HomeMy WebLinkAboutS-0943 Staff AnalysisMay 19, 19§2
ITEM NO.: 2 FILE NO.: S-943
NAME: Ryburn Addition Preliminary Plat
LOCATION: NE corner of I-430 at Colonel Glenn Road
DEVELOPER•
SIMMON FIRST NATIONAL BANK
501 Main Street
Pine Bluff, AR 71601
501-375-7736
AREA: 4.24 Ac. NUMBER OF LOTS:
ZONING: C-3 PROPOSED USES:
ENGINEER•
WHITE-DATERS AND ASSOCIATES
401 Victory Street
Little Rock, AR 72201
374-1666
4 FT. NEW STREET: 30
Commercial
PLANNING DISTRICT: 11 NAME: I-430
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
1. 50 foot Right -of -Way for commercial street
(60 feet required)
2. 27 foot pavement in lieu of 36 required
A. PROPOSAL RE UEST:
The proposal before the Commission is a four lot preliminary
plat for commercial development of this site. The property
is currently classified C-3 General Commercial. Specific
proposed uses of the several lots have not been offered.
There will be a single cul-de-sac constructed from Colonel
Glenn Road running north into the interior of the site. The
cul-de-sac takes access at the immediate east end of the
current median within Colonel Glenn Road.
B. EXISTING CONDITIONS:
The land area involved in this application has been somewhat
modified with the removal of trees and natural growth.
There is a grade on the property variable from the Colonel
Glenn right-of-way to the north at which point there is a
significant hill mass with a large water tank. To the east,
the large commercial site is occupied by the Sam Wholesale
Club and on the west lies Interstate 430.
1
May 19, 1992
SUBDIVISION
ITEM NO.: 2 Continued FILE NO.: 5-943
C. ENGINEERING COMMENTS:
The Master Street Plan requires additional right-of-way and
improvements for Colonel Glenn Road to arterial standard.
There is a requirement for 55 feet of pavement for Colonel
Glenn as measured from the centerline of the right-of-way.
A redesign of the intersection of the commercial street with
Colonel Glenn is required by the traffic engineer. The
redesign will provide for approximately 100 feet of 36 foot
pavement with an additional 100 feet of tapering to
accommodate the transition from 36 feet to a 27 foot
pavement within the cul-de-sac area. The street name should
be applied to the plat and detention and excavation
ordinances will apply.
D. ISSUES LEGAL TECHNICAL DESIGN:
None have been determined at this writing.
E. ANALYSIS•
The Planning staff's review of this proposal has revealed
very little in the way of affect upon the immediate
neighborhood. The site is appropriately placed both with
respect to land use and access for a commercial
redevelopment. The interior street for access of the
several lots will provide for a safer and better access.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat as
proposed with the exception of the variances. Staff
recommends that the variance for pavement and right-of-way
be approved only with respect to the area north of the
Traffic Engineer's comments. The street right-of-way
waiver, we also support in the same regard, that is,
requiring 60 foot right-of-way in the area immediate
adjacent to Colonel Glenn Road to support the 36 foot
pavement. The right-of-way to taper appropriately to match
the roadway.
2
May 19, 1992 `
ITEM NO.: 2 FILE NO.: S-943
NAME: Ryburn Addition Preliminary Plat
LOCATION: NE corner of I-430 at Colonel Glenn Road
DEVELOPER:
SIMMON FIRST NATIONAL BANK
501 Main Street
Pine Bluff, AR 71601
501-375-7736
AREA: 4.24 Ac. NUMBER OF LOTS:
ENGINEER•
WHITE-DATERS AND ASSOCIATES
401 Victory Street
Little Rock, AR 72201
374-1666
4 FT. NEW STREET: 30
ZONING: C-3 PROPOSED USES: Commercial
PLANNING DISTRICT: 11 NAME: I-430
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
1. 50 foot Right -of -Way for commercial street
(60 feet required)
2. 27 foot pavement in lieu of 36 required
A. PROPOSALLREQUEST:
The proposal before the Commission is a four lot preliminary
plat for commercial development of this site. The property
is currently classified C-3 General Commercial. Specific
proposed uses of the several lots have not been offered.
There will be a single cul-de-sac constructed from Colonel
Glenn Road running north into the interior of the site. The
cul-de-sac takes access at the immediate east end of the
current median within Colonel Glenn Road.
B. EXISTING CONDITIONS:
The land area involved in this application has been somewhat
modified with the removal of trees and natural growth.
There is a grade on the property variable from the Colonel
Glenn right-of-way to the north at which point there is a
significant hill mass with a large water tank. To the east,
the large commercial site is occupied by the Sam Wholesale
Club and on the west lies Interstate 430.
