HomeMy WebLinkAboutS-0827 Staff Analysis1. .Name: The Summit "Long -Form" PCD (Z-4923)
2. Location: West side of Shackleford Road, between I-430
and West 36th
3. Developer: Austin Development Company
4. Engineer: Lawrence Beame - Kober/Bellashi Associates/
Manes, Castin, Massie, and McGetrick
5. Existing Zoning: 110-2"/"R-2"
6. Pro osed Use: Mixed Use, Retail, Hotel and Office
Development
7. Staff Recommendation: Approval, subject to agreement
made.
8. Planning Commission Action: A lengthy discussion was
held. A numk)er of persons from neighborhood expressed
concern. A motion was made and passed for approval,
subject to the attached letters. The vote: 8 ayes,
1 no, 1 absent, 1 abstention.
ITEM NO. 12 - THE SUMMIT PCD
FINAL STAFF RECOMMENDATION:
After much review and discussion of the Summit PCD project, the staff
recommends approval of the rezoning.
The staff has had numerous meetings with the developers since the
Subdivision Committee meeting and have finalized the City staff's
requirements for the project. Their approval recommendation includes
the developer's commitments outlined in the attached letters from
Ron Mastriana dated October 23, 1987, November 2, 1987 and November 3,
1987.
g
,Y
NAME:
LOCATION:
nFVFT.0PRR
Austin Dev. Co.
2 216 43 rd
Meridian, MS 39305
Phone: 601-693-2703
AREA: 97.446 acres
The Summit "Long -Form PCD"
(Z-4923)
West Side of Shackleford Road
Between I-430 and West 36th
RWaTNRRR:
Lawrence Beame
Kober/Bellaschi Assoc.
353 Alcazar Avenue
Coral Gables, FL 33134
ZONING: 110-2" PROPOSED USE: PCD
A. Developmental Conce Pt
FT. NEW STREET: 0
This submittal describes plans for a mixed use
development of office, hotel, and retail to be located
on 97.446 acres at the intersection of Shackleford Road
and I-430. A two -level retail galleria in the center
of the highest level will Yee the focal point; and glass
enclosed entrances will provide a welcome atmosphere.
The developer has listed several major design features
and plan components which will include:
(1) Internalized ring road.
(2) Two phased project with off -site improvements to
io be constructed in Phase I. Site grading
accomplished during initial phase so that building
construction during the second phase will require
minimal disruption.
(3) Only four points of access to Shackleford in the
3,000 linear feet of spacing, whereas the City
regulations allow for ten.
(4) Cut and fill has been minimized.
N
Z-4923 -.Continued
(5) Perimeter Open Space
Treatment of landscaped areas and natural buffer
areas ranging in width from 50' to 1001. A true
survey has been done to reflect the number and
location of large species of trees to be
retained.
(6) Intense landscaping of open space and parking in
excess of City requirements.
(7) Pedestrian connections between major use ares
within the site and covered walkways and bridges
to facilitate encouraging pedestrian movement.
(8) Preservation of an approximate two acre lake as a
focal point for major office development and will
serve as primary detention facility.
(9) Improvements include reconstruction of. Shackleford
Road to a five -lane section of installation of
five traffic signals - cost in excess of
$1 million.
(10) Less traffic inpact than an office development
since it is spread out' over more hours of the day.
B. Quantitative Data
Gross Acreage 97.446 acres
Right -of -Way Dedication 2.016 acres
Net Acreage 95.430 acres
Use
Office
Retail
Hotel
(250 room)
Restaurant
Area Levels Parking
111,667 6
111,667 6
111,667 6
335,000 sq. ft. 6 840
975,000 sq. ft. 6 4,625
190,000 sq. ft. 10 (type) 280
20,000 sq. ft.
1,470,000
1
1 200
2 5,945
r
= Z-4923 - Continued
n
C. Engineering Comments
Will discuss at meeting.
D. Staff Recommendation
Reserved until further information provided. The main
issue involves land use and amendment of the I-430
1 plan. Other issues involve phasing of traffic and
excavation and grading.
Staff, therefore, feels that a mixed used development
is compatible with the surrounding area versus the
straight commercial development. The proposal
represents a reasonable use of property at this highway
interchange with very little long-term exposure to
residential uses. The plan also includes extensive
landscaping and buffering along the highway. The
sit-down restaurants are not as conducive to strip
commercial as the previously proposed fast food
restaurants.
The report on the traffic information submitted is
needed from Engineering. Staff does feel that the
extent of excavations and fills seems excessive. The
applicant should add terracing of the parking areas.
