Loading...
HomeMy WebLinkAboutS-0810 Map 2\ �I 7- '& 4 i Fao�% F—Tr7 ' PlE 50' Ri W z�61 l ADDLE 1 - Gaffs 4'8/, 988,9�9 JJz:rc� F?rrr, �isir. 3.Oat P AR1►ASSAf .,« :tZf1STIRED e40FE$510MAL EYGIREL9 z ?9 No-4027, 4;`5 ,,,,tttt Ulrl rrrY/I,I •, T ,'' 926 0.•� '�. A (. L Apt. •'• ��'r�rnnnttt►t` CLRTLFICATL OF PNELIMINARY SURVKYING ACCURACY 1, Robert J. Richardson hereby certify that this plat correctly represents a boundary survey made by me and all mounts shorn hereon actually exist and their location, size, type and material are cerrectly shorn. qp _ Date of Execution Hobert J. Pch rdson Registered Professional Land Surveyor, No. 928 Arkansas CERTIFICATE OF PRELLKINARY ENGINEERING ACCURACY I, Robert J. Richardson hereby certify that this plat correctly represents a plat made by me, and that engineering requirements of the Little Rork Subdivision Rules and Regulations have been complied with. Signed Date of Executfun Robert J. Ric ardson Registered Professional Engineer, No. 4027 Arkansas CERTIFICATE OF PRELIMIRARY PUT APPROVAL All requirements of the Little Rock Subdivision Rules and Regulations relative to the preparation and submittal of a Preliminary Plat having been fulfilled, approval of this plat is hereby granted, subject to further provisions of said Rules and Regulations. This Certificate - ahall expire Date Signed Date of Execuation SoArrele k If me DeeJi3� /078, p,�., 3�3 3tt Little Pock Planning Commission 4r+nti Su�dnwdr N%ary/tl�dSc fir f Fisn� cow 11/9/87 13-eparet( By Rob�i! rl Rtia�rdser• /7/7 R�bs..e••, i3r�E ,Fd. L,7l�e' i1o�� Ai. 7Z20? e5ol) 6 Gt• 0009