1
May 19, 1992
SUBDIVISION
ITEM NO.: 2 Continued FILE NO.: S-943
C. ENGINEERING COMMENTS:
The Master Street Plan requires additional right-of-way and
improvements for Colonel Glenn Road to arterial standard.
There is a requirement for 55 feet of pavement for Colonel
Glenn as measured from the centerline of the right-of-way.
A redesign of the intersection of the commercial street with
Colonel Glenn is required by the traffic engineer. The
redesign will provide for approximately 100 feet of 36 foot
pavement with an additional 100 feet of tapering to
accommodate the transition from 36 feet to a 27 foot
pavement within the cul-de-sac area. The street name should
be applied to the plat and detention and excavation
ordinances will apply.
D. ISSUES LEGAL TECHNICAL DESIGN:
None have been determined at this writing.
E. ANALYSIS•
The Planning staff's review of this proposal has revealed
very little in the way of affect upon the immediate
neighborhood. The site is appropriately placed both with
respect to land use and access for a commercial
redevelopment. The interior street for access of the
several lots will provide for a safer and better access.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat as
proposed with the exception of the variances. Staff
recommends that the variance for pavement and right-of-way
be approved only with respect to the area north of the
Traffic Engineer's comments. The street right-of-way
waiver, we also support in the same regard, that is,
requiring 60 foot right-of-way in the area immediate
adjacent to Colonel Glenn Road to support the 36 foot
pavement. The right-of-way to taper appropriately to match
the roadway.
SUBDIVISION COMMITTEE COMMENT: (APRIL 30, 1992)
The applicant was present. The Committee discussed the several
points identified in the staff recommendation. There was a brief
discussion concerning the appropriate pavement width and
right-of-way which will be required for Colonel Glenn Road. The
Engineering staff submitted their comments relative to a
recommended redesign of the cul-de-sac to incorporate a left turn
lane onto Colonel Glenn Road.
OA
May 19, 1992
SUBDIVISION
ITEM NO.: 2 (Continued) _ FILE NO.: S-943
All participants felt that the design proposal would work, and
the remaining portion of the cul-de-sac could function as a
conventional 27 foot street and a 50 foot right-of-way. The only
remaining issue to be resolved concerns the potential for the
water tank site, immediately on the north to be drained across
this property. Staff was informed after the Subdivision
Committee meeting by a member of the Water Works' engineering
staff that this tank may require draining, on occasions. The
current drainage route is across this property toward the
interchange on Colonel Glenn Road.
A meeting between this property owner and the Water Works staff
should be accomplished in order to resolve any conflict. The
plat was referred to the full Commission for final resolution.
PLANNING COMMISSION ACTION: (MAY 19, 1992)
Staff reported to the Commission that there were no continuing
issues on this preliminary plat request, with the exception of
the variances which were requested dealing with the cul-de-sac.
Staff reported that the Public Works Department and the project
engineer had agreed upon a design for the street intersection
which would accommodate reducing the northern portion of the
cul-de-sac to a residential street standard. This will require
approval by the Board of Directors by Ordinance. One remaining
item for discussion is a reminder to the engineer of record that
the Water Works request for a drain easement should be discussed
and resolved prior to the final plat. The purpose of this
easement would be to provide an outlet for water should a large
ground storage tank, immediately north require drainage.
After a brief discussion, a motion was made to place this item on
the Consent Agenda for approval subject to resolution of the
water works' issue. The motion includes a recommendation to the
Board of Directors for a waiver of a portion of the street
standards on the cul-de-sac. The motion passed by a vote of
10 ayes, 0 nays and 1 absent.
1. Meeting Date: June 16, 1992
2. Case No.: 5-943
3e Request: A variance from the commercial street standards
for a proposed cul-de-sac.
4. Location: NE corner of Interstate 430 at Colonel Glenn Road
5. Owner/Applicant: Simmons First National Bank
6. Existing Status: Vacant
7. Proposed Use: Four (4) commercial lots
8. Staff Recommendation: Approval of the plat and the
requested variance with conditions.
9. Planning Commission Recommendation: Approval of the plat
and the requested variance with conditions.
10. Conditions or Issues Remaining to be Resolved: None
il. Right -of -Way Issues: Additional right-of-way to be provided
along Colonel Glenn Road through the filing of the plat.
12. Recommendation Forwarded With: A vote of 10 ayes, 0 nays
and 1 absent.
13. Objectors: None
14. Neighborhood Plan: Interstate 430 District
FILE NO.:' S-943 Continued
All participants felt that the design proposal would work, and
the remaining portion of the cul-de-sac could function as a
conventional 27 foot street and a 50 foot right-of-way. The only
remaining issue to be resolved concerns the potential for the
water tank site, immediately on the north to be drained across
this property. Staff was informed after the Subdivision
Committee meeting by a member of the Water Works' engineering
staff that this tank may require draining, on occasions. The
current drainage route is across this property toward the
interchange on Colonel Glenn Road.
