Loading...
HomeMy WebLinkAboutS-0888-C ApplicationGmail - Hinson Loop Plat https://mai l.google.com/mail/u/O/?ui=2&ik=27Oa213 a2a&view--pt&q=pl... M Gmail Hinson Loop Plat Jason Lowder <Jason.Lowder@carkw.com> To: Jonathan Hope <jonathanlhope@gmail.com> CAW Approves with no comments. Thank You Central Arkansas Water Jason Lowder, Engineering Technician jason.lowder@carkw.com 501-377-1245 Jonathan Hope <jonathanlhope@gmail.com> Mon, Jul 6, 2015 at 9:32 AM From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Monday, July 06, 2015 8:52 AM To: Jason Lowder; steven.hotho@lrwu.com; andrew.townsend@centerpointenergy.com; bneumei@entergy.com; Floriani, Vince; vharper@liftlerock.org Subject: Re: Hinson Loop Plat [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] SINCERELY, JONATHAN HOPE www.hopeconsulting.com 117 SOUTH MARKET STREET BENTON. ARKANSAS 72015 TELEPHONE: (501) 315-2626 1 of 2 6/20/2016 12:35 PM Gmail - Hinson Loop Plat https://mail.google. com/mail/u/O/?ui=2&ik=27Oa213 a2a&view--pt&q=pl... i I Gmail Hinson Loop Plat Vincent Hotho <Steven.Hotho@lrwu.com> To: Jonathan Hope <jonathanlhope@gmail.com> We therefore have no objection. Thanks, S. Vincent Hotho, P.E. Engineering Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.442.6042 From: Jonathan Hope[mailto:jonathanlhope@gmail.com] Sent: Wednesday, September 02, 2015 12:53 PM To: Vincent Hotho Subject: Re: Hinson Loop Plat Jonathan Hope <jonathanihope@gmail.com> Wed, Sep 2, 2015 at 1:07 PM The sewer main is located on the opposite side of our property line. It is located within a sewer easement (Instrument # 99-02044S). Let me know if you have any other questions or concerns. Thank you!! On Thu, Jun 25, 2015 at 8:30 AM, Vincent Hotho <Steven.Hotho@lrwu.com> wrote: There is an existing 8" sewer main which runs north -south along the west edge of this property. Please verify that the sewer main falls within the 10' Utility & Drainage easement. If so, then LRW has no objection. S. Vincent Hotho, P.E. Engineering Supervisor Little Rock Wastewater Utility ofc: 501.688.1452 Mbl: 501.442.6042 From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Thursday, June 25, 2015 8:11 AM To: jason.lowder@carkw.com; Vincent Hotho; andrew.townsend@centerpointenergy.com; bneumei@entergy.com; Floriani, Vince; vharper@littlerock.org Subject: Fwd: Hinson Loop Plat Good morning, I need to get your blessing or comments on the plat I have attached on Hinson Loop Road. Let me know if you have any questions. Thanks for your 1 of 3 6/20/2016 12:49 PM Gmail - Hinson Loop Plat https://mail.google. com/mail/u/0/?ui=2&ik=270a213 a2a&view--pt&q=pl... help. ----- Forwarded message - From: James, Donna <DJames@littlerock.org> Date: Thu, Jun 25, 2015 at 7:51 AM Subject: RE: Hinson Loop Plat To: Jonathan <jonathanlhope@gmail.com> Looks good. I have attached a copy of the utilities you need to contact to get their approval and sign -off. You also need to contact public works to get their approval. Once you have a sign -off for all the utilities I will then sign the plat for recording. Vince Floriani — vflodani@littlerock.org Vance Harper — vharper@littlerock.org From: Jonathan [mailto:jonathanlhope@gmail.com] Sent: Wednesday, June 24, 2015 3:23 PM To: James, Donna Subject: Fwd: Hinson Loop Plat Please find the attached revised plat per your comments. Thanks Sent from my iPhone Begin forwarded message: From: "Brian Johnson" <bdan@hopeconsulting.biz> Date: June 24, 2015 at 3:18:07 PM CDT To: "'Jonathan Hope"' <jonathanlhope@gmail.com> Subject: Hinson Loop Plat Sincerely, Jonathan Hope I 1 www.hopeconsulting.com 2 of 3 6/20/2016 12:49 PM Gmail - Hinson Loop Plat https://mail.google.com/mail/u/O/?ui=2&ik=27Oa2l 3 a2a&view=pt&q=pl.. _ M Gmail Hinson Loop Plat Townsend, Andrew