E. Subdivision Committee Review
1 The applicant was present. Staff reported that. a
letter had been reviewed from Aldersgate requesting
deferral until they had further time to study the
situation._ The engineer, Pat McGetrick, stated that
they were working to develop ponds to minimize runoff
to Aldersgate.
Staff felt that the plan indicated excessive grading
and that more terracing should be provided.
NAME:
LOCATION:
DEVELOPER:
Austin Dev. Co.
2216 43rd
Meridian, MS 39305
Phone: 601-693-2703
AREA: 97.446 acres
The Summit "Long -Form PCD"
(Z-4923)
West Side of Shackleford Road
Between I-430 and West 36th
ENGINEER:
Lawrence Beame
Kober/Bellaschi Assoc.
353 Alcazar Avenue
Coral Gables, FL 33134
ZONING: "0-2" PROPOSED USE: PCD
A. Developmental Concept
FT. NEW STREET: 0
This submittal describes plans for a mixed use
development of office, hotel, and retail to be located
on 97.446 acres at the intersection of Shackleford Road
and I-430. A two -level retail galleria in the center
of the highest level will be the focal point; and glass
enclosed entrances will provide a welcome atmosphere.
The developer has listed several major design features
and plan components which will include:
(1) Internalized ring road.
(2) Two phased project with off -site improvements to
be constructed in Phase I. Site grading
accomplished during initial phase so that building
construction during the second phase will require
minimal disruption.
(3) Only four points of access to Shackleford in the
3,000 linear feet of spacing, whereas the City
regulations allow for ten.
(4) Cut and fill has been minimized.
Z-4923 - Continued
(5) Perimeter Open Space
Treatment of landscaped areas and natural buffer
areas ranging in width from 50' to 100'. A true
survey has been done to reflect the number and
location of large species of trees to be
retained.
(6) Intense landscaping of open space and parking in
excess of City requirements.
(7) Pedestrian connections between major use ares
within the site and covered walkways and bridges
to facilitate encouraging pedestrian movement.
(8) Preservation of an approximate two acre lake as a
focal point for major office development and will
serve as primary detention facility.
(9) Improvements include reconstruction of Shackleford
Road to a five -lane section of installation of
five traffic signals - cost in excess of
$1 million.
(10) Less traffic inpact than an office development
since it is spread out over more hours of the day.
B. Quantitative Data
Gross Acreage 97.446 acres
Right -of -Way Dedication 2.016 acres
Net Acreage 95.430 acres
Use
Office
Retail
Hotel
(250 room)
Restaurant
Area Levels Parking
111,667 6
111,667 6
111,667 6
335,000 sq. ft. 6 840
975,000 sq. ft. 6 4,625
190,000 sq. ft. 10 (type) 280
20,000 sq. ft.
1,470,000
1
1 200
2 5,945
Z-4923 -- Continued
C. Engineering Comments
Will discuss at meeting.
D. Staff Recommendation
Reserved until further information provided. The main
issue involves land use and amendment of the I-430
plan. Other issues involve phasing of traffic and
excavation and grading.
Staff, therefore, feels that a mixed used development
is compatible with the surrounding area versus the
straight commercial development. The proposal
represents a reasonable use of property at this highway
interchange with very little long-term exposure to
residential uses. The plan also includes extensive
landscaping and buffering along the highway. The
sit-down restaurants are not as conducive to strip
commercial as the previously proposed fast food
restaurants.
The report on the traffic information submitted is
needed from Engineering. Staff does feel that the
extent of excavations and fills seems excessive. The
applicant should add terracing of the parking areas.
E. Subdivision Committee Review
The applicant was present. Staff reported that a
letter had been reviewed from Aldersgate requesting
deferral until they had further time to study the
situation. The engineer, Pat McGetrick, stated that
they were working to develop ponds to minimize runoff
to Aldersgate.
Staff felt that the plan indicated excessive grading
and that more terracing should be provided.
1. Name: The Summit "Long -Form" PCD (Z-4923)
2. Location: West side of Shackleford Road, between I-430
and West 36th
3. Developer: Austin Development Company
4. Engineer: Lawrence Beame - Kober/Bellashi Associates/
Manes, Castin, Massie, and McGetrick
5. Existing Zoning: "O-2"/"R-2"
6. Proposed Use: Mixed Use, Retail, Hotel and Office
Development
7. Staff Recommendation: Approval, subject to agreement
made.
B. Planning Commission Action: A lengthy discussion was
held. A number of persons from neighborhood expressed
concern. A motion was made and passed for approval,
subject to the attached letters. The vote: 8 ayes,
1 no, 1 absent, 1 abstention.
