HomeMy WebLinkAboutS-0957-C Map 4N.
r THIS
1 *"7
I
v ,
VICINITY MAP
SCALE 1"=3000'
GENERAL NOTES
1. *-BASIS OF BEARINGS IS THE NORTH LINE OF SEC. 21 AS SHOWN
ON THE PLAT OF THE LITTLE ROCK PORT INDUSTRIAL PARK,
PREPARED BY CARVER & CARVER, INC. DATED JULY, 1971.
2. NO ENCROACHMENTS ONTO OR OFF OF THE PROPERTY EXISTED AT
THE TIME OF THIS SURVEY, EXCEPT AS SHOWN HEREON.
3. COORDINATES SHOWN ARE BASED ON THE ARKANSAS STATE PLANE
COORDINATE SYSTEM, NORTH ZONE, NAD 83, AS DETERMINED FROM
PAGIS MONUMENT 1001.
4. THE FLOOD INSURANCE RATE MAP PREPARED BY THE FEDERAL EMERGENCY
MANAGEMENT AGENCY, COMMUNITY PANEL NUMBER 050181 0014 E
AND DATED NOVEMBER 3, 1993, SHOWS THAT NO PART OF THIS SITE
LIES BELOW THE 500 YEAR FLOOD, AND THAT THE SITE HAS A
ZONE X CLASSIFICATION.
5. UNLESS SPECIFICALLY STATED OR SHOWN, SURVEY DOES NOT LOCATE OR
DELINEATE BUILDING SETBACK LINES, ZONING REGULATIONS, RESTRICTIONS,
OR OTHER ITEMS WHICH MAY AFFECT DEVELOPMENT, THOUGH THEY MAY
EXIST. NO STATEMENT IS MADE CONCERNING SUBSURFACE CONDITIONS, OR
THE EXISTENCE OF UNDERGROUND CONTAINERS OR FACILITIES WHICH MAY
AFFECT THE USE OR DEVELOPMENT OF THE TRACT.
SCALE: 1" = 100'
100 50 0 100 200 300
LEGEND
SET 1/2" REBAR
PROPERTY LINE
- -
BUILDING SETBACK LINE
EASEMENT LINE —
— — —
LAND LINE
- -
MEASURED BEARING
(M)
& DISTANCE
PLATTED OR RECORD
(P)
BEARING & DISTANCE
FOUND RAILROAD SPIKE
NORTHWEST CORNER, NE 1/4 NE 1/4
FRAZIER PIKE
(120' R/W, SEE PLAT BOOK 27. PAGE 86)
FOUND RAILROAD SPIKE
* S88'47'31"E 1312.33'(M)
--1312.43'(P)- - —�— - - 388.40'
FOUND 1/2" REBAR
I_
I � I
I of
ai
I I N I
I 1
I � I
MI 1
of
I N
41FOUND
'423.4'- - - S88_47'31"E 900.40'(M)
S888'25"E900.46T(M 1/2" REBAR FOUND 1/2" REBAR
I
II Ir-, o �a
. -. 00
O 1 0
" a l o (n M O I
aJ u') N
"v as wro 1
� v v
� w � W r
I K, I
_o
WIW I•- M NI M
Iz z ^ o TRACT C. AREA 103 0l o I
M 'I PLAT BOOK A, PAGE 284 V
ol�
I zZ I
I I I I
I I
I FOUND 1/2" REBAR
N 135269.56
E 1255330._10 SET 1/2" REBAR
S88'4516'E (PAGIS) N 135249.98 I
23.5' - - - - _ - _S88'47'31"E - - E 1256230.31
900.33 (M) 900.46 P) - - - --
I I 30' � I
I SETBACK 1
75'
I 1 SETBACK 30' I
co 1 1 SETBACK I I 3
wa W s TRACT F, AREA 103 0
U
Y o ^ -u-) n 9.929 ACRES (432,526 S.F.) al 3 0
103 af
N O : � •- Ol
0
p m a l oz "' -- — — — — — — —
f (n o — — — — — — — — — ' �-) v O I
waal z L Li z C' w I
v a u a o w -- RECORDED IN BOOK 1213
O N I — — a s PAGES 59 THRU 62 I J
F-- --- W —
(14
��-I 41t----------I
FOUND 1/2" REBAR o Z Li POINT OF BEGINNING
SET 1/2" REBAR
in ON LAND LINE AND Q � N 134769.68
M 1.0' EAST OF R/W LINE o w N88'44'45"W (PAGIS)
N _ - E 1256_17.10
- - _ - N88'47'00"W 900.33' _ 60 00'
N 1347891.39 1315.26'(M) -
E 1255316,99 N88'47'55"W 1315.31'(P)
(1' WEST OF FOUND REBAR)
SOUTH BOUNDARY LINE LITTLE ROCK
PORT INDUSTRIAL PARK
S
OF COMMENCEMENT
1/2" REBAR
EAST CORNER OF SECTION 21
T-1-N, R-11-W
I
I
I
I
I
^I^
� a
v OJ
n n
ai 01
MIM
Cof3.v in
N ;V
IN
I
I
TRACT B, AREA 103
PLAT BOOK A, PAGE 196
FOUND 1/2" REBAR
SE CORNER NE 1/4 NE 1/4
N88'47'00"W 391.43'
TRACT F, AREA 103
LAND DESCRIPTION
