Loading...
HomeMy WebLinkAboutS-0813-E Application11/04/2005 @2;18.09 ph Filed & Recorded ir, Official R-cords of PAT 01 ARi;_N PULASKI COUNTY � ' ; ' '• f • �':?' CIRCU! i/COUNTY CLERK Fees U4i r � ,u� iris • `9[. s' i � _ `�S► �.�'`�''* t BILL OF ASSURANCE a�lAaK� . KNOW ALL MEN BY THESE PRESENTS: THAT WHEREAS, Winrock Development Company, hereinafter called "Grantor", is the owner of the following described property: Lots 8-9-10-11-12-13-38-39-40-41-42-43-44-45-48-50-51 — 52 & 53 Springtree Village, an addition to the City of Little Rock, Arkansas Recorded as plat #C-579 in the records of the Circuit County Clerk of Pulaski County, Arkansas AND WHEREAS, it is deemed advisable to rplat the above -described property. NOW, THEREFORE, the Grantor has caused the land to be surveyed by McGetrick Engineering, Inc., Engineers and Surveyors, and a plat made thereof, identified by the title "Lots 8R, 10R I IR 12R 38R 40R 42R 45R 46R 49R 51R 53R Springtree Village Subdivision A Replat of Lots 8-13 and Lots 38-53 of Springtree Village an addition to the city of Little Rock, Arkansas". The plat bears the signatures and seals of Patrick M. McGetrick, Registered Professional Engineer, Robert C. Lowe, Jr., Registered Professional Land Surveyor, the signature of the Grantor, bears a Certificate of Approval executed by the Little Rock Planning Commission, and is filed for record as Plat # d - i � in the Records of the Circuit County Clerk of Pulaski County, Arkansas. The filing of the plat for record shall constitute a complete and valid delivery of any and all easements anal/or rights -of way shown on the Plat. The lands embraced in the plat shall be forever known as "Lots 8I;t 40R 42R 45R 46R 49R 5 1 R 53R Springtree Village Subdivision A Replat c 38-53 of Springtree Village an addition to the city of Little Rock, Arkansas conveyance shall bear the lot designations as indicated on the plat. No house shall be built on any lot in this subdivision with a minirru 100 SF heated and cooled space. All Building Codes and Zoning Ordinances of the City of Little Rocl�zz WITNESS the signature of the Grantor this 2-242 day of O APPROVED: LITTLE ROCK PLANNING COMMISSION p rr fievi.s-11'XI C•'Iy fw� re[sCne�11> dF]V$1C�"r City c Lithe Rccic Planninq ,,amrr�issian GRANTOR Winrock Development Comparm Signature Printed Name 4 ACKNOWLEDGMENT STATE OF ARKANSAS) COUNTY OF 1 ) BE IT REMEMBERED, that on this date came before me, a Notary Public, duly commissioned and acting for the State and County, aforesaid ��► e .f L and stated that as an official of Winrock Development Company, Grantor in the foregoing Bill of Assurance, was authorized to and had executed the same for the purposes set forth therein. 3/2z12o(0 My Commission Expires Notary Public "OFFICIAL SEAL" Rachel S. Menzies Notary Public, State of Arkansas - County of Grant My Commission Exp. 03/22/2010 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAMRSPRINGTREE VILLAGE SUB. LOTS 8R,10R,11 R,12R,38R,40R,42R,45R,46R,49R,51R,53R INSPECTOR REPORT I have made a final inspection of the improvements and find that: V/All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements main uncompleted and a punch list has been prepared and sent. Engineering list Date:. ADDRESSIN SPECIALIST'S REPORT I� I have reviewed the plfin�at the si et nwnes and street configuration are acceptable. I�tdd Addressing Specialist Date: `7 ZZ TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. el�fr�1 Ale -Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for bill' - to developer: C rt n improvements remain uncompleted and a punch list has been prepared and sent. `t- Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. Civil Engineer I/II Date: SURVEYOR'S REPORT I Jhave reviewed the plat and find that: All re u' for lat approval have been satisfied. Surveyor Date: I% d r— MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. July 2005