Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S-0849-C Map 1
(k_ CURVE DATA DELTA=61'52'31" RADIUS=98.78' TAN.=59.21' LENGTH=106.68' \ N 1 E 4. CURVE DATA DELTA=12'04'35" RADIUS-954.92' TAN.=101.01' LENGTH-201.2 7' ru.ar� I IIJ�IVM �� ''1CpIf1Y MAP (NJ .S.) i p\ �� T E CURVE DATA DELTA=1 T 18'25' RADIUS-572.95' TAN.='61.77' LENGTH-123.06' CERTIFICATE OF SURVEYING ACCURACY I, JOE D WF9TE, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A BOUNDARY SURVEY MADE OR VERIFIED BY ME, ALL MONUMENTS REQUIRED ACTUALLY EXIST AND ARE CORRECTLY SHOWN HEREON AND THAT ALL SURVEYING REOUIREMENTS OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS 50 0 50 150 HAVE BEEN COMPLIED WITH. Scale 1" = 50 ft CL CURVE DATA DELTA=1 T 18'31ir RADUS=1432.39' TAN .=167 13' LENGTH=332.76 1 SIP .24 E 115 18 26T4.74 LOT 39 PLEASANT HEIGHTS (phase I) DATE OF EXECUTION JOE D. WHITE REGISTERED LAND SURVEYOR NO. 534, ARKANSAS CERTIFICATE. --- OF_E_NGINEERING ACCURACY I, TIMOTHY E. DATERS, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A PLAN MAUL BY ME, AND THAT THE ENGINEERING REQUIREMENTS OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS HAVE BEEN COMPLIED WITH. DATE OF EXECUTION PLAT ❑F"' LOTS 1RR- 2R CERTIFICATE OF OWNER WE, THE UNDERSIGNED, OWNERS OF THE REAL ESTATE, SHOWN AND DESCRIBED HEREIN, DO HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED, AND SUBDIVIDED, AND DO HEREBY LAY OFF, PLAT, AND SUBDIVIDE SAID REAL. ESTATE IN ACCORDANCE WITH THIS PLAT. DATE OF EXECUTION DELTIC FARM & TIMBER INSTRUMENT NO. 86-75983 & 88-06535 [omflunwAl PURSUANT TO THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS, AND ALL OF THE CONDITIONS OF APPROVAL HAVING BEEN COMPLETED, THIS DOCUMENT IS HEREBY ACCEPTED, THIS CERTIFICATE IS HEREBY EXECUTED UNDER THE AUTHORITY OF SAID RULES AND REGULATIONS. TIMOTHY E. DATERS REGISTERED PROFESSIONAL DATE OF EXECUTION ENGINEER NO. 5033, ARKANSAS CERTIFICATE OF RECORDING THIS DOCUMENT, NUMBER .FILED FOR RECORD , 19 IN PLAT BOOK PAGE . LITTLE ROCK PLANNING COMMISSION QLN RAL No- TES.-1. 1/2" IRON PINS WERE SET AT ALL LOT CORNERS 2. ALL EASEMENTS SHOWN - _ ARE TO BE USED FOR DRAINAGE AND/OR UTILITIES. 3. LOTS WITH ROUNDED CORNERS ARE MEASURED TO A POINT OF INTERSECTION OF LOT LINES AND NOT POINTS ON A CURVE. 4. DISTANCES SHOWN ALONG CURVES ARE CHORD DISTANCES. 5. RADII AT INTERSECTIONS OF STREET RIGHTS OF WAY ARE 25' 6. ERROR OF CLOSURE: 1:15,914 7. BEARINGS ARE BASED ON ARKANSAS STATE cOORGINATE SYSTEM (NORTH ZONE) ���JI�E' �(J11�,T � '�' AN ADDITION TO THE CITY OF LITTLE ROCK, ARKANSAS wu_ y�M Rook y, 221 E. C DIV wiR pP 4 I r 6�1IE3 k, Ar 72202 �J NO ADDITIONAL EASEMENTS REQUIRED O ADDITIONAL 'BASEMENTS ARE REQUIRED AS SHD N .BY 'DATES—. fi L_ 0 BEING A REPLAT OF LOTS 1R-6R AND TRACT 'B' BELL P❑INTE AND LOTS 35-38 PLEASANT HEIGHTS PHASE 1 AND 2, ADDITIONS TO THE CITY OF LITTLE POCK, ARKANSAS APPROVEDARKLA EASEMENT EASEMENT It DATE 5-Z�-Z i-' C� © VV 11L11 LL !l' _z)A!1 IG101E a tl1L]1e90)VMA 11 FZl H 0o CIVIL ENGINEERING, LAND PLANNING & DEVELOPMENT, SURVEYING 401 VICTORY STREET LITTLE ROCK, ARKANSAS 72201 Job No 96-0159