Loading...
HomeMy WebLinkAboutS-0908 ApplicationCITY OF LITTLE ROCK, ARKANSAS DEPARTMENT OF NEIGHBORHOOD REVITALIZATION AND PLANNING FILING FEES NO. DATE ,19i' Annexation . . . . . . . . . . . . . . Board of Adjustment Application. .':;"' ' Conditional Use Permit s C�05 Final Plat . . . . . . . . 4 .��\ Planned Unit Development . . Preliminary Plat . . . . . . . _ . . '$ Rezoning Application . .. . . . . . . . . . . $ Site Plan (Multiple Building/Zoning) . . . . $ Special Use Permit . . . . . . . . . . . . . $ Street, Alley, or Easement Closure . . . . $ Street Name Change . . . . . . . . . . . . . $ Street Name Signs: # Signs at ea. $ TOTAL $ File No.: Address: •<<.`., i Applicant: By: ki 6F, C�4sr B�� r 1 — 44 O 7,—F li � a I I 11 lil 11111 I�' �� A` a U- 4i i.-ti ti <219 ti �40UP�i 1NN U� Site Plan Review A/R ?O eT TRS 1N,11W18 ITEM NO. PO S-908 Holiday Inn Express 1-430 -N- CT 10 2/91 4120 Rogers Avenue Post Office Box 126 Fort Smith, Arkansas 72902 January 10, 1991 City of Little Rock Planning Commission Little Rock, Arkansas Gentlemen: We are requesting zoning of the existing property at the southeast corner of I-440 and Bankhead Drive intersection to C-3 for the purpose of building a 190-room hotel. We feel this hotel is needed at this location to handle the growth of business from Adams Field and vicinity, as well as from the Industrial Park and the port located in this area, the traffic from I-440 and the growth of general business in Little Rock. Thank you very much. Sincerely, C & H MANAGEMENT COMPANY Lloyd Ho bs lh/7P City of Little Rock Department of NolghborhoDd Revitalization and Planning- 723 West Markham Little Rock, Arkansas 72201 (501) 371-4790 Date 1/15/91 Arkansas Power & Light Company Arkansas Louisiana Gas Company Southwestern Bell Telephone Company Little Rock Municipal Water Works Little Rock Wastewater Utility System County Planning Little Rock Fire Department RE: Holiday Inn Express/Site Plan Gentlemen: Planning Zoning and Subdivision Name: Holiday Inn Expres File No. Location: Type of Issue: Site Plan On February 12, 19 91, the Little Rock Planning Commission will consider the above referenced subject. A copy of the Issue is enclosed for your consideration, and your comments and/or recommendations will be greatly appreciated. Sincerely, <-a5d Borkowski Neighborhood Revitalization and Planning (Please respond below, and return this letter for our records). ,Approved as submitted Easements required (see attached plat or description below) Comments: By: Enclosure cc: Engineering Division Little Rock 221 E. Capitol Wastewater11 D Little Rock, Arkansas 72202 Utility501 /376-2903 FAX #501/376-3541 SUBDIVISION COMMITTEE REVIEW January 31, 1991 ITEM COMMENTS ---------------------------------------------------------------------- DEFERRED ITEMS -------------- Pulaski Heights United Methodist Churct Spruce Street A. PRELIMINARY PLATS ----------------- 1. Lot 1 Saxton's Addition 2. Kitchen's Addition 3. Girard Addition B. PLANNED UNIT DEVELOPMENT ------------------------- 4. South Bluff Co. 5. Community Bakery 6. Cambridge Place Sewer mains located on site. Contact LRWWU for details. Existing Sewer Main in ROW, Easement must be retained. Sewer main extension required with easements. Sewer main extension required with easements. Sewer main extension required with easements. Sewer available, not adversely affected. 8" sewer main located in alley. No building allowed over the existing sewer main. Contact LRWWU. Sewer located on site in easement. Sewer main extension required to serve all lots. 7. Bank And Business Forms, Inc. Sewer service at North property line. Proposed building floor elevation may be too low for gravity service. Contact LRWWU for details. SUBDIVISION COMMITTEE REVIEW 8. B. Brum Below C. REZONING 9. 9007 Johnson Lane D. SUBDIVISION SITE PLANS ----------------------- 10. Holiday Inn Express 11. Woodhill Village January 31, 1991 Sewer main extension required with easements. Sewer not available. 8" sewer main located on site. No building allowed over existing sewer main. Contact LRWWU. Sewer Main Extension required with easements. Capacity Contribution Analysis required for this project. Contact LRWWU for details. E. CONDITIONAL USE PERMIT ---------------------- 12. Geyer Springs Baptist Church Sewer main extension required with easements. 