HomeMy WebLinkAboutS-0947 Staff Analysis1. Meetinq ❑ate: July 21, 1992
2. Case No.: S-947
3. Request: To approve variances from design standards of the
Subdivision Regulations for the Pennwyck Subdivision.
4. Location: SE corner of Montgomery Road at Taylor Loop Road
5. Owner/Applicant: J. A. Penney, Jr.
6. Existing Status: Timber covered property in acreage
ownership
7. Proposed Use: Redevelop the property as 22 single family
lots.
8. Staff Recommendation: Approval of the preliminary plat as
revised including the three variances requested.
9. Planning Commission Recommendation: Approval of the
preliminary plat as recommended by the staff.
10. Conditions or Issues Remaining to be Resolved: None
11. Right -of -Way Issues: None
12. Recommendation Forwarded With: A vote of 10 ayes, 0 nays
and 1 absent.
13. objectors: There were several persons in attendance
requesting information concerning drainage.
14. Neighborhood Plan: Chenal District 19
.. S-947
NAME: Pennwyck Subdivision - Preliminary Plat
LOCATION: SE Corner Montgomery Road at Taylor Loop Road
DEVELOPER•
J. A. PENNEY, JR./CO-OWNER
2311 Vollman
North Little Rock, AR 72118
758-8828
ENGINEER•
DUANE I. REEL
#3 Foxf ire Cove
Jacksonville, AR 72076
982-4332
AREA: 5.1 Ac. NUMBER OF LOTS: 22 FT. NEW STREET: 700 ft.±
ZONING: R-2 PROPOSED USES: Single Family
PLANNING DISTRICT: 19 NAME: Chenal
CENSUS TRACT: 42.06
VARIANCES REQUESTED:
1. Sidewalks on both boundary streets
2. Lot depth on Lots 8, 17, 18, 21 and 22 that less
than 100 feet
3. Lot 8 to have nonradial side lot lines.
4. Building lines on front and rear of Lots 18 and 21
to 20 feet
A. PROPOSAL/REQUEST:
This item proposes the creation of a number of single
family lots on an existing undeveloped site. Almost all of
the lots are oriented away from Taylor Loop Road which is
a collector. The developer proposes a staged development
with a plan to be submitted prior to the public hearing
on June 30.
B. EXISTING CONDITIONS:
The land involved in this plat is covered by natural growth,
trees and underbrush. The site as well as the adjoining
properties are generally flat grade. There are no
significant drainage problems in the area. Boundary streets
are constructed to county road standards with open ditch
section.
1
FILE NO.: S-947 (Continued) _! _
C. ENGINEERING COMMENTS:
Construct Master Street Plan improvements on Taylor Loop
Road to a collector standard and Montgomery Road to a
residential standard. Excavation and Detention Ordinances
will apply. Montgomery Road is a residential street,
although the plat apparently identifies an existing 60 feet
of right-of-way. The pavement section will be required at
27 feet.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
There are no apparent legal issues attendant to the filing
of this plat. However, there are a number of plat design
issues which should be addressed. These issues are:
1. Phasing Plan
2. Lots 17, 18, 21, 22 and 8 appear to be less than
minimum lot depth of 100 feet.
3. Robyn (street name) should be reviewed for possible
conflict with other plats and streets.
4. Lot 8 lot lines are not radial to the street
centerline. A variance should be requested if the
circumstance is to remain.
5. PAGIS Monument sites should be noted on the plat.
6. Source of sewer and water should be reflected.
7. Indication on the plat of the construction dimensions
and right-of-way dedication, which may be required for
boundary streets.
E. ANALYSIS•
Staff review of this preliminary plat is that it is entirely
appropriate to the site and circumstances. Our review of
the preliminary plat reflects that it is of a good design
and should work quite well with the adjacent development and
lots.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat as
submitted; however, we do not recommend approval of the
sidewalk waiver on the adjacent streets because this
subdivision is in an area that is developing and there are
full city street improvements on property nearby.
