Loading...
HomeMy WebLinkAboutS-0871 Staff AnalysisAugust 28, 1990 SUBDIVISION ITEM NO.: 9 FILE NO.: S-871 NAME: Ray Satterfield Tract LOCATION: 17250 Raines Road DEVELOPER: ENGINEER: Ray Satterfield Ben Kittler 17221 Raines Road Little Rock, AR 72210 455-0601 AREA: 4.5 Acres NUMBER OF LOTS: 3 FT. NEW STREET: 0 ZONING: R-2 PROPOSED USES: Multifamily PLANNI_NG..._DI.STRI_CT: Crystal Valley CENSUS TRACT: VARIANCES REqUESTED : None A. PROPOSAWREQUEST: This proposal consists of a site plan review for 12 free standing one bedroom houses on the 3 acre tract located 3 miles from City Limits west of Stagecoach Road. B. EXISTING CONDITIONS: This site is surrounded by a mixture of both residential and some nonconforming activities. The property is bounded by a county road, being Raines Road on the north. The lot is partially cleared with mature timber on the back side of the property. C. ENGINEERING COMMENTS: Provide minor arterial R/W and improvements for Raines Road. On -site roads should be paved (HMAC). On -site drainage design will need to be approved by Engineer. Detention Ordinance applies. 1 August 28, 1990 SUBDIVISION ITEM NO. 9 _(Continued?._...........__....__._.____._._...... D . ISSUES/LEGAL[TECHIYI_CALf DE_S I.GN There are several issues to be introduced. They are as follows: 1. Provide a 40 foot wide easement with 22 foot paved surface and include in Bill of Assurance. 2. Increase building setbacks to 25 foot. 3. Provide letter from Health Department approving septic tank installation. E. ANALYSIS: The Planning and Engineering Staff have thoroughly reviewed this submittal with respect to all elements as required by ordinance. WE find little or no concern with the construction of the 12 free standing houses. We would support a waiver of street improvements if the developer does not plat Lot 1 and 2 at this time. F. STAFF RECOMMENDATION: Staff recommends approval if the developer agrees to comply with Planning and Engineering Staff comments. SUBDIVISION COMMITTEE REVIEW: (August 16, 1990) ....... ..._... _............................. Mr. Satterfield was present. He described the site plan and various elements of the proposal. He indicated that a lack of fire protection forced him to build 12 individual small buildings instead large free standing building. The right-of-way dedication issue was explained to applicant, as well as, easement requirement for back lot, if app.licant decide to replat his tract. A discussion of septic tank installation resulted in the Staff suggesting the applicant contact the Health Department for final approval and present letter to Planning Staff. The question of the need for replat was raised as to whether it would be easier for applicant to leave this tract in present condition. There were several opinions expressed. It was determined that the applicant will meet with his engineer and choose one of the options presented by Committee. 2 August 28, 1990 SUBDIVISION ITEM NO. 9 (Cgnt_inued)._... w............ PLANNING_COMMI_SSION_._ACTION: (August 28, 1990) Mr. Ray Satterfield was present. The Staff recommended —approval of the site plan if developer agrees to pave his driveway. The Planning Staff also indicated that applicant must dedicate additional R/W and asked for waiver of all street improvements. Mr. Gardner from Public Works stated he supports waiver of all street improvements. He also indicated that any future subdivision of this tract would require all street improvements. The Chairman then asked Mr. Satterfield for his comments. He stated that he does not object paving driveway after receiving financial return from tenants. Commissioner McDaniel asked a question about septic system. Developer/Owner stated that he will use four septic tanks. Mr. Satterfield also added that he lives next door and he will protect this site from demolishing. A brief discussion then followed involving Mr. Sat'terfield and several of the Commissioners. It was determined that applicant will pave driveway one year after last building completed or three years after final approval of this application. A motion was made to approve this application as amended and passed by a vote of 9 ayes, 1 nay, and 1 absent. 3