W <andrew.townsend@centerpointenergy.com> To: Jonathan Hope <jonathanlhope@gmail.com> Mr. Hope, Jonathan Hope <jonathanihope@gmaii.com> Centerpoint Energy has no objection to the proposed plat of LOT 2 of HINSON CORNERS SUBDIVISION. If I can be of any further assistance please let me know. Thanks, Andrew'W. Townsend Engineer II Little Rock - Lyons work: (501) 3774679 cell: (501) 519-1836 Em►JY Mon, Jun 29, 2015 at 3:23 PM From: Jonathan Hope[mailto:jonathanihope@gmail.com] Sent: Thursday, June 25, 2015 8:11 AM To: jason.lowder@carkw.com; steven.hotho@lrwu.com; Townsend, Andrew W; bneumei@entergy.com; Floriani, Vince; vharper@littlerock.org Subject: Fwd: Hinson Loop Plat Good morning, I need to get your blessing or comments on the plat I have attached on Hinson Loop Road. Let me know if you have any questions. Thanks for your help. ------- Forwarded message From: James, Donna <DJames@littlerock.org> Date: Thu, Jun 25, 2015 at 7:51 AM Subject: RE: Hinson Loop Plat To: Jonathan <jonathanlhope@gmail.com> Looks good. I have attached a copy of the utilities you need to contact to get their approval and sign -off. You also need to contact public works to get their approval. Once you have a sign -off for all the utilities I will then sign the plat for recording. 1 of 3 6/20/2016 12:48 PM Gmail - Hinson Loop Plat https://mail.google. com/mait/u/O/?ui=2&ik=27Oa213 a2a&view=pt&q=pl... Vince Floriani — vflodani@littlerock.org Vance Harper—vharper@littlerock.org From: Jonathan[mailto:jonathanlhope@gmail.com] Sent: Wednesday, June 24, 2015 3:23 PM To: James, Donna Subject: Fwd: Hinson Loop Plat Please find the attached revised plat per your comments. Thanks Sent from my iPhone Begin forwarded message: From: "Brian Johnson" <bdan@hopeconsulting.biz> Date: June 24, 2015 at 3:18:07 PM CDT To: "'Jonathan Hope"' <jonathanlhope@gmail.com> Subject: Hinson Loop Plat SINCERELY, JONATHAN HOPE www.hopeconsulting.com 117 SOUTH MARKET STREET BENTON, ARKANSAS 72015 TELEPHONE: (501) 315 - 2626 ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources. ***** 2 of 3 6/20/2016 12:48 PM Gmail - Hinson Loop Plat https:Hmail.google.com/mail/u/0/?ui=2&ik=270a213 a2a&view--pt&q=pl... J"-''1 Gmail Jonathan Hope <jonathanlhope@gmail.com> Hinson Loop Plat KEATHLEY, CHRIS <ck0826@att.com> Wed, Sep 2, 2015 at 5:21 PM To: "jonathanlhope@gmail.com" <jonathanlhope@gmail.com> Cc: "DONNA JAMES (djames@littlerock.org)" <djames@littlerock.org> AT&T approves the proposed replat of Lot 2 in the Hinson Corners Subdivision of the City of Little Rock. Chris Keathley Lead O5P Ping & Eng Dsgn 501.373.6594 0 501.615.5823 C From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Wednesday, September 02, 2015 4:18 PM To: KEATHLEY, CHRIS [Quoted te)d hidden] [Quoted te# hidden] 2 attachments Utility Contacts.doc 30K 15-0032-Plat revised.pdf 1037K 1 of 1 6/20/2016 12:52 PM Gmail - Hinson Loop Plat https://mail.google. com/mail/u/0/?ui=2& ik=270a2 l 3 a2a&view=pt& -.. Gmail Hinson Loop Plat NEUMEIER, BERNARD <BNEUMEI@entergy.com> To: Jonathan Hope <jonathanlhope@gmail. com> Jonathan — sorry for the delay — been out of the country. Entergy approves of the plat as you have modified it. Thanks, Bernard Neumeier Region Engineering Supervisor Entergy Arkansas, Inc. 8-721-5158 501-954-5158 501-954-5175 fax 501-733-0045 cell From: Jonathan Hope[mailto:jonathanlhope@gmail.com] Sent: Monday, June 27, 2016 8:53 AM To: NEUMEIER, BERNARD Subject: Re: FW: FW: Hinson Loop Plat Jonathan Hope <jonathanlhope@gmail.com> Tue, Jul 5, 2016 at 9:54 AM EXTERNAL SENDER. DO NOT click Iinks if sender is unknown. DO NOT provide your user ID or password. Bernard, [Quoted text hidden] [Quoted text hidden] 1 of 1 7/11/2016 8:38 AM CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: HINSON CORNERS LOT 2 INSPECTOR REPORT have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT 1 have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT 1 have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. _ - All other requirements for final plat approval have been satisfied. Civil Engineer 1/II Date: SURVEYOR REPORT 1 have reviewed the plat and find that: All requirements for final plat approval have been satisfied. 