HomeMy WebLinkAboutS-0924-D ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING. APPROVALS
NAME —SPRING VALLEY MANOR SUBDIVISION REPLAT OF LOTS 22&23
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
j� All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Ce ' improvements emain uncompleted and a punch list has been prepared and sent.
/ Engineering Specialist Date:_ 17 ,—
ADDRESSING SPECU&IST'S REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage and street lights.
Indicate the number of street signs ordered for this plat for billing to developer
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
\Lt---Civil Engineer I/II Date: j 12—
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requir t approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied)
Date:
Design Review Engineer/Civil Engineering Manager
February 2007
Date:
CIVIL DESIGN * INCORPORATED
ANTRELL RDSTE ')I -
December 12, 2007
Ms. Donna James
Subdivision Administrator
Little Rock Planning & Development
723 West Markham Street
Little Rock, Arkansas 72201
Re: Daunhauer Property
Spring Valley Manor
Dear Donna:
16623 C.,
LITTLE ROCK, ARKANSAS
72223
Enclosed herewith are three (3) copies of the above referenced final plat. Please forward
copies as needed to the other review people for plat approval. Once any comments are
received from the City, we will return with a final submittal for signing with all of the other
required documents.
Respectfully submitted,
CIVIL DESIGN, INC.
William L. Dean, P.E.
Project Engineer
cc: Mr. Mark Lyons
WLD/sds
Donna James December 12 (Letter)
97-6 SV
HRLY
■ ENGINEERING & SURVEYING SERVICES — TEL (501) 868-7717 • FAX (501) 868-5099