2
FILE NO.: S-947 Continued
SUBDIVISION COMMITTEE COMMENT: (JUNE 11, 1992)
The engineer was present representing Mr. Penny. Mr. Penny was
also in attendance. The staff offered the several items for
discussion. The owner, Mr. Penny, as well as his engineer
indicated they would take the appropriate steps to revise the
plat to deal with the several problem areas pointed out by staff,
and to add the several items needed to complete the plat filing.
The Committee briefly discussed with the engineer the sidewalk
variance which is the one requested exception from standards. It
was pointed out that this will require a City Board of Directors'
Ordinance to extend such a variance. The project engineer then
identified the location or source of sewer service for this
subdivision. He pointed out that a plat immediately north and
east along Taylor Loop provided a connection for a sewer line,
and that would be their point of contact.
He also provided information on a staff request concerning the
removal of a small hill or grade within the interior of the plat.
His comments were that the design of the plat requires lowering
this small hill mass to make the street grade and the lot work
better. After a brief and general discussion, the Committee then
forwarded the plat to the full Commission for a final resolution.
PLANNING COMMISSION ACTION: (JUNE 30, 1992)
Staff offered its recommendation of approval of this preliminary
plat subject to the several minor plat modifications pointed out
in our analysis. Staff also reported that the applicant has
added two variances to the request, one dealing with lot depth on
five of the lots and the third variance dealing with nonradial
side lot lines. Staff reported there was no problem with these
variances because they are minor and the minimum lot sizes are
protected.
Mr. Jim Butler was present and represented the applicant,
Mr. Penny was also in attendance. Mr. Butler offered some brief
comments on the plat. The Chairman then asked if there were
persons in attendance objecting to the proposal. There were
several objectors and there spokesperson was Mr. Larry Landis.
Mr. Landis offered concerns about drainage from this property
affecting properties across the street. Richard Wood of staff
reported to the Commission that this plat carries a
responsibility of conformance with the Detention Ordinance,
therefore, no increase in runoff will be permitted in excess of
that now naturally generated on the site. The engineer on this
project will be required to design detention facilities into the
drainage and street plans submitted to Public Works.
3
FILE NO.: S-947 (Conti
This information appeared to satisfy Mr. Landis and his neighbors
as to their concerns. A brief discussion followed in which the
subject of sidewalks was raised. Several commissions offered
objection to a variance for sidewalks in this area. Staff
pointed out that this is an urbanizing area around Taylor Loop.
There have been several additional plats developed with full
standards nearby. Mr. Penny, the applicant, was asked by the
Chairman if he desired to pursue this sidewalk variance to the
City Board, and Mr. Penny indicated that he did not.
After a brief discussion, the motion was made to approve the
preliminary plat as modified and recommended approval of the
three variances requested for lot depth, radial side lines, and
building lines. The motion passed by a vote of 10 ayes, 0 nays
and 1 absent.
4
June 30, 1992
ITEM NO.: 2 FILE NO.: 5-947
NAME: Pennwyck Subdivision - Preliminary Plat
LOCATION: SE Corner Montgomery Road at Taylor Loop Road
DEVELOPER•
ENGINEER•
J. A. PENNEY, JR./CO-OWNER DUANE I. REEL
2311 Vollman #3 Foxfire Cove
North Little Rock, AR 72118 Jacksonville, AR 72076
758-8828 982-4332
AREA: 5.1 Ac. NUMBER OF LOTS: 22 FT. NEW STREET: 700 ft.±
ZONING: R-2 PROPOSED USES: Single Family
PLANNING DISTRICT: 19 NAME: Chenal
CENSUS TRACT: 42.06
VARIANCES REQUESTED:
1. Sidewalks on both boundary streets
2. Lot depth on Lots 8, 17, 18, 21 and 22 that less
than 100 feet
3. Lot 8 to have nonradial side lot lines.
4. Building lines on front and rear of Lots 18 and 21
to 20 feet
A. PROPOSAL RE UEST:
This item proposes the creation of a number of single
family lots on an existing undeveloped site. Almost all of
the lots are oriented away from Taylor Loop Road which is
a collector. The developer proposes a staged development
with a plan to be submitted prior to the public hearing
on June 30.
