HomeMy WebLinkAboutPC Minutes for S-1888-E 080824August 8, 2024
ITEM NO.: 11 FILE NO.: S-1888-E
NAME: Fletcher Valley Park – Preliminary Plat
LOCATION: North of Kanis Road, West of Fletcher Valley Drive
DEVELOPER:
Potlatch Deltic Real Estate, LLC
7 Chenal Club Blvd.
Little Rock, AR 72223
OWNER/AUTHORIZED AGENT:
Deltic Real Estate, LLC – Owner
White-Daters and Associates – Agent
SURVEYOR/ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 3.30 acres NUMBER OF LOTS: 3 FT. NEW STREET: 600 LF
WARD: 5 PLANNING DISTRICT: 21 CENSUS TRACT: 42.02
CURRENT ZONING: R-2
VARIANCE/WAIVERS: None requested.
BACKGROUND:
On May 9, 2024 the Planning Commission approved a Conditional Use Permit to establish
a neighborhood park for the Fletcher Valley Subdivision. The site is located north of Kanis
Road and west of the existing Fletcher Valley Subdivision. Park amenities will include
swimming pools, basketball court and playground area.
A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT:
The applicant is requesting preliminary plat approval to dedicate approximately
600 linear feet of Fletcher Valley Drive to access the approved park site. The
preliminary plat also shows the area of the park to be in three (3) tracts.
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
2
B. EXISTING CONDITIONS:
The property is currently undeveloped, with varying degrees of slope.
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property abutting the site and all neighborhood associations
registered with the City of Little Rock were notified of the public hearing.
D. ENGINEERING COMMENTS:
1. Contact Planning and Development Dept., Engineering Division at
501-371-4817 or at 501-918-5348 for inspections of any work in the public
right-of-way prior to placement of concrete or asphalt or for on-site clarification
of requirements prior to commencing work. Failure to do so can result in
removal of any improperly placed concrete or asphalt at the expense of the
owner or contractor.
2. Any work involving one (1) or more acres of disturbed area requires a State of
Arkansas NPDES permit. Contact the Arkansas Department of Environmental
Quality, NPDES branch at 501-682-0744 for applications and information
about General Stormwater Discharge Construction Permit #ARR150000.
3. A grading permit must be obtained prior to initiation of work. Grading permits
are issued by the Planning and Development Dept. at 723 West Markham
Street after approval of sediment and erosion control plans, grading and
drainage plans, land survey, drainage study, and soil loss calculations per
City’s stormwater management and drainage manual. Contact Planning and
Development Dept., Engineering Division at 501-371-4817 or at 501-918-
5348 or Permits@littlerock.gov to schedule an appointment for issuance or to
answer any questions. Permit cost is based on total project area at $100.00
for the less than ½ acre, $200.00 for ½ to 1 acre, and $200.00 for the first acre
and $100.00 for each additional acre for project greater than 1 acre.
4. The Department requires three (3) phase sediment and erosion control (SEC)
plans to be submitted for all construction projects showing best management
practices (BMPs) for mitigating sediment runoff and erosion along with
vegetation specifications for temporary and permanent soil stabilization.
Phase 1 SEC plans shall show SEC BMPs during the stripping, clearing,
grubbing, and rough grading of the site. Phase 2 SEC plans shall show SEC
BMPs during construction of utilities, buildings, roadway infrastructure and
drainage infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final
grading, seeding, and landscaping of the site.
5. Sediment and Erosion Control plans shall also show the pertinent information
as outlined in ADEQ ARR150000 Permit Part II section A-4-H (1-14) and Part
II section A-4-I-2 (A-B).
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
3
6. Per City Rev. Code 29-99, stormwater detention for developments is required.
Provide stormwater detention infrastructure to satisfy this requirement.
7. Per City Code 31-89 (5) for a preliminary plat, a storm drainage preliminary
analysis is required showing drainage data for all watercourses entering and
leaving the plat boundaries. The storm drainage analysis shall be prepared
in sufficient detail to illustrate the proposed system’s capability of
accommodating storm events as required by the stormwater management and
drainage manual. The preliminary plat shall also show drainage arrows
indicating how drainage arrives at the site and drainage arrows how it leaves
the site post development. Indicate where the storm sewer pipes and curb
inlets are located within the development also. Additionally, provide profile and
cross- sectional views of the detention structure outlet/spillway and detention
calculations for the 25- and 100-year storm for the proposed detention
pond/structure. Delineation of the drainage areas pre and post construction
with respective discharges via rational method shall also be shown. The
preliminary plat shall also contain all information as outlined in City Code Sec.
31-89 and 31-90.
8. Per City Code 31-434, a 50% maintenance bond for all street and stormwater
infrastructure constructed within the public right of way shall be submitted to
Department engineering staff prior to recording the final plat. Before the 50%
maintenance bond can be accepted, a contract unit bid price for every street
and stormwater infrastructure construction item within the public right of way
shall be submitted to Department engineering staff for review and approval.
9. Per City Code 31-117, as built stormwater drainage infrastructure
information/data shall be submitted prior to recording of the final plat. This
information shall include but not limited to: pipe inverts, length of pipe, size
of pipe, type of pipe, and type of inlets.
10. Per City Rev. Code 31-403 the Department requires street lighting plans to be
submitted to the Department for review and approval before filing and
recording of the final plat for the subdivision. The street lighting plans required
shall include conduit and pull/junction box locations, street luminaire locations
and mounting heights, wire sizes, current photometric data for the proposed
fixtures, and subdivision street photometrics using the proposed fixtures that
meet AASHTO Roadway Lighting Design Guide standards.
11. Department engineering staff are required to perform a final inspection of all
street and stormwater infrastructure construction within the public right of way.
