HomeMy WebLinkAboutS-0810 Map 2\ �I
7- '&
4
i
Fao�% F—Tr7 ' PlE 50' Ri W
z�61
l
ADDLE
1 -
Gaffs 4'8/, 988,9�9
JJz:rc� F?rrr, �isir.
3.Oat
P
AR1►ASSAf
.,«
:tZf1STIRED
e40FE$510MAL
EYGIREL9 z
?9 No-4027, 4;`5
,,,,tttt Ulrl rrrY/I,I
•, T ,''
926
0.•�
'�. A (. L Apt. •'•
��'r�rnnnttt►t`
CLRTLFICATL OF PNELIMINARY SURVKYING ACCURACY
1, Robert J. Richardson hereby certify that this plat correctly
represents a boundary survey made by me and all mounts shorn hereon
actually exist and their location, size, type and material are
cerrectly shorn. qp _
Date of Execution Hobert J. Pch rdson
Registered Professional Land Surveyor,
No. 928 Arkansas
CERTIFICATE OF PRELLKINARY ENGINEERING ACCURACY
I, Robert J. Richardson hereby certify that this plat correctly
represents a plat made by me, and that engineering requirements of
the Little Rork Subdivision Rules and Regulations have been complied
with. Signed
Date of Executfun Robert J. Ric ardson
Registered Professional Engineer, No. 4027
Arkansas
CERTIFICATE OF PRELIMIRARY PUT APPROVAL
All requirements of the Little Rock Subdivision Rules and Regulations
relative to the preparation and submittal of a Preliminary Plat having
been fulfilled, approval of this plat is hereby granted, subject to
further provisions of said Rules and Regulations. This Certificate -
ahall expire
Date Signed
Date of Execuation
SoArrele k If me
DeeJi3� /078, p,�., 3�3 3tt
Little Pock Planning Commission
4r+nti Su�dnwdr
N%ary/tl�dSc fir f Fisn� cow
11/9/87
13-eparet( By
Rob�i! rl Rtia�rdser•
/7/7 R�bs..e••, i3r�E ,Fd.
L,7l�e' i1o�� Ai. 7Z20?
e5ol) 6 Gt• 0009