A meeting between this property owner and the Water Works staff
should be accomplished in order to resolve any conflict. The
plat was referred to the full Commission for final resolution.
PLANNING COMMISSION ACTION: (MAY 19, 1992)
Staff reported to the Commission that there were no continuing
issues on this preliminary plat request, with the exception of
the variances which were requested dealing with the cul-de-sac.
Staff reported that the Public Works Department and the project
engineer had agreed upon a design for the street intersection
which would accommodate reducing the northern portion of the
cul-de-sac to a residential street standard. This will require
approval by the Board of Directors by Ordinance. One remaining
item for discussion is a reminder to the engineer of record that
the Water Works request for a drain easement should be discussed
and resolved prior to the final plat. The purpose of this
easement would be to provide an outlet for water should a large
ground storage tank, immediately north require drainage.
After a brief discussion, a motion was made to place this item on
the Consent Agenda for approval subject to resolution of the
water works' issue. The motion includes a recommendation to the
Board of Directors for a waiver of a portion of the street
standards on the cul-de-sac. The motion passed by a vote of
10 ayes, 0 nays and 1 absent.
3
SUBDIVISION COMMITTEE/STAFF REPORT
DEFFERED MATTERS:
A. T. B. Devine
Returns after failure of notice
Issues remain same
a. Proper plat boundary
b. Street improvement to industrial standards
C. Plat submittal requirements including
floodway.
d. Written request with justification for
waivers
Note: This issue has received one deferral.
B. Anna's Case on Heritage Church
C. Johnson Short -form PCD
Returns after request for six weeks deferral
All issues remain:
a. Floodway, handicapped ramps
b. Bill of Assurance
C. Compatibility with adopted plan
d. Large neighborhood objection
D. Ton 's Zoning Case
1. Hugh Wells Preliminary Plat
Issues are:
a. Master Street Plan Right -of -Way on Raines
Road 45 feet from centerline.
b. Curb, gutter and sidewalk on both streets.
C. Drainage easement on Lot 1
d. A water main to serve Lots 2 and 3 will be
required.
Staff Recommendations: Approval subject to completing
the plat filing requirements:
(a) certificates
(b) tie to land corner
(c) PAGIS Monuments
Staff supports improvement waivers but right-of-way
must be dedicated.
2. Ryburn PreliminaryPlat
Issues are:
a. Master Street Plan Right -of -Way and
improvements for Colonel Glenn Road plus
sidewalk,55 feet from centerline.
b. Redesign intersection to meet traffic
division recommendations.
C. Name Street
d. Detention and excavation ordinance's apply.
e. Complete plat filing requirements.
f. Sewer main extension required with easements.
g. Water main extension required.
Staff Recommendations: Approval of the plat with
changes to accommodate items noted above. No to both
waivers.
Issues are:
a. Sidewalks will be required.
b. Water main required on each element of
Phase V with access easement platted as
public service, access and utility
easement at minimum 24 feet.
3. Windsor Court Patio Homes
Issues are:
a. Sidewalks will be required.
b. Water main required on each element of
Phase V with access easement platted as
public service, access and utility easement
at minimum 24 feet.
C. Complete plat filing requirements.
d. Section through site east -west with
structures.
Staff Recommendations: APPROVAL SUBJECT TO ABOVE
4. Sandpiper West Preliminary Block 7
Issues are:
a. Complete plat submittal requirements.
b. Verify right-of-way needed on Bowman Road and
the improvements will be required plus
sidewalk.
C. Provide record of creek right-of-way
ownership.
d. Sidewalk on one side of Creek Side Drive.
e. Name short cul-de-sac.
f. Some lots appear to be less than 60 feet at
building line.
g. 35 feet building line on Lots 1 and 36 plus
10 feet vehicle access prohibition zone.
h. Drainage at point of plat entry.
i. PAGIS Monuments
j. Redesign entry to conform to Traffic
Engineering recommendation.
k. Stormwater and excavation ordinance apply.
1. Sewer main extension required.
M. 12 inch water main extension required in
Bowman Road to be coordinated with later road
improvements.
n. Complete rezoning action prior to final plat.
o. Need phasing plan if not to be one phase.
Staff Recommendations: APPROVAL SUBJECT TO ABOVE BEING
RESOLVED. Staff supports the variance on the
cul-de-sac, the horizontal radius, 15 foot building
line and the in lieu for Bowman Road.
5. South Bend Acres Revised Preliminary Plat
Issues are:
a. Clarify who is engineer/surveyor.
b. Complete plat submittal requirements.