1 Surveyor Date: —i MANAGER APPR AL All Civil Engineering requirements for filing this final plat have been satisfied. Design Review Engineer/Civil Engineering Manager U111cetive: July 7, 2015 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: HINSON CORNERS LOT 2 INSPECTOR -REPORT 1 have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. Civil Engineer 1/II Date: SURVEYOR REPORT 1 have reviewed the plat and find that: All requirements for final plat approval have been satisfied. I Surveyor Date: —i MANAGER APPii AL All Civil Engineering requirements for filing this final plat have been satisfied. / - ---•r Date: Design Review Engineer/Civil Engineering Manager L•;flective: July 7, 2015 James, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Friday, March 11, 2016 5:58 PM To: Jonathan Hope; James, Donna; Floriani, Vince Subject: RE: FW: Hinson Loop Plat Please make sure that the existing sewer main as constructed falls inside the easement on the west side of the lot. Please extend the easement if needed. The sewer main isn't shown on the drawing, so I don't know where it is in relation to the lot line or the easement line. Thanks, S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.442,6042 From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Monday, March 07, 2016 4:07 PM To: James, Donna <DJames@littlerock.org>; Floriani, Vince <VFloriani@littlerock.org>; Vincent Hotho <Steven.Hotho @Irwu.com> Subject: Fwd: FW: Hinson Loop Plat Lot 2 Hinson Corners Subdivision I believe our office dropped the ball on this plat. We need to get this over the last hurdle to get this signed off on please. We were waiting on all of the utilities to sign off on the plat and correct and error in the text. Let me know if we can get this filed. Thanks ---------- Forwarded message ---------- From: KEATHLEY, CHRIS <ck08260att.com> Date: Wed, Sep 2, 2015 at 5:21 PM Subject: FW: Hinson Loop Plat To: "jonathanlhope@gmail.com" <ionathanlhopeQgmail.com> Cc: "DONNA JAMES (daames(@.1ittlerock.org)" <djamesfc�?littlerock.org� AT&T approves the proposed replat of Lot 2 in the Hinson Corners Subdivision of the City of Little Rock. Chris Keathley Lead 05P Ping & Eng bsgn 501.373.6594 0 501.615.5823 C From: Jonathan Hope[mailto:jonathanlhopeg r[Lail.Gorn] Sent: Wednesday, September 02, 2015 4:18 PM To: KEATHLEY, CHRIS Subject: Fwd: Hinson Loop Plat Please find the attached plat for your review. Let me know if you have any questions or concerns. Thanks ---------- Forwarded message ---------- From: Jonathan Hope <jonathanlhope@gmail.com> Date: Thu, Jun 25, 2015 at 8:10 AM Subject: Fwd: Hinson Loop Plat To: jason.lowder[a,3carkw.com, steven.liotho .lrwu.cam, andrew.townsend(a),centerl)aintenergy.com, bneutnei cntergy.com, "Floriani, Vince" <vfloriani a littlerock.or >, vharper cr.litt[crock.= Good morning, I need to get your blessing or comments on the plat I have attached on Hinson Loop Road. Let me know if you have any questions. Thanks for your help. =--------- Forwarded message ---------- From: James, Donna <DJamesQlittlerock.or > Date: Thu, Jun 25, 2015 at 7:51 AM Subject: RE: Hinson Loop Plat To: Jonathan <_ionathanlhopea.gmail.com> Looks good. I have attached a copy of the utilities you need to contact to get their approval and sign -off. You also need to contact public works to get their approval. Once you have a sign -off for all the utilities I will then sign the plat for recording. Vince Floriani — vfloriani@littlerock.org Vance Harper — vhaMer cr littlerock.org 4 1 — — — — NY0616E 14756 I 'a — in 6n✓IYd oMWnnE E.VSFMENf I ! 