NAME:
LOCATION:
DEVELOPER:
Austin Dev. Co.
2216 43rd
Meridian, MS 39305
Phone: 601-693-2703
AREA: 97.446 acres
The Summit "Long -Form PCD"
(Z-4923)
West Side of Shackleford Road
Between I-430 and West 36th
ENGINEER:
Lawrence Beame
Kober/Bellaschi Assoc.
353 Alcazar Avenue
Coral Gables, FL 33134
ZONING: "0-2" PROPOSED USE: PCD
A. Developmental Concept
FT. NEW STREET: 0
This submittal describes plans for a mixed use
development of office, hotel, and retail to be located
on 97.446 acres at the intersection of Shackleford Road
and I-430. A two -level retail galleria in the center
of the highest level will be the focal point; and glass
enclosed entrances will provide a welcome atmosphere.
The developer has listed several major design features
and plan components which will include:
(1) Internalized ring road.
(2) Two phased project with off -site improvements to
be constructed in Phase I. Site qrading
accomplished during initial phase so that building
construction during the second phase will require
minimal disruption.
(3) Only four points of access to Shackleford in the
3,000 linear feet of spacing, whereas the City
regulations allow for ten.
(4) Cut and fill has been minimized.
Z-4923 - Continued
(5) Perimeter Open Space
Treatment of landscaped areas and natural buffer
areas ranging in width from 50' to 1001. A true
survey has been done to reflect the number and
location of large species of trees to be
retained.
(6) Intense landscaping of open space and parking in
excess of City requirements.
(7) Pedestrian connections between major use ares
within the site and covered walkways and bridges
to facilitate encouraging pedestrian movement.
(8) Preservation of an approximate two acre lake as a
focal point for major office development and will
serve as primary detention facility.
(9) Improvements include reconstruction of Shackleford
Road to a five -lane section of installation of
five traffic signals - cost in excess of
$1 million.
(10) Less traffic inpact than an office development
since it is spread out over more hours of the day.
B. Quantitative Data
Gross Acreage 97.446 acres
Right -of -Way Dedication 2.016 acres
Net Acreage 95.430 acres
Use
Office
Retail
Hotel
(250 room)
Restaurant
Area Levels Parking
111,667 6
111,667 6
111,667 6
335,000 sq. ft. 6 840
975,000 sq. ft. 6 4,625
190,000 sq. ft. 10 (type) 280
20,000 sq. ft.
-,z.-,......
1
1 200
2 5,945
Z-.4923 - Continued
C. Engineering Comments
Will discuss at meeting.
D. Staff Recommendation
Reserved until further information provided. The main
issue involves land use and amendment of the I-430
plan. Other issues involve phasing of traffic and
excavation and grading.
Staff, therefore, feels that a mixed used development
is compatible with the surrounding area versus the
straight commercial development. The proposal
represents a reasonable use of property at this highway
interchange with very little long-term exposure to
residential uses. The plan also includes extensive
landscaping and buffering along the highway. The
sit-down restaurants are not as conducive to strip
commercial as the previously proposed fast food
restaurants.
The report on the traffic information submitted is
needed from Engineering. Staff does feel that the
extent of excavations and fills seems excessive. The
applicant should add terracing of the parking areas.
E. Subdivision Committee Review
The applicant was present. Staff reported that a
letter had been reviewed from Aldersgate requesting
deferral until they had further time to study the
situation. The engineer, Pat McGetrick, stated that
they were working to develop ponds to minimize runoff
to Aldersgate.
Staff felt that the plan indicated excessive grading
and that more terracing should be provided.
ITEM NO. 12 - THE SUMMIT PCD
FINAL STAFF RECOMMENDATION:
After much review and discussion of the Summit PCD project, the staff
recommends approval of the rezoning.
The staff has had numerous meetings with the developers since the
Subdivision Committee meeting and have finalized the City staff's
requirements for the project. Their approval recommendation includes
the developer's commitments outlined in the attached letters from
Ron Mastriana dated October 23, 1987, November 2, 1987 and November 3,
1987.
ITEM NO. 12 - THE SUMMIT PCD
FINAL STAFF RECOMMENDATION:
After much review and discussion of the Summit PCD project, the staff
recommends approval of the rezoning.
The staff has had numerous meetings with the developers since the
Subdivision Committee meeting and have finalized the City staff's
requirements for the project. Their approval recommendation includes
the developer's commitments outlined in the attached letters from
Ron Mastriana dated October 23, 1987, November 2, 1987 and November 3,
1987.