City maintenance of the street and stormwater drainage infrastructure within
the public right of way cannot officially begin until final acceptance by
Department engineering staff. This needs to be completed and accepted by
Department engineering staff prior to recording of the final plat.
12. A drainage study showing all hydrologic calculations for the site and all
hydraulic calculations for the proposed storm sewer pipe system, swales and
ditches, detention ponds, outlet structures, and inlets is required per City’s
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
4
stormwater management and drainage manual. For final drainage report,
sign, date, and seal the report per AR State Board of Professional Engineers
and Professional Surveyors rules Article 12, Section B (1) (a). Provide
engineer's certification statement saying this drainage report was conducted
by yourself or directly under your supervision and attesting to the accuracy of
the information within this report.
13. Street design standards shall comply with the latest version of the AASHTO
A Policy on Geometric Design of Highways and Streets, City’s Master Street
Plan (2018), and City’s Standard Details for street and drainage facilities
improvements (2015).
14. Street stormwater and detention infrastructure design standards shall comply
with the City’s Stormwater Management and Drainage Manual (2016)
including City Code Chapters 29, 30, and 31.
15. Street pavement, sidewalks, curb and gutter, curb inlets, junction boxes,
accessible ramps, and storm sewer infrastructure shall comply with City’s
specifications for construction as outlined in City Code Chapters 30.
16. Damage to public and private property due to hauling operations or operations
of construction related equipment from a construction site shall be repaired
by the responsible party prior to the issuance of a certificate of occupancy.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority: No sanitary sewer plans (or demand)
are shown. If necessary, please submit infrastructure plans for LRWRA review.
Entergy: No comments received.
Summit Utilities: No comments.
AT & T: No comments received.
Central Arkansas Water: A 72-inch raw water line crosses this site within a
50-foot wide waterline easement in the middle of this property. Care must be taken
to protect these water lines and any appurtenances, such as access and air
release vaults, or monumentation which may be in the area. No signs, light poles,
dumpster pads or other structures on foundations will be allowed within the existing
50-foot waterline easement. Paved parking and driveways are allowed. Field
verification of the pipeline depth and location will need to be made by Central
Arkansas Water. Construction of the proposed improvements must be performed
with materials and techniques that will not harm or damage the pipelines or
interfere with their operation. Due to the critical nature of the 72-inch raw water
line located near this grading please contact CAW at 501-594-5261, 24 hours prior
to any work within the water line Right-of-Way.
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
5
Fire Department:
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads
shall not exceed 10 percent in grade except as approved by the fire chief. If
the grade exceeds 10 percent, approval will be denied and the applicant must
submit request to be reviewed by Fire Chief for Approval.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply
with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
6
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval by the fire
code official.
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
One- or Two-Family Residential Developments.
As per Appendix D, Section D107.1 of the Arkansas Fire Prevention Code
Vol. 1, One- or Two-Family dwelling residential developments . Developments
of one- or two-family dwellings where the number of dwelling units exceeds 30
shall be provided with two separate and approved fire apparatus access roads,
and shall meet the requirements of Section D104.3.
Exceptions:
1. Where there are more than 30 dwelling units on a single public or
private fire apparatus access road and al dwelling units are equipped
throughout with an approved automatic sprinkler system in
accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the
Arkansas Fire Code, access from two directions shall not be required.
2. The number of dwelling units on a single fire apparatus access road shall
not be increased unless fire apparatus access roads will connect with
future development, as determined by the fire code official.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 – C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal’s Office
(Capt. Tony Rhodes 501-918-3757, or Fire Marshal Derek N. Ingram
501-918-3756 Number and Distribution of Fire Hydrants as per Table C105.1.
If you have any additional questions please contact our office. Contact
Capt. Tony Rhodes at (501) 918-3757, or Fire Marshal Derek N. Ingram
(501) 918-3756.
Parks and Recreation: No comments received.
County Planning: No comments received.
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
7
F. BUILDING CODES/LANDSCAPE:
Building Code: No comments received.
Landscape: No comments.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments received.
Planning Division: No comments.
H. ANALYSIS:
On May 9, 2024 the Planning Commission approved a Conditional Use Permit to
establish a neighborhood park for the Fletcher Valley Subdivision. The site is
located north of Kanis Road and west of the existing Fletcher Valley Subdivision.
Park amenities will include swimming pools, basketball court and playground area.
The applicant is requesting preliminary plat approval to dedicate approximately
600 linear feet of Fletcher Valley Drive to access the approved park site. The
preliminary plat also shows the area of the park to be in three (3) tracts, as follows:
Tract P1 – Swimming pools and bathroom/changing room facility.
Tract P2 – Raw water line easement and paved parking.
Tract P3 – Basketball court and playground area.
Tracts P1 – P3 will be approximately 3.30 acres in area. The property is currently
undeveloped and wooded.
To staff’s knowledge, there are no outstanding issues. The applicant is requesting
no variances with the proposed preliminary plat.
Staff is supportive of the proposed preliminary plat. Staff views the request as
reasonable. The plat is a follow-up to the previously approved conditional use
permit, primarily to provide public street access to the future park area.
I. STAFF RECOMMENDATION:
Staff recommends approval of the requested preliminary plat, subject to
compliance with the comments and conditions outlined in paragraphs D and E,
and the staff analysis, of the agenda staff report.
August 8, 2024
ITEM NO.: 11 (Cont.) FILE NO.: S-1888-E
8
PLANNING COMMISSION ACTION: (AUGUST 8, 2024)
The applicant was present. There were no persons registered in opposition. Staff
presented the item and a recommendation of approval as outlined in the “staff analysis”
above. The item remained on the Consent Agenda for Approval. The vote was 9 ayes,
0 nays, 1 Recused (Hart) and 1 absent. The application was approved.