B. EXISTING CONDITIONS:
The land involved in this plat is covered by natural growth,
trees and underbrush. The site as well as the adjoining
properties are generally flat grade. There are no
significant drainage problems in the area. Boundary streets
are constructed to county road standards with open ditch
section.
1
June 30, 1992
SUBDIVISION
ITEM NO.: 2 Continued FILE NO.: S-947
C. ENGINEERING COMMENTS:
Construct Master Street Plan improvements on Taylor Loop
Road to a collector standard and Montgomery Road to a
residential standard. Excavation and Detention Ordinances
will apply. Montgomery Road is a residential street,
although the plat apparently identifies an existing 60 feet
of right-of-way. The pavement section will be required at
27 feet.
D. ISSUESjLEGAL/TECHNICAL/DESIGN:
There are no apparent legal issues attendant to the filing
of this plat. However, there are a number of plat design
issues which should be addressed. These issues are:
1. Phasing Plan
2. Lots 17, 18, 21, 22 and 8 appear to be less than
minimum lot depth of 100 feet.
3. Robyn (street name) should be reviewed for possible
conflict with other plats and streets.
4. Lot 8 lot lines are not radial to the street
centerline. A variance should be requested if the
circumstance is to remain.
5. PAGIS Monument sites should be noted on the plat.
6. Source of sewer and water should be reflected.
7. Indication on the plat of the construction dimensions
and right-of-way dedication, which may be required for
boundary streets.
E. ANALYSIS•
Staff review of this preliminary plat is that it is entirely
appropriate to the site and circumstances. Our review of
the preliminary plat reflects that it is of a good design
and should work quite well with the adjacent development and
lots.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat as
submitted; however, we do not recommend approval of the
sidewalk waiver on the adjacent streets because this
subdivision is in an area that is developing and there are
full city street improvements on property nearby.
2
June 30, 1992
SUBDIVISION
ITEM NO.: 2 Continued FILE NO.: S-947
SUBDIVISION COMMITTEE COMMENT: (JUNE 11, 1992)
The engineer was present representing Mr. Penny. Mr. Penny was
also in attendance. The staff offered the several items for
discussion. The owner, Mr. Penny, as well as his engineer
indicated they would take the appropriate steps to revise the
plat to deal with the several problem areas pointed out by staff,
and to add the several items needed to complete the plat filing.
The Committee briefly discussed with the engineer the sidewalk
variance which is the one requested exception from standards. It
was pointed out that this will require a City Board of Directors'
Ordinance to extend such a variance. The project engineer then
identified the location or source of sewer service for this
subdivision. He pointed out that a plat immediately north and
east along Taylor Loop provided a connection for a sewer line,
and that would be their point of contact.
He also provided information on a staff request concerning the
removal of a small hill or grade within the interior of the plat.
His comments were that the design of the plat requires lowering
this small hill mass to make the street grade and the lot work
better. After a brief and general discussion, the Committee then
forwarded the plat to the full Commission for a final resolution.
PLANNING COMMISSION ACTION: (JUNE 30, 1992)
Staff offered its recommendation of approval of this preliminary
plat subject to the several minor plat modifications pointed out
in our analysis. Staff also reported that the applicant has
added two variances to the request, one dealing with lot depth on
five of the lots and the third variance dealing with nonradial
side lot lines. Staff reported there was no problem with these
variances because they are minor and the minimum lot sizes are
protected.
Mr. Jim Butler was present and represented the applicant,
Mr. Penny was also in attendance. Mr. Butler offered some brief
comments on the plat. The Chairman then asked if there were
persons in attendance objecting to the proposal. There were
several objectors and there spokesperson was Mr. Larry Landis.
Mr. Landis offered concerns about drainage from this property
affecting properties across the street. Richard Wood of staff
reported to the Commission that this plat carries a
responsibility of conformance with the Detention Ordinance,
therefore, no increase in runoff will be permitted in excess of
that now naturally generated on the site. The engineer on this
project will be required to design detention facilities into the
drainage and street plans submitted to Public Works.
