HomeMy WebLinkAboutS-0965-B Staff AnalysisITEM NO.: 3.
NAME: Lot 2 Bussa Subdivision Replat
LOCATION: 8815 Baseline Road
Planning Staff Comments:
Provide notification of the property owners located within 200-feet of the
development including the certified abstract list, notice form with affidavit executed
and proof of mailing. The notice must be mailed no later than June 15, 2016. The
Office of Planning and Development must receive the proof of notice no later than
June 24, 2016. Notices were sent out on June 14, 2016.
Will there be adequate parking for the remaining building/business. The parking for
a restaurant requires the placement of one (1) parking space per 100 gross square
feet of floor area. It appears the building contains 10,500 square feet of floor area
and it appears there will be 64 parking spaces remaining upon construction of the
new building and associated parking. The future disposition of the existing building is
unknown at this time and it is currently not occupied.
3. The fast food restaurant indicates the building square footage of 3,200 square feet.
The parking provided on the site per the plan provided is 29 spaces. Typically
parking for a restaurant is to be provided at one space per 100 gross square feet of
floor area. The realignment of the new driveway allowed for additional parking
spaces bringing the new total to 33.
4.
Variance/Waivers: None requested.
Public Works Conditions:
Baseline Road is classified on the Master Street Plan as a principal arterial with
special design standards. Dedication of right-of-way to 45 feet from centerline will be
required. Will comply.
Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI. A driveway permit has been applied for.
Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy. Will comply.
If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
Will comply.
5. Show existing curb cuts on the north side of Baseline Road on the site plan to show
any left turn conflicts. See revised site plan which shows the curb cuts on the north
side of Baseline and the realigned new driveway which eliminates conflicting turning
movements.
Show drive aisles and islands on the south side of the access easement to
determine vehicle maneuver ability. See revised site plan for existing islands on the
south side of the access easement.
7. Sidewalks with appropriate handicap ramps are required adjacent to the proposed
shared access easement in accordance with Section 31-175 of the Little Rock Code
of Ordinances and the Master Street Plan. See revised site plan.
Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. On Baseline Road, an arterial street,
driveways and streets should be spaced at least 300 feet from other driveways and
streets. A variance must be requested for the proposed driveway location being less
than 300 feet from existing driveways and streets. LR Public Works is supportive of
the driveway placement since it now aligns with the "In" driveway at McDonald's
across the street.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements if new sewer service is
required for this project. EAD, Environmental Assessment Division, approval required for
food service. Contact Little Rock Wastewater Utility for additional information. Noted.
Entergy: Entergy does not object to this proposal. A three phase power line runs east
and west on the south side of Baseline Road in front of this property. There do not
appear to be any existing conflicts with Entergy facilities on this property. Contact
Entergy in advance to discuss future service requirements, new facilities locations and
adjustments to existing facilities (if any) as this project proceeds. Please note that
caution should be used in the construction of the new drive to the new lot as overhead
power lines are in the area. Noted.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met. Will comply.
2. A utility easement will be required for the existing private fire service for 8815
Baseline Road. Will comply
The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense. Noted.
Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required. Will
comply.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system. Noted.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expanse of the developer.
7. Contact Central Arkansas Water regarding the size and location of water meter
comply.
8. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project. Noted.
9. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
10. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required.
Fire Department: New construction full plan review. Contact the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue
501.918.3754). Will comply
Parks and Recreation: No comment received.
County Planning: No comment received.
Rock Region Metro: Location is currently served by several METRO Routes 17, 22 and
23. It is considered an important transit hub. Sidewalks are critical to this location for
access to the transit route for customers and employees alike. Provide pedestrian
access to the front of the store from both Baseline Road and the rear drive. Complete
pedestrian access along property perimeter. See revised site plan for added sidewalks.
Building Code: No comment.
Planning Division: No comment.
Landscape:
Any new site development must comply with the City's landscape and buffer
ordinance requirements. Will comply.
The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger. Noted.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, June 15, 2016.
June 30, 2016
ITEM NO.: 3
NAME: Lot 2 Bussa Subdivision Replat
LOCATION: 8815 Baseline Road
DEVELOPER:
Shelay, Inc.