13. Wilson 14. Phillips 66 Co. 15. Fellowship Bible Church 16. Ranch Properties F. ZONING SITE PLAN ---------------- 17. Clark G. STREET NAME CHANGE ------------------ 18. High Street - Dr. Martin Luther King Drive Sewer not available. Sewer available, not adversely affected. Sewer Main Extension submitted and approved. Construction not started at this time. Sewer main extension required with easements. Sewer not available. No comment required. PLANNING COMMISSION REVIEW LITTLE ROCK MUNICIPAL WATER WORKS 01/31/1991 NAME PULASKI HEIGHTS UNITED .METHODIST CHURCH SPRUCE STREET - PULASKI HEIGHTS ADDITION LOT 1, SAXTON'S ADDITION - 2923 W. 60TH STREET KITCHEN'S ADDITION GIRARD ADDITION SOUTH BLUFF COMPANY COMMUNITY BAKERY CAMBRIDGE PLACE HOMES BANK AND BUSINESS FORMS, INC. B. BRUMBELOW 9007 JOHNSON LANE HOLIDAY INN EXPRESS - I-440 WOODHILL VILLAGE APARTMENTS GEYER SPRINGS BAPTIST CHURCH WILSON PHILLIPS 66 COMPANY ;FELLOWSHIP BIBLE CHURCH RANCH PROPERTIES HIGH STREET TO DR. MARTIN LUTHER KING DRIVE C'LARK PARKWAY PLACE COMMERCIAL SUBDIVISION RETT TUCKER SUMMIT MALL - PCD KELTON BROWN, SR. SD WILLIS COMMENTS ----- WILL ABANDON 2-INCH IN SPRUCE STREET IF NO SERVICE IS REQUIRED. OTHERWISE, NEED TO RETAIN AS UTILITY EASEMENT - -- WILL ABANDON 2-INCH IN SPRUCE STREET IF NO SERVICE IS REQUIRED. OTHERWISE, NEED TO RETAIN AS UTILITY EASEMENT. ---- REQUEST N. 15' OF LOT 1 BE SET ASIDE AS A UTILITY EASEMENT. ----- NO OBJECTIONS ----- MAIN EXTENSIONS REQUIRED TO OBTAIN SERVICE TO LOTS 2 & 3. ADDITIONAL FIRE PROTECTION REQUIRED. ---- RENEWAL OF FIRE PROTECTION SYSTEM IN MAIN BUILDING IS REQUIRED. - - NO OBJECTIONS ----- WATER MAIN EXT. REQ'D. ALL CONSTRUCTION & EXCAVATION WITHIN THE 50' EASEMENT MUST BE CAREFULLY COORDINATED WITH W.W. ADDITIONAL FIRE PROTECTION MAY BE REQ'D. ----- ON -SITE FIRE PROTECTION REQUIRED FOR PHASE 2. ------ NO OBJECTIONS NO OBJECTIONS ------- ACREAGE CHARGE OF $150/ACRE APPLIES. PLEASE CONTACT WATER WORKS REGARDING METER SIZE REQUIRED. ----- WATER MAIN MUST BE TIED INTO THE 6-INCH MAIN AT KANIS AND LEANDER. -- - A PRO RATA FRONT FOOTAGE CHARGE OF $15/FT. (2,200 L.F. = $33,000/ONLY OUTSIDE FLOODWAY) APPLIES. ----- ACREAGE CHARGE OF $150/ACRE MAY APPLY IF ADDITIONAL SERVICE IS REQUIRED. --- - A PRO RATA FRONT FOOTAGE CHARGE OF- $12/FT. APPLIES ALONG BOWMAN ROAD. ------ NO OBJECTIONS. --- - MAIN EXT. REQ'D. ON -SITE FIRE PROTECTION MAY BE REQ'D. ACREAGE CHARGE OF $150/ACRE APPLIES TO AREA OUTSIDE THE EXIST. IMP. DIST. & WITHIN 1/4 MILE OF HWY. 10. ---- NO OBJECTIONS --- NO INFORMATION RECEIVED. - --- NO INFORMATION RECEIVED. - --- NO INFORMATION RECEIVED. ----- NO INFORMATION RECEIVED. ----- NO INFORMATION RECEIVED. ----- NO INFORMATION RECEIVED. Page number 1 City of Little Rock Department of Neighborhood Revitalization and 723 West Markham Little Rock, Arkansas 72201 13 (501) 371-4790 Date 1/15/91 Arkansas Power & Light Company Arkansas Louisiana Gas Company Southwestern Bell Telephone Company Little Rock Municipal Water Works Little Rock Wastewater Utility System County Planning Little Rock Fire Department RE: Holiday Inn Express/Site Plan Gentlemen: Plannin4 Zoning anc Subdivisior Name: Holiday Inn Expre: File No. Location: Type of Issue: Site Plan On February 12 , 19 91, the Little Rock Planning Commission will consider the above referenced subject. A copy of the Issue is enclosed for your consideration, and your comments and/or recommendations will be greatly appreciated. Sincerely, 114. ad Borkowski Neighborhood Revitalization and Planning (Please respond below, and return this letter for our records). ___t4-Approved as submitted Easements required (see attached plat or description below) Comments: MUrs"r-MV Enclosure cc: Engineering Division City of Little Rock N Ion Department of Neighborhood Revitalization 723 West Markham Little Rock, Arkansas 72201 (501) 371-4790 Date 1/15/91 Arkansas Power & Light Company Arkansas Louisiana Gas Company Southwestern Bell Telephone Company Little Rock Municipal Water Works Little Rock Wastewater Utility System County Planning Little Rock Fire Department RE: Holiday Znn Express/Site Plan Gentlemen: no Planning Zoning and Subdivision Name: Holiday Inn Express File No. Location: Type of Issue: Site Plan On February 12_, 19 91, the Little Rock Planning Commission will consider the above referenced subject. A copy of the Issue is enclosed for your consideration, and your comments and/or recommendations will be greatly appreciated. Sincerely, ad Borkowski Neighborhood Revitalization and Planning (Please respond below, and return this letter for our records). Approved as submitted -- Easements required (see attached plat or description below) Co ants: ALS-Q-� __ �.s' Ga,Serne�5a21��d Enclosure cc: Engineering Division )-ZI- 5/