Loading...
HomeMy WebLinkAboutS-0957 Staff AnalysisSeptember 22, 1992 ITEM NO.: 2 FILE NO.: S-957 NAME: Little Rock Port Industrial Park - Subdivision Replat LOCATION: 8200 Frazier Pike DEVELOPER: ENGINEER• JOHN MANEELY COMPANY BLAYLOCK, THREET, PHILLIPS ASSOC. 8200 Frazier Pike 1501 Market Drive Little Rock, AR Little Rock, AR 72211 224-3922 AREA: 0 acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 PLANNING DISTRICT: Port 25 CENSUS TRACT: 40.01 VARIANCES REQUESTED: 1. Building setback requirements A. PROPOSALIREQUEST: This applicant proposes to replat the original three tracts of property into two tracts or lots. B. EXISTING CONDITIONS: This property is already a developed tract of land with existing structures in place and used by John Maneely Company. C. ENGINEERINGfUTILITY COMMENTS: There are no comments to report. D. ISSUES/LEGAL/TECHNICALIDESIGN: There are no significant issues attached to this replatting request, except for the variances from the building setback requirements. E. ANALYSIS• The Planning staff review of the site plan revealed problems. 11 September 22, 1992 ITEM NO.: 2 Cont. FILE NO.: S-957 F. STAFF RECOMMENDATIONS: Staff recommends approval including the variances from the building setback requirements. SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 3, 1992) Everett L. Martin represented the applicant. There was a brief discussion on the need for replatting. This item was forwarded to the full Commission for resolution. PLANNING COMMISSION ACTION: (SEPTEMBER 22, 1992) The applicant was in attendance. There were no objectors. After a brief discussion, the Commission determined to place this item on the Consent Agenda for approval. The motion passed by a vote of 9 ayes, 0 nays and 2 absent. 2