10105 1-30
Little Rock, AR 72209
ENGINEER,
Crafton Tull and Associates
10825 Financial center Parkway
Little Rock, AR 72211
AREA: 2.26 acres NUMBER OF LOTS: 2
WARD: 7 PLANNING DISTRICT: 15 — Geyer Springs West
CURRENT ZONING:
C-3, General Commercial District
LE NO.: S-965-B
NEW STREET: 0 LF
CENSUS TRACT: 41.05
VARIANCE/WAIVERS: A variance from Sections 30-43 and 31-210 to allow the
drive on Baseline Road nearer the intersection than typically allowed.
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
The applicant is seeking a replat of Lot 2 Bussa Subdivision. The property is
zoned C-3, General Commercial District and is the location of the now closed
Ryan's Restaurant. The lot will take access from Baseline Road, an existing
driveway will be shared with Wal-mart, and a new driveway will be shared with
Lot 2. The site is currently paved and the new site plan will provide for an
increase in the permeability of the site. The applicant is requesting no additional
detention be provided.
The review before the Commission is to allow the replatting of this lot. All review
of the site development criteria will occur with the request for a building permit.
June 30, 2016
SUBDIVISION
ITEM NO.: 3 (Cont.)
B. EXISTING CONDITIONS:
FILE NO.: S-965-B
The site contains a restaurant building which has not been in operation for a
number of years. South of the site is Wal-mart and north of the site are a number
of commercial uses including restaurants, convenience store and a liquor store.
To the east of the site is a single-family neighborhood and to the west of the site
is the Mabelvale Shopping Center which contains restaurants, retail and a home
improvement store.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200 feet of the site along with the West
Baseline Neighborhood Association and Southwest Little Rock United for
Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial
with special design standards. Dedication of right-of-way to 45 feet from
centerline will be required.
2. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
4. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
5. Show existing curb cuts on the north side of Baseline Road on the site plan to
show any left turn conflicts.
6. Show drive aisles and islands on the south side of the access easement to
determine vehicle maneuver ability.
7. Sidewalks with appropriate handicap ramps are required adjacent to the
proposed shared access easement in accordance with Section 31-175 of the
Little Rock Code of Ordinances and the Master Street Plan.
8. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. On Baseline Road, an arterial
street, driveways and streets should be spaced at least 300 feet from other
2
June 30, 2016
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-965-B
driveways and streets. A variance must be requested for the proposed
driveway location being less than 300 feet from existing driveways
and streets.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if new sewer
service is required for this project. EAD, Environmental Assessment Division,
approval required for food service. Contact Little Rock Wastewater Utility for
additional information.
Entergy: Entergy does not object to this proposal. A three phase power line runs
east and west on the south side of Baseline Road in front of this property. There
do not appear to be any existing conflicts with Entergy facilities on this property.
Contact Entergy in advance to discuss future service requirements, new facilities
locations and adjustments to existing facilities (if any) as this project proceeds.
Please note that caution should be used in the construction of the new drive to
the new lot as overhead power lines are in the area.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. A utility easement will be required for the existing private fire service for
8815 Baseline Road.
3. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
4. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
3
June 30, 2016
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-965-B
6. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
7. Contact Central Arkansas Water regarding the size and location of water
meter.
8. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
9. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
materials and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
a Customer Owned Line Agreement is required.
10. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
are used, a reduced pressure zone back flow preventer shall be required.
Fire Department: New construction full plan review. Contact the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue
501.918.3754).
Parks and Recreation: No comment received.
County Planning: No comment received.
Rock Region Metro: Location is currently served by several METRO Routes 17,
22 and 23. It is considered an important transit hub. Sidewalks are critical to this
location for access to the transit route for customers and employees alike.
Provide pedestrian access to the front of the store from both Baseline Road and
the rear drive. Complete pedestrian access along property perimeter.
F. ISSUES/TECHNICAUDESIGN:
Building Code: No comment.
M
June 30, 2016
SUBDIVISION
NO.: 3 (Cont.) FILE NO.: S-965-B
Planninq Division: No comment.
Landscape:
1. Any new site development must comply with the City's landscape and buffer
ordinance requirements.
2. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. SUBDIVISION COMMITTEE COMMENT: (June 8, 2016)
Mr. Frank Riggins of Crafton Tull and Associates was present representing the
request. Staff presented an overview view of the item stating there were few
outstanding technical issues associated with the request. Staff questioned if the
remaining parking for the restaurant building would be adequate to serve a future
user. Staff stated the restaurant contained 10,500 square feet of floor area and
would typically require the placement of 105 parking spaces to serve a restaurant
user. Staff stated it appeared there would be 64 parking spaces remaining on
the site upon approval of the replat.
Public Works comments were addressed. Staff stated Baseline Road was
indicated on the Master Street Plan as a principal arterial with special design
standards. Staff stated a dedication of right of way to 45-feet from centerline was
required. Staff stated the driveway width and locations did not meet the traffic
access and circulation requirements of Sections 30-43 and 31-210 along
Baseline Road. Staff stated on arterial streets the drives should be spaced at
least 300 feet from other driveways and streets.
Staff noted any new development would require compliance with the City's
Landscape and Buffer Ordinance requirements. Staff stated since the request
was for plat approval compliance of all other aspects of the various ordinances
would be reviewed at the time of building permit request.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion.
The Committee then forwarded the item to the full Commission for final action.
61
June 30, 2016
SUBDIVISION
M NO.: 3 (Cont.) FILE NO.: S-965-B
H. ANALYSIS:
The applicant submitted a revised plat to staff addressing the technical issues
raised at the June 8, 2016, Subdivision Committee meeting. The applicant states
any future user of the former restaurant building will match the parking available
on the lot.
The request is to replat Lot 2 Bussa Subdivision to allow the creation of
two (2) lots for future development of a restaurant while maintaining the existing
building on a separate lot. The property is zoned C-3, General Commercial
District and is the location of the now closed Ryan's Restaurant. The lots will
take access from a newly created drive on Baseline Road to the north. An
existing driveway along the southern perimeter along with a new drive will be
shared with an access drive within the Wal-mart parking lot. The entirely of the
site is currently paved. With the redevelopment of the site an increase in the
permeability of the site will be provided.
The C-3, General Commercial Zoning District requires a front yard building
setback of twenty-five (25) feet, no side yard setback is required except where
abutting a residential district; then there is to be a side yard setback width of not
less than fifteen (15) feet and a rear yard setback of twenty-five (25) feet. The
minimum lot area for the zoning district is fourteen thousand (14,000) square feet
and a minimum lot width of not less than one hundred (100) feet. The lots as
proposed fully comply with the typical development criteria of the zoning district.
The driveway along Baseline Road does not meet the typical spacing
requirement of Sections 30-43 and 31-210. Drives on arterial streets should be
spaced at least 300 feet from other driveways and street intersections. The drive
as proposed is indicated just over 200-feet from the eastern entrance drive to the
Wal-mart parking lot. The drive has been located to minimize turning conflicts
with the drives located on the north side of Baseline Road.
Staff is supportive of the applicant's request. The applicant is seeking a replat of
an existing platted lot to allow for a restaurant user on the newly created lot. The
applicant has stated potential users of the existing building will match the parking
available on the site. The approval of the plat does not approve the vehicular
movements around the building. The plat as proposed fully complies with the
development criteria of the underlying zoning district. The applicant is seeking a
variance to allow a reduction in the driveway spacing along Baseline Road and in
staff's opinion the variance will not significantly impact this development or
nearby properties.
C
June 30, 2016
SUBDIVISION
ITEM NO- 3 (Cont.
STAFF RECOMMENDATION:
FILE NO.: S-965-B
Staff recommends approval of the requested replat subject to compliance with
the comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the driveway spacing variance request from
Sections 30-43 and 31-210 to allow the driveway on Baseline Road as proposed.
PLANNING COMMISSION ACTION: (JUNE 30, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the requested replat subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the driveway
spacing variance request from Sections 30-43 and 31-210 to allow the driveway on
Baseline Road as proposed. There was no further discussion. The item was placed on
the consent agenda and approved as recommended by staff by a vote of 8 ayes, 0 noes
and 3 absent.
7