Loading...
HomeMy WebLinkAboutS-0878-C Map 3ITEM NO.: 1. NAME: Lots 1 — 5 Replat of Tracts 8 & 9 Hopson and Sach's Addition LOCATION: located South of Kanis Road and West of Michael Drive Planning Staff Comments: S-878-C 1. Provide notification of abutting property owners of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than December 19, 2007. The Office of Planning and Development must receive the proof of notice no later than December 28, 2007. 2. The Subdivision Ordinance for commercial subdivision does not allow lots to be created with a depth greater than three times the width. The plat as indicated creates a depth to width ratio variance for Lots 1, 2, 4 and 5. 3. The front setback required for commercially zoned C-3 property is 25-feet. The plat as proposed indicates a 35-foot platted building line adjacent to Kanis Road. 4. Provide the source of title of the landowner on the proposed preliminary plat. 5. The lots are indicated in excess of the minimum 100-foot lot width and the minimum 14,000 square foot lot area. Variance/Waivers: A variance to allow an increased lot depth to width ratio. (Section 31-284(b)) Public Works Conditions: 1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. 2. With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to these streets including 5-foot sidewalks with planned development. 3. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 4. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 5. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering at 379-1813 (Steve Philpott) for more information. 6. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required with easements. Item # 1. Enter : No comment received. Center -Point Enemy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact CAW regarding requirements prior to development of this property. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is located on CATA Bus Route #3, the Baptist Medical Center Route. Parks and Recreation: If Kanis Road is considered for expansion, please allow for a separated bikeway along Kanis Road. Planning Division: No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, December 5, 2007. Item # 1. March 27, 2008 ITEM NO.: A FILE NO.: S-878-C NAME: Lots 1 — 5 Replat of Tracts 8 & 9 Hopson and Sach's Addition LOCATION: Located South of Kanis Road and West of Michael Drive DEVELOPER: Pam Brown Courtney P.O. Box 55145 Little Rock, AR 72205 ENGINEER: McGetrick and McGetrick 10 Otter Creek Circle, Suite A Little Rock, AR 72210 AREA: 7.85 acres CURRENT ZONING PLANNING DISTRICT CENSUS TRACT: NUMBER OF LOTS: 5 FT. NEW STREET: 0 LF C-3, General Commercial District 10 — Boyle Park aKiXj VARIANCES/WAIVERS REQUESTED: A variance to allow an increased lot depth to width ratio. (Section 31-284(b)) A. PROPOSAL/REQUEST: The applicant is requesting a replat of Tracts 8 and 9 Hopson and Sach's Subdivision containing 7.85 acres into five (5) commercially zoned lots. The owner plans to develop five office/commercial lots. There will be no new street construction as a result of the subdivision. Access will be provided from Kanis Road. The lots will share driveway accesses to limit the number of curb cuts from Kanis Road. The average lot size proposed is 120-feet by 515-feet. The lots range in size from 1.39 acres to 2.01 acres. All easements are to be used for utility and/or drainage. All easements on common lot lines are ten (10) feet in width, with five (5) feet on either side of the lot line unless otherwise noted. March 27, 2008 SUBDIVISION ITEM NO.: A Cont. FILE NO.: S-878-C The request includes a variance request from the typical minimum standards of the Subdivision Ordinance. The applicant is seeking a variance from Section 31-284(b) to allow an increased lot depth to width ratio for proposed Lots 1, 2, 4 and 5. B. EXISTING CONDITIONS: The site is wooded sloping downward from front to back (north to south). The general area contains a mixture of office and commercial uses located within the C-3, General Commercial District zoned property across Kanis Road to the north. Undeveloped 0-3, General Office District zoned property is located to the south, with an apartment complex to the southeast. There is a narrow undeveloped C-3, General Commercial District immediately west, with a mixture of commercial uses further west along Barrow Road. Undeveloped C-3, General Commercial District zoned property is located to the east of the site. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received an informational phone call from the John Barrow Neighborhood Association. The John Barrow Neighborhood Association, the Brownwood Terrace Neighborhood Association and all abutting property owners were notified of the Public Hearing. The applicant met with the John Barrow Neighborhood Association at their December 12, 2007, Neighborhood Association meeting. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. 2. With the site development, provide the design of the street conforming to the Master Street Plan. Construct one-half street improvement to the street including 5-foot sidewalk with the planned development. 3. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 4. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. VA March 27, 2008 SUBDIVISION ITEM NO.: A FILE NO.: S-878-C 5. Streetlights are required per Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering at 379-1813 (Steve Philpott) for more information. 6. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements. Contact Little Rock Wastewater for additional information. Entergy: Easements required around the sites perimeter. Contact Entergy for additional information. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding requirements prior to development of this property. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is located on CATA Bus Route #3, the Baptist Medical Center Route. F. ISSUES/TECHNICAL/DESIGN: Parks and Recreation: If Kanis Road is considered for expansion, please allow for a separated bikeway along Kanis Road. Planning Division: No comment. Landscape: No comment. 3 March 27, 2008 SUBDIVISION ITEM NO.: A Cont. FILE NO.: S-878-C G. SUBDIVISION COMMITTEE COMMENT: (November 29, 2007) Mr. Pat McGetrick was present representing the owner. Staff presented an overview of the proposed replat stating there were additional items necessary to complete the review process. Staff requested Mr. McGetrick request a variance to allow an increased lot depth to width ratio or revise the plat to eliminate the variance request. Staff also stated the plat indicated the placement of a 35-foot platted building line adjacent to Kanis Road and the Subdivision Ordinance required the placement of a 25-foot platted building line. Public Works comments were addressed. Staff stated Kanis Road was indicated on the Master Street Plan as a minor arterial and a dedication of right of way 45-feet from centerline would be required. Staff stated street improvements including curb, gutter and sidewalk would be required per the Boundary Street Ordinance. Staff stated streetlights were required prior to final platting or certificate of occupancy. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised plat to staff addressing the issues raised at the November 29, 2007, Subdivision Committee meeting. The applicant has indicated the variance request, reduced the front setback to 25-feet and provided the source of title of the landowner in the general notes section of the plat. The applicant is seeking approval of a replat of two previously platted tracts into five (5) commercially zoned lots (C-3, General Commercial District). Access to the lots is proposed from Kanis Road with lots sharing access along common lot lines. The proposed plat is indicated with lots ranging in size from 1.39 acres to 2.01 acres. The lots are proposed for development consistent with the present zoning classification with regard to building setbacks and lot development criteria. The replat as proposed includes a variance to allow an increased lot depth to width ratio for four (4) of the proposed lots. Lots 1, 2, 4 and 5 are indicated with a depth to width ratio of 4.3 to 1. The ordinance states no lot in an office or commercial subdivision shall have a depth exceeding L March 27, 2008 SUBDIVISION ITEM NO.: A (Cont. FILE NO.: S-878-C three (3) times the width. Staff is supportive of the variance request. Staff does not feel the variance will significantly impact the development. Staff is supportive of the replat as proposed. Staff feels the creation of five (5) commercially zoned lots is appropriate. The creation of the commercial subdivision as proposed should enhance to viability of each separate structure and ownership. Otherwise, to staffs knowledge, there are no outstanding issues associated with the request. Staff is supportive of the replat as proposed including the variance associated with the creation of the lots as proposed. STAFF RECOMMENDATIONS: Staff recommends approval of the replat as proposed including the variance to allow an increased lot depth to width ratio for proposed Lots 1, 2, 4 and 5 subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (JANUARY 3, 2008) The applicant was present. There were no registered objectors present. Staff presented the item stating on December 19, 2007, the applicant had requested a deferral of the item to the February 14, 2008, public hearing. Staff stated they were supportive of the deferral request. There was no further discussion of the item. The chair entertained a motion for placement of the item on the Consent Agenda for Deferral. The motion carried by a vote of 10 ayes, 0 noes and 1 absent. STAFF UPDATE: The applicant submitted a request dated February 4, 2008, requesting a deferral of this item to the March 27, 2008, public hearing. Staff is supportive of the deferral request. PLANNING COMMISSION ACTION: (FEBRUARY 14, 2008) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had submitted a request dated February 4, 2008, requesting a deferral of this item to the March 27, 2008, public hearing. Staff -stated they were supportive of the deferral request. 4V March 27, 2008 SUBDIVISION ITEM NO.: A (Cont.) FILE NO.: S-878-C There was no further discussion of the item. A motion was made to approve the item as presented by staff on the consent agenda. The motion carried by a vote of 8 ayes, 0 noes and 3 absent. STAFF UPDATE: The applicant has not contacted staff with regard to disposition of this item since the previous public hearing. Staff recommends this item be withdrawn, without prejudice, and refiled if and when the applicant decides to move forward with the platting of this parcel. PLANNING COMMISSION ACTION: (MARCH 27, 2008) The applicant was present. There were no registered objectors present. Staff presented the item stating the applicant had not contacted staff with regard to disposition of this item since the previous public hearing. Staff presented a recommendation of withdrawal, without prejudice, and recommended the applicant refile the request if and when the applicant decided to move forward with the platting of this parcel. There was no further discussion of the item. The chair entertained a motion for placement of the item on the Consent Agenda for approval of the withdrawal request. The motion carried by a vote of 9 ayes, 0 noes and 2 absent. R