Loading...
HomeMy WebLinkAboutS-0861-C Map 2CERTIFICATE OF FINAL APPROVAL Pursuant to the Little Rock Subdivision Rules and Regulations, and all of the conditions of approval having been completed, this document is hereby accepted, this certificate is hereby executed under the authority of said Ruled Regulations. Date of Execution —. Found Monument —o Set No. 4 Rebar Overhead Power Line —e Power Pole o- H Sanitary Sewer Mann, --o Water Valve k� Water Meter —a Gas Meter ■ 4"X4" Conc Mon ---e Water Valve Water Meter Gas Meter Fire Hydrant Keltner Commercial Sub APS Investments LLC 10423 Chicot Rd Little Rock,m AR 72209 Rock Planning Commission LOT 2R AND LOT 3 REPLAT OF LOT 2 PHASE 2 Y. M. C. A. ADDITION NOW IN THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS EAST 497.39' CERTIFICATE Of RECORDING This document number filed for record , 2000 in Plat Book Page .......... 2014028690 Received: 5119/2014 1:31:21 PM Recorded: 05119/201401:35:24 PM Filed & Recorded in Official Records of Larry Crane, (Signed) ,LYE` Q Lj� PULASKI COUNTY CIRCUIT/COUNTY CLERK Renfro, Robert/Stephaxiiees $15.00 �� L 2275 Riverfront Lane G (Name) Clerk Humphrey, 9 70073 6 s � ���Y ��� � 201200174YJ � MABELVALE CUTOFF Chicot NWA Properties LLC 4801 N. Hills Blvd Ste 1500 North Little Rock, AR 72116 LAHA ENGINEERS, INC. 6602 Baseline Road Suite E P. 0. Box 190251 Little Rock, Arkansas 72219 501-565-7384 Fax 501-562-5467 e-mail: lahaengrls@sbcglobal.net JD&E 2908 S. University Ave Little Rock, AR 72204 Deed 2011035741 VICINITY MAP NO SCALE CERTIFICATE OF OWNER We, the undersigned, owners of the real estate shown and described herein, do hereby ceritify that we have laid off , platted, and subdivided, and do hereby lay off, plat, and subdivide said real estate in accordance with this plat. n S-S-zn! Date of Execution Instrument No. 2011 061006 kC4 -.0 �Xrlaf KAMBOJ, SATPAL K. 2020 Henson Rd #914 Little Rock, AR 72212 CERTIFICATE OF ENGINEERING ACCURACY I, Troy D. Laha, hereby certify that this plat correctly represents a plan made by me, and that the engineering requirements of the Little Rock Subdivision Rules and Regulations have been complied with. - - 5 - / �L Date of Execution Troy D. Laha Registered Professional Engineer No. 1735, Arkansas CERTIFICATE OF SURVEYING ACCURACY I, Troy D. Laha, hereby certify that this plat correctly represents a boundary survey made or verified by me, all monuments required actually exist and are correctly shown hereon and that all surveying requirements of the Littl pql tktdiva qn Rules and Regulations have been complied with. ��urx�II ! Date of Execution Troy D. Laha Registered Professional Surveyor UPDATED 4-12-14 No. 284, Arkansas PRINTED 4-9-14