engineer II Entergy Arkansas, Inc 9 Entergy Court Little Rock, AR 72211 501-954-5160 s b iiggsnentergy . corns Customer Installation Standard litti)://www.entergy-arkansas.com/your business builder.a5 ox From: Greg Sullivan [mailto:Greg.Sullivan@craftontull.com] Sent: Tuesday, September 04, 2018 10:59 AM To: Theotis Thompson (tthompl@entergy.com) Cc: Biggs, Shawn M Subject: Final Plat Review EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way. DO NOT provide your user ID or password. Theodis, I wanted to check with you on the status was of the plats I sent you on 08.07.18 for your review. The plats are attached for reference. Please let me know if you have any questions. I believe that Shawn Biggs approved the last plat I sent for review. If he is the new point of contact, please let me know and I will update my list. Regards, Greg Sullivan, P.L.S. Survey Supervisor 0 Crofton Tull Direct: 501-748-8241 1 Mobile: 501-773-5879 1 Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craftontull.com rf TIP n Disclaimer This email and any files transmitted with It are confidential and Intended solely For the use of the Individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy th}s a -mall. Please notify the sender Immediately by e-mail If you have received this e-mail by mistake and delete this a -mall from your system. Thank you, we appreciate your cooperation. Gre2 Sullivan From: Jason Lowder <Jason,Lowder@carkw.com> Sent: Thursday, August 9, 2018 10:52 AM To: Greg Sullivan Subject: RE: Final Plat Review Central Arkansas Water approves with no comments. Jason Lowder, Engineering Technician jason.lowder@carkw.com 501-377-1245 Ar la"'Water Com! rlsla pltr,'I! From: Greg Sullivan[mailto:Greg.Sullivan@craftontull,com] Sent: Tuesday, August 07, 2018 3:04 PM To: Andrew Townsend(andrew.townsend@centerpointenergy.com); Jason Lowder; GURLEY, JOHN CURTIS; Theotis Thompson (tthompl@entergy.com); Vincent Hotho (steven.hotho@lrwu.com) Subject: Final Plat Review All: Please find attached two Final Plats for your review. Please contact me if you have any questions. Regards, Greg Sullivan, P.L.S. Survey Supervisor r� Crofton Tull Direct: 501-748-8241 1 Mobile: 501-773-5879 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craftontull.com Disclaimer This email and any files transmitted with It are con0dential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender Immediately by a -mall If you have received this e-mail by mistake and delete this a -mail from your system. Thank you, we appreciate your cooperation. Greg Sullivan From: GURLEY, JOHN CURTIS <JG0866@att.com> Sent: Tuesday, September 4, 2018 12:46 PM To: Greg Sullivan Subject: FW: Final Plat Review Attachments: FINAL PLAT LOT 3.pdf, FINAL PLAT LOT 4.pdf Greg, AT&T approves the final plats of Lots 3 and 4 as shown in the attached files. Sorry for the delay. John Gurley ATT MGR OSP Engineering Little Rock, AR 501-373-3303 From: Greg Sullivan[mailto:Greg.Sullivan@craftontull.com] Sent: Tuesday, September 04, 2018 11:03 AM To: GURLEY, JOHN CURTIS <JG0866@att.com> Subject: Final Plat Review John, I wanted to check with you on the status was of the plats I sent you on 08,07.18 for your review. The plats are attached for reference. Please let me know if you have any questions. Regards, Greg Sullivan, P.L.S. Survey Supervisor & If "' Crofton Tull Direct: 501-748-8241 1 Mobile: 501-773-5879 1 Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craftontull corn 1904�d� Disclaimer This emall and any files transmftted with it are confidential and Intended solely for the use of the Individual or entity to whom they are addressed. IF you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender Immedlateiy by e-mail If you have received this e-mail by mistake and delete this e-mail from your system. Thank you, we appreciate your cooperation. Greg Sullivan From: Townsend, Andrew W <andrew.townsend@centerpointenergy.com> Sent: Tuesday, September 4, 2018 1:02 PM To: Greg Sullivan Subject: FW: [External Email] Final Plat Review Greg, Centerpoint Energy has no objection to the proposed plats. Thanks, Andrew Townsend, PE ,CentelpoIRd. Engineer III I AR/OK Legion Yl•:. 501.377.4679 w. 1501.519.1836 c. CenterPointEnergy.com "V From: Greg Sullivan[mailto:Greg.Sullivan@craftontull.com] Sent: Tuesday, September 4, 2018 11:05 AM To: Townsend, Andrew W <andrew.townsend@centerpointenergy.com> Subject: RE: [External Email] Final Plat Review Thanks for the update. Greg Sullivan, P.L.S. Survey Supervisor Crofton Tull Direct: 501-748-8241 1 Mobile: 501-773-5879 1 Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.craftontull corn Disclaimer This email and any files transmitted with it are confidential and Intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender Immediately by e-mail if you have received this a -mall by mistake and delete this e-mail from your system. Thank you, we appreciate your cooperation. From: Townsend, Andrew W <andrew.townsend @center ointenergy,com> Sent: Tuesday, September 4, 2018 11:04 AM To: Greg Sullivan <Gre .Sullivan craftontull.com> Subject: RE: [External Email] Final Plat Review Greg, This has been reviewed internally, I am awaiting confirmation on our review. Once I receive confirmation I will pass it along to you. Thanks, Andrew Townsend, PE Centerftin>t Engineer III I AR/OK Region 501.377.4679 w. 1 501.519.1836 c. GeriterPointEnergy.com 0 0 0 From: Greg Sullivan [:-nailto:Gre .Sullivasi craftontull.com] Sent: Tuesday, September4, 2018 10:54 AM To: Townsend, Andrew W<andrew;townsend@cente_rpointenery.com> Subject: [External Email] Final Plat Review Andrew, I wanted to check with you on the status was of the plats I sent you on 08.07.18 for your review. The plats are attached for reference. Please let me know if you have any questions. Regards, Greg Sullivan, P.L.S, Survey Supervisor Crofton Tull Direct: 501-748-8241 1 Mobile: 501-773-5879 1 Fax: 501-664-6704 10825 Financial Centre Parkway, Ste 300 Little Rock, AR 72211-3554 www.ci,aftontull.com :rlr)co Disclaimer This email and any files transmitted wlth it are confldentlal and intended solely for the use of the individual or entlty to whom they are addressed. If you are not the named addressee you should not dlsseminate, distribute or copy thls e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Thank you, we appreciate your cooperation. ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources. ***** 44 l; LLV i �Ifilllllllllllil �'�€3 �w= Jill „ bye R � 1 y 3�tiQQ��e9dY p�� b19 y�3 h e ar gtl3a�i$�e�'ajn�ba �1�L a2i �_a�ipp S? zLg 3�f'RIY�=� 87L�=Y�ai kaym 031