A TRACT OF LAND SITUATED IN THE NE 1/4. NE 1/4 OF SECTION 21, TOWNSHIP
1 NORTH, RANGE 11 WEST, PULASKI COUNTY, ARKANSAS, BEING MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A FOUND 1/2" REBAR AT THE NORTHEAST CORNER OF SAID
SECTION 21; THENCE 501'24'40"W, 1319.76 FEET TO A FOUND 1/2" REBAR AT
THE SE CORNER OF THE NE 1/4, NE 1/4 OF SAID SECTION 21; THENCE
N88'47'00"W, ALONG THE SOUTH LINE OF SAID NE 1/4, NE 1/4 FOR A
DISTANCE OF 391.43 FEET TO THE POINT OF BEGINNING; THENCE CONTINUING
ALONG THE SOUTH LINE OF SAID NE 1/4. NE 1/4, N88'47'00"W, 900.33 FEET TO
THE EAST RIGHT-OF-WAY LINE OF FOURCHE DAM PIKE; THENCE NO1'32'17"E,
ALONG SAID EAST RIGHT-OF-WAY LINE, 480.35 FEET TO A FOUND 1/2" REBAR
AT THE SOUTHWEST CORNER OF TRACT C. AREA 103. LITTLE ROCK PORT
INDUSTRIAL PARK, AS RECORDED IN BOOK A. PAGE 284, CIRCUIT CLERK'S
OFFICE, PULASKI COUNTY, ARKANSAS; THENCE S88'47'31'E, ALONG THE SOUTH
LINE OF SAID TRACT C, 900.33 FEET TO THE SE CORNER OF SAID TRACT C;
THENCE S01'32'17"W, 480.49 FEET TO THE POINT OF BEGINNING; SAID TRACT OF
LAND CONTAINING 9.929 ACRES (432,526 S.F.), MORE OR LESS.
SATE Q
AGI ERED
"PROFESSIONAL
ENGINEER
ire! No.4686
'4M FARL
�SATE OF
16.
N0a�9799
t'IT •., ? H.
CERTIFICATE OF OWNER
WE, THE UNDERSIGNED, OWNERS OF THE REAL ESTATE SHOWN AND DESCRIBED HEREIN, DO
HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED AND SUBDIVIDED, AND DO HEREBY
LAY OFF, PLAT AND SUBDIVIDE SAID REAL ESTATE IN ACCORDANCE WITH THIS PLAT.
JIM 0LEY, MAYOR DATE OF EXECUTION
CITY`OF LITTLE ROCK, ARKANSAS
SOURCE OF TITLE: SEE FINAL PLAT, BOOK 27 PAGE 86
CERTIFICATE OF ENGINEERING ACCURACY
1, WILLIAM E. RUCK, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A
PLAN MADE BY ME, AND THAT THE ENGINEERING REQUIREMENTS OF THE LITTLE ROCK
SUBDIVISION RULES AND REGULATIONS HAVE BEEN COMPLIED WITH.
DI/a. f12. IYVe. lam_ Z_AL
DATE KF EXECUTION REGISTERED PROFESSIONAL ENGINEER NO. 4686
CERTIFICATE OF SURVEYING ACCURACY
1, WALTER H. SPAUL, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A BOUNDARY
SURVEY MADE UNDER MY SUPERVISION, ALL MONUMENTS REQUIRED ACTUAL L EXIST AND ARE
CORRECTLY SHOWN HEREON AND THAT ALL SURVEYING REQUIREMENTS OF T LITTLE ROCK
SUBDIVISION RULES AND REGULATIONS HAVE BEEN CO PLIED WITH.
f-/?,-pL
DATE OF EXECUTION REGISTERED LAND St VEYOR 0. 979
WALTER H. SPAUL
RATIO OF CLOSURE: 1 : 21,300
CERTIFICATE OF FINAL APPROVAL
PURSUANT TO THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS, AND ALL OF THE
CONDITIONS OF APPROVAL HAVING BEEN COMPLETED, THIS DOCUMENT IS HEREBY ACCEPTED.
THIS CERTIFICATE IS HEREBY EXECUTED UNDER THE AUTHORITY OF SAID RULES AND REGULA
TI ONS.
i
DATE OF EXECUTION LITTLE ROCK PLANNING COMMISSION
CERTIFICATE OF RECORDIIib ' `'-s:,,; (-;
THIS DOCUMENT NUMBERFILED FOR RECORD IN PLAT BOOK
PAGE FOR BILL OF ASSURANCE SEE DOCUMENT NO.
CIRCUIT CLERK
DATES:21
TRACT F. AREA 103
LITTLE ROCK PORT INDUSTRIAL PARK
LITTLE ROCK, ARKANSAS
A REPLAT OF PART OF AREA 103
Garver+Garver
Engineers and Planners
Little Rock, Arkonsos
AUGUST, 1996