HomeMy WebLinkAboutS-0934 Staff AnalysisDecember 3, 1991
FILE .: S-934
ITEM 'NO • : � NO
NAME: Parkway Office Resubdivision of West Highlands Addition
LOCATION: Hardin Road north of Financial Center Parkway
DEVELOPER: ENGINEER:
AMR REAL ESTATE DEVELOPMENT CONSULTANTS
DREW BASHAM 2024 Arkansas Valley Drive 0306
201 East Markham, Suite 150 Little Rock, AR 72212
Little Rock, AR* 72201 221-7880
375-0378
AREA: 7.942 Ac. NUMBER OF LOTS: 10
ZONING: 0-2 and 0-3 PROPOSED USES:
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
FT. NEW STREET: ± 235 ft.
Office
VARIANCES REOUESTED:
1.) Length of cul-de-sac
2.) Width of Street Right -of -Way, and Street
A. PROPOSAL/RE VEST:
This owner proposes the replatting of an existing tract of
land approximately eight acres into ten office lots. The lot
size ranges from 0.4 to 0.9 acres. The site is proposed to
be served by a single point of access, off Financial Center
Parkway to Hardin Road.
B. EXISTING CONDITIONS:
This site is currently undeveloped and covered with the
natural foliage of the area, mainly hardwoods. There are no
structures. The north, east and west boundaries of this
property are bordered by Birchwood residential subdivision.
C. ENGINEERING COMMENTS:
Excavation and detention ordinances do apply. Sidewalks are
required on both sides of the street. Provide a minimum
50 feet right-of-way on Hardin Road.
1
December 3, 1991
RESUBDIVISION
ITEM NO.: 2 Continued FILE NO.: S-934
D. ISSUES LEGAL TECHNICAL DESIGN:
The preliminary plat is basically in good form with
resolution of the following items required.
1. The zoning and subdivision ordinance calls for a minimum
lot area of 14,000 square feet; in addition, there
should be a lot width of not less than 100 feet;
measurements should be made at the front building line.
2. The applicant should present landscape and screening
plans for Lots 7, 8 and 9 abutting residential lots.
3. The applicant should contact Water Works for the water
main extension.
E. ANALYSIS•
The Planning staff finds no serious fault with this
preliminary plat subject to the resolving of the several
items pointed out in Item D above and approval of the
rezoning applications.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat subject to
the comments above.
SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 14, 1991)
Mr. Robert Brown was present representing the application.
Mr. Brown described the preliminary plat and various elements of
the proposal. He indicated that part of this plat is also subject
to rezoning from 0-2 to 0-3. He stated the reason for rezoning is
to allow smaller lot sizes.
Jim Lawson, Director of Planning, explained that 0-2 zoning
requires a site plan review. Rezoning to 0-3 would void that
requirement. He suggested that he would like to protect
residential neighborhoods directly west, north and east by
extending a screening buffer and requiring landscape treatment
for Lots 7, 8 and 9 in exchange for allowing 0-3 zoning.
Lot size and a minimum 100 foot frontage was also discussed. The
applicant agreed to revise the building lines in order to gain
minimum frontage required by ordinance.
The last items for discussion were a sign placement and the
phasing plan. The applicant agreed to comply with the sign
ordinance at the building permit time and ask for a phasing plan
as part of the preliminary plat approval.
2
December 3, 1991
RESUBDIVISION
ITEM NO.: 2 continued FILE NO.: 5-939i
There being no further items for discussion, the item was
forwarded to the full Commission for resolution.
PLANNING COMMISSION ACTION: (DECEMBER 3, 1991)
The applicant, Robert Brown, was present. There were several
people in.the audience seeking more information. This item was
discussed as a part of Item No. 3 on the agenda which deals with
the rezoning application. The Planning staff recommended approval
of the replat with the recommendation of waivers approval.
Mr. Brown stated the present market demands small lots and
small office buildings, a maximum of two-story in height. He
also pointed out revisions that have been made on the planning
staff's request to meet ordinance standard for office/commercial
subdivision. Then the discussion moved to the buffer and
preservation of "OS" space which was a part of the rezoning
item. After a lengthy discussion, a motion was made to approve
the replat as filed with recommendation of waivers approval.
The motion passed by a vote of 10 ayes, 0 noes and 1 abstention.
3
ORDINANCE
16,140
AN ORDINANCE AMENDING CHAPTER 31 OF THE
CODE OF ORDINANCES OF THE CITY OF LITTLE
ROCK, ARKANSAS PROVIDING FOR A WAIVER OF
LENGTH OF CUL-DE-SAC AND WIDTH OF STREET
RIGHT-OF-WAY AND STREET REQUIREMENTS FOR
PARKWAY OFFICE SUBDIVISION
BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF
LITTLE ROCK, ARKANSAS.
SECTION 1. That Chapter 31 of the Code of Ordinances
be amended to provide for waivers of certain requirements
within the subdivision regulations of the City of Little
Rock for Parkway Office Subdivision as follows:
Subsection a. That Section 31-282 be amended to
allow more than 300 feet long cul-de-sac with a 50 foot
right-of-way and 27 feet pavement.
SECTION 2. This ordinance shall take effect thirty
(30) days from and after its passage.
PASSED: January 7, 199-2
ATTEST:
Robbie Hancocl:
City Clerk
Sharon Priest
Mayor
March 9, 1993
ITEM NO.• 2 0 FILE NO.: S-934
NAME: Parkway Office Resubdivision of West Highlands Addition
LOCATION: Hardin Road north of Financial Center Parkway
DEVELOPER: ENGINEER:
AMR REAL ESTATE DEVELOPMENT CONSULTANTS
DREW BASHAM 2024 Arkansas Valley Drive #306
201 East.Markham, Suite 150 Little Rock, AR 72212
Little Rock, AR 72201 221-7880
375-0378
REOUEST•
This owner files a request for one-year time extension for
preliminary plat approval. The application was originally approved
by the Planning Commission on December 3, 1991 and the variances
which had been requested were approved by the Board of Directors on
January 7, 1992.
STAFF COMMENT RECOMMENDATION:
The Board of Directors approved the applicant's request to allow
the length of the cul-de-sac street to exceed the maximum 300 feet
length as provided in the Subdivision Ordinance, allowed the street
width to be 27 feet to match the width of the existing street width
to which this section of street will connect, and allowed the
right-of-way width to be 40 feet in that section of the street
which abuts adjoining property where there is an off -set in the
right-of-way line on the adjoining property.
The staff recommends approval of the time extension.
SUBDIVISION COMMITTEE COMMENT:
(FEBRUARY 18, 1993)
The request was presented to the Committee and the Committee
recommended that the application be forwarded to the Commission for
approval.
PLANNING COMMISSION ACTION: (MARCH 9, 1993)
This item was recommended for inclusion in the Consent Agenda for
approval. When asked by the Chairman if anyone was present at the
hearing who was opposed to any item on the Consent Agenda, no one
responded. In its approval of the Consent Agenda, this item was
approved with 9 ayes, 0 nays and 2 absent.