1 � I I fn = I I ! 1 1 I oZ cnmr0 n (n N 1 I 1 0O c ! I I I I z o < I r I D cn i I Do I Z j Z D ! f- - n•o�L - U) J! -_—_—___--------- 1-------.---__-------_ i6uriurvawwwweuseMeNr i I � sz�snw 1056 — — — — — — — I IIN50N L(]I )P R11.{D fi? R/W .a—mecn.-------- 'CjO� mom imza°^y �i � z m o4m�e m m Em mmN>o>;` z o S i�4oym0 � D y F�ooz em�r3 BASIS FOR BEARINGS: �yyzm39 9 g GRID NORTH ARICANSAS COORDINATF.SYSTI-.NI. y m ip SOUTH ZONE BY G.P S. i 3 q. OBSERVATIONS. p-1Emr'm� 9y�1 HP�y�i� )jjgpp]p30 �j1 ]gP! �yiz_ •u3 �^ZI{ �• /a21, Sg y8?c =Is �1��3°Ir•� Px _I=� �� � �� � r�> fit, €� _ - - F f �� � ' i� - Lit �rE �I-� �� 4�� t�T if`$ �� .�. .� �iro� L 'S,£ �: °x'. � � j�, 3�gP € �� _ I 'i � ! � 1 1 �•�� - {"1[. .. ~z y, �' Vim, 7 `YS� Y -� S€ a{ :a S` I: --l�.i:•> j �-_yay - (a 7 a �v� ®.O%E SNOUVA119SOO 'Sd J Aa 3NOZ HlnOS •IV9l.SAS91VNl(J)JO D SVSM'>INV H1NUN ❑ill) fi :S9NIHYj9 NUd SISY9 i Yob ------------- .os ml N.usczs � I 1113135Y 3lrvxMp9NNNdi — — — — — -----^---'-------- —_---____� I `l I Z ! I Cn Q I I I > I ! (n p a V I I ! O I NC19 3 ! zco ! If I 1§ I z Y I I � Z o I I ! I J ! I I I I I I I ! I I ! L---_--_ — — —_— � A �� i�R u.3wra 3ovNmw vunwd ti .OBeI 3AI8CZN G 1 James, Donna From: KEATHLEY, CHRIS <ck0826@att.com> Sent: Wednesday, September 2, 2015 5:21 PM To: jonathanihope@gmail.com Cc: James, Donna Subject: FW: Hinson Loop Plat Attachments: Utility Contacts.doc; 15-0032-Plat revised.pdf AT&T approves the proposed replat of Lot 2 in the Hinson Corners Subdivision of the City of Little Rock. Chris Keathley Lead OSP Ping & Eng Dsgn 501.373,6594 O 501.615.5823 C From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Wednesday, September 02, 2015 4:18 PM To: KEATHLEY, CHRIS Subject: Fwd: Hinson Loop Plat Please find the attached plat for your review. Let me know if you have any questions or concerns. Thanks ---------- Forwarded message ---------- From: Jonathan Hope C onathanlho a ail.com> Date: Thu, Jun 25, 2015 at 8:10 AM Subject: Fwd: Hinson Loop Plat To: jason.lowder(r�z�,carkw.com, steven.hotho(a7lrwu.com, andrew.townsend cente ointener .com, bneumei a entergy.com, "Florian, Vince" <vfloriani@littlerock.org>,yhner@littlerock.org Good morning, I need to get your blessing or comments on the plat I have attached on Hinson Loop Road. Let me know if you have any questions. Thanks for your help. ---------- Forwarded message ---------- From: James, Donna cDJanyest�aa littlerock.or > Date: Thu, Jun 25, 2015 at 7:51 AM Subject: RE: Hinson Loop Plat To: Jonathan <ionathanlho12e(c7pmai1.com> Looks good. I have attached a copy of the utilities you need to contact to get their approval and sign -off. You also need to contact public works to get their approval. Once you have a sign -off for all the utilities I will then sign the plat for recording. Vince Floriani — vfloriani@littlerock.or Vance Harper — v_hamer07a littlerock.org From: Jonathan[mailto:jonathanlhope@gmail.roml Sent: Wednesday, June 24, 2015 3:23 PM To: James, Donna Subject: Fwd: Hinson Loop Plat Please find the attached revised plat per your comments. Thanks Sent from my iPhone Begin forwarded message: From: "Brian Johnson" cbrian Ahopeconsulting.bizp> Date: June 24, 2015 at 3:18:07 PM CDT To: "'Jonathan Hope"' C onathanlho ena mail.com> Subject: Hinson Loop Plat Sincerely, Jonathan Hope 15 www.hOReconsulting.corn 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope IHI ww w. hopecon su 1 ti ng, corn 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626