3
June 30, 1992
SUBDIVISION
ITEM NO.: 2 Continued FILE NO.: 5-947
This information appeared to satisfy Mr. Landis and his neighbors
as to their concerns. A brief discussion followed in which the
subject of sidewalks was raised. Several commissions offered
objection to a variance for sidewalks in this area. Staff
pointed out that this is an urbanizing area around Taylor Loop.
There have been several additional plats developed with full
standards nearby. Mr. Penny, the applicant, was asked by the
Chairman if he desired to pursue this sidewalk variance to the
City Board, and Mr. Penny indicated that he did not.
After a brief discussion, the motion was made to approve the
preliminary plat as modified and recommended approval of the
three variances requested for lot depth, radial side lines, and
building lines. The motion passed by a vote of 10 ayes, 0 nays
and 1 absent.
4
January 4, 1994
ITEM NO.: 20 FILE NO.: S-947
NAME: PENNWYCK SUBDIVISION -- PRELIMINARY PLAT TIME EXTENSION
LOCATION: The south-east corner of Montgomery Road and Taylor
Loop Road
DEVELOPER:
ENGINEER•
J. A. PENNEY, JR. DUANE I. REEL
2311 Vollman #3 Foxfire Cove
North Little Rock, AR 72118 Jacksonville, AR 72076
753-8339 982-4332
AREA: 5.1 ACRES NUMBER OF LOTS: 22 FT. NEW STREET: 700
ZONING: R-2 PROPOSED USES: Single-family residential
PLANNING DISTRICT: 19
CENSUS TRACT: 42.06
VARIANCES GRANTED:
1) Reduction in the minimum lot depth for lots 8, 17, 18,
21, and 22.
2) Reduction of the front and rear setback lines to 20 feet
on lots 18 and 21.
3) Reduction from the radial lot line provision for Lot 8.
STATEMENT OF PROPOSAL:
A one year time extension is proposed by the applicant for the
preliminary plat approved by the Planning Commission on June 30,
1992.
A. PROPOSALIREOUEST:
The applicant requests approval by the Planning Commission
of a one year time extension for the preliminary plat for
Pennwyck Subdivision. The Planning Commission approved the
preliminary plat on June 30, 1992. The Board of Directors
approved the variances noted above on July 21, 1992. The
applicant indicates that some clearing work has been
accomplished, but that when Central Baptist Church
approached him with an offer to purchase a large portion of
the property, work was suspended. Central Baptist Church
sought Planning Commission approval of a Conditional Use for
its new facility, which was approved by the Commission, but
there has been an appeal of the Conditional Use permit to
January 4, 1994
SUBDIVISION
ITEM NO.: 20 (Continued) FILE NO.: S-947
the Board of Directors. This has forestalled progress on
either proceeding with a residential subdivision or selling
the land. The applicant indicates that he will continue
development of the subdivision if the Central Baptist Church
offer is voided.
B. EXISTING CONDITIONS:
The site is wooded, with some clearing having taken place.
The site is zoned R-2, with R-2 zoning on all adjacent
property.
C. ENGINEERINGZUTILITY COMMENTS:
No comments were received.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
There are no issues to be related.
E. ANALYSIS:
The Subdivision Ordinance requires a developer to proceed
with a preliminary plat towards being able to present a
final plat within one year of approval of the preliminary
plat. Progress toward this end has been delayed, but the
developer has proposed that there is a valid reason for the
delay. He proposes to continue working toward being able to
present the final plat if granted the time extension.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the time extension.
SUBDIVISION COMMITTEE COMMENT:
(DECEMBER 9, 1993)
No one was present to represent the applicant. Staff presented
the request. The Committee clarified that this was the first
extension request, then referred the item to the Commission for
the hearing.
PLANNING COMMISSION ACTION:
(JANUARY 4, 1994)
The item was included on the Consent Agenda for approval and was
approved with the vote of 7 ayes, no nays, 4 absent, and no
abstention.
2