C. Sewer main extension is required with
easements.
d. The 12 inch water main across Lots 35 and 42
requires an easement 7.5 feet on each side of
the line. This may be cause for design
adjustment.
e. Explain offset in Alexander Road
Right -of -Way.
f. Explain dimension difference between this
preliminary plat and the previous plat along
the boundary of Lot 45.
g. Note about side yard maximum applies to lots
in Alexander city limits only.
h. Show dedication on Alexander Road at 45 feet
from centerline with 30 feet pavement,
sidewalks are required.
i. Excavation and detention ordinance apply.
j. Clarify city limits line.
k. Show access easement overlay the rear lot
drive on Lots 38-45.
Staff Recommendations: Approval subject to
above/waivers still good.
6. Savell's PCD (Short -form)
Issues are:
a. No access on Baseline from the site.
b. Dailey Drive to be collector standard.
Thirty-six feet of pavement in a 60 foot
right-of-way, with sidewalk.
C. Conformance with the landscape and buffer
standards. Screen dumpster site.
d. Increase width of handicapped space.
e. Screen mobile home park from parking.
Staff Recommendations: Approval subject to above.
7`. Park Lane PRD
Issues are:
a. Quantify plan on drawing.
b. Provide elevations of building's showing
texture and form.
C. Need specific landscape plan.
d. Identify all structural elements.
e. Show treatment of land outside landscape and
hard surface areas.
f. Provide additional 9 feet of right-of-way
plus curb, gutter and sidewalk on Park Lane.
g. Provide repair of curb and construct sidewalk
on East 15th Street.
Staff Recommendations: APPROVAL SUBJECT TO ITEMS
ABOVE.
NO.: S-943
NAME: Ryburn Addition Preliminary Plat
LOCATION: NE corner of I-430 at Colonel Glenn Road
DEVELOPER:
SIMMON FIRST NATIONAL BANK
501 Main Street
Pine Bluff, AR 71601
501-375-7736
AREA: 4.24 Ac. NUMBER OF LOTS:
ZONING: C-3 PROPOSED USES:
PLANNING DISTRICT: 11 NAME:
CENSUS TRACT: 24.04
VARIANCES REQUESTED:
ENGINEER•
WHITE-DATERS AND ASSOCIATES
401 Victory Street
Little Rock, AR 72201
374-1666
4 FT. NEW STREET: 30
Commercial
I-430
1. 50 foot Right -of -Way for commercial street
(60 feet required)
2. 27 foot pavement in lieu of 36 required
A. PROPOSAL RE UEST:
The proposal before the Commission is a four lot preliminary
plat for commercial development of this site. The property
is currently classified C-3 General Commercial. Specific
proposed uses of the several lots have not been offered.
There will be a single cul-de-sac constructed from Colonel
Glenn Road running north into the interior of the site. The
cul-de-sac takes access at the immediate east end of the
current median within Colonel Glenn -Road.
B. EXISTING CONDITIONS:
The land area involved in this application has been somewhat
modified with the removal of trees and natural growth.
There is a grade on the property variable from the Colonel
Glenn right-of-way to the north at which point there is a
significant hill mass with a large water tank. To the east,
the large commercial site is occupied by the Sam Wholesale
Club and on the west lies Interstate 430.
1
NO.: S-943 (Continued
C. ENGINEERING COMMENTS:
The Master Street Plan requires additional right-of-way and
improvements for Colonel Glenn Road to arterial standard.
There is a requirement for 55 feet of pavement for Colonel
Glenn as measured from the centerline of the right-of-way.
A redesign of the intersection of the commercial street with
Colonel Glenn is required by the traffic engineer. The
redesign will provide for approximately 100 feet of 36 foot
pavement with an additional 100 feet of tapering to
accommodate the transition from 36 feet to a 27 foot
pavement within the cul-de-sac area. The street name should
be applied to the plat and detention and excavation
ordinances will apply.
D. ISSUESILEGALITECHNICALIDESIGN:
None have been determined at this writing.
E. ANALYSIS•
The Planning staff's review of this proposal has revealed
very little in the way of affect upon the immediate
neighborhood. The site is appropriately placed both with
respect to land use and access for a commercial
redevelopment. The interior street for access of the
several lots will provide for a safer and better access.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat as
proposed with the exception of the variances. Staff
recommends that the variance for pavement and right-of-way
be approved only with respect to the area north of the
Traffic Engineer's comments. The street right-of-way
waiver, we also support in the same regard, that is,
requiring 60 foot right-of-way in the area immediate
adjacent to Colonel Glenn Road to support the 36 foot
pavement. The right-of-way to taper appropriately to match
the roadway.
SUBDIVISION COMMITTEE COMMENT: (APRIL 30, 1992)
The applicant was present. The Committee discussed the several
points identified in the staff recommendation. There was a brief
discussion concerning the appropriate pavement width and
right-of-way which will be required for Colonel Glenn Road. The
Engineering staff submitted their comments relative to a
recommended redesign of the cul-de-sac to incorporate a left turn
lane onto Colonel Glenn Road.
2