Loading...
HomeMy WebLinkAboutS-0805 Map 4FILL GROOVES WITH SEALANT,(6'PAVEMENT ONLY) 1/2 NON EXTRUDING DITUMINOUS I/SA WIDE GROOVE JOINT FILLER WITH ASPHALTIC (TOOLED OR SAWED) T/ SEALANT.! PCURED) ._ T . , r 6 FOR PAVEMENTS t FOR SIDEWALKS 3AN'6 SMOOTH BAR DOWELS 124" W Zt CENTERS, SLEEVE ONE i s i s c/b W- K F IN 6 *PAVEMENTS ONLY END ''#"TH FELT WRAP(APPLIES FOR 6'PAVEMENTS ONLY COMTRACTION Jorw CONSTRUCTION JOINT EXPANSION JOINT " C.J." - E. J... NOTES I • FOR WALK CONSTRUCTION, SPACE JOINTS AT WALK WIDTH TO 8' 2- FOR WALKS L AND WIDER SPACE JOINTS AT '/2 WALK WIDTH AND USE 4 JOINT ENTIRE L64GTH OF WALK. 3-FOR PA%7iMENT CONSTRUCTION, SEE PLAN FOR JOINTING t- SPACE E J s FOR WALKS AT ALL ABUTTING CONSTRUCTION, AT CORNER, RETUR' i, AND AT EVERY 0 In. C.-- 1 \ CONCRETE JOINT DETAIL SAW CUT EXISTING PAVEMENT FULL DEPTH TUMINous \ M TACK COAT,- Elnll f N0 ASGREGATE SASE COURSE TO BE PROTECTED AND REMAIN UNDISTURBED TO PREVENT LOSS OF DENSITY AND SUP UNDER EXISTING SITUMINOU PAVEMENT NEW 20 BITUMINOUS SURFACE COURSE 1—PRIME COAT S �( NEW 0.4SE COURSE BASE 1;1 ASPHALT PAVEMENT JUNCTURE CURS S, GUTTER NOTES -- I.- SPACE CONTRACTION JOINTS a 10 FT AND AT RADIUS RETURNS SPACE EXPANSION JOINTS EVERY IOTH. CONTRACYION JOINT. IvzaR. MIN' SLOPE NORMAL TYP ROSS SLOPE• '„. X. SLOPE: I PER FT. BfTUNINOus TACK COAT ' YP iWN SLOPE r IL n si:NLESS SHOWN OTHERWISE - SEE SITE GRADING 9 DRAINAGE PLAN NEW CURB 8 GUTTER DETAIL �/2"BATTER 3x• CHUM• FL SLOPE FL SLOPE PMMED GRADE v �' :, .•. s ' 1p p SSE-D�FOR Fi�NcIc.�P RI.MD d /21TURN DOWN WALK DETAIL NOTES I. DRAINAGE BED SHALL CONSIST Of CRUSHED STONE OR COURSE GRAVEL WITH COURSE SAND. MINIMUM VOLUME 2 CUBIC YARDS B EXTENDING A MINIMUM OF 61NCHES ABOVE DRAIN OUTLET 2. USE 60M.J. RETAINER GLANDS ON ALL JOINTS. 3 ALL HYDRANTS TO BE BLOCKED AS SHOWN. 4 ALL HYDRANTS SHALL BE INSTALLED PLUMB. t— FACE OF CURS oR CENTER STRIPE o IZ' rt WM : SYMBOL TO 9E PAINTED WITH WHITE NON- REFLECTIVE TRAFFIC PAINT 4 \ HANDICAP PARKING SYMBOL 30ASPHALT CONCRETE NOT MIX / SURFACE COURSE PRIME COAT D"CRUS►+ED STONE CASE COURSE (SS•/. MODIFIED PROCTOR DENSITY) d MIN. COMPACT EXISTING sUSGRAOE �. I % STANDARD DENSITY AST D-61S) NOTE WHERE FILL 13 TO BE PLACED ON EXISTING SUSGRAOE, FULL DEPTH COMPACTION OF SELECT MATERIAL IS REOUIINW ( SEE EARTHWORK SECTION OF SPECS.) /T1 ASPHALT PAVEMENT SECTION TOTALS 0oMHLtt.1ITY �_4-P61 7,t-00%•F P441 k IJei Z7�f E� L �a•�r✓I cdl'oEa P6.IW�i.1 G-i S sl'�ES i 4ktA.tr C1 c.,�R� SITE PLAN N I EXISTING PARKING __ �27 SP1�C ES • � 4'! 8 s 10 95 3a " 5 (U k-Iz s+ N :fib J f; �.71.OI 1�i-Ciu 'C-C' 4i(-'1 �-✓ cC` q5.3 i LIe•.E 1 -fp �I.f G /ti I j a55Z ; �2rf i 9'S.oA '15.1S#►.7J 5'a P RI9NM q 4..eZ i�« A41 jvF#16► I Apt. ?4.fo7 paw."e vn# Al L4►It..APdo% PROPOSED" FIRE STATION DRIVE 6,,,�8 SPAC _ �. _. C.uwlld Q� "'�FtI.0 - Is"a + r �5.0♦ 9�i.1 91 �- 45?S toe. ;? �,�,� � L � � New �.oc♦1?a� fit, but, a t�+ts aa,,b o BCE �i.►ou'(Ev, r- '�` t'ID Mr I UN "/ `1(. 29-1i Qy, REVISIONS . fSY S Z z cc 0 IrIL go M < J Z Q Q aYc p < NJ W Z42 = TTI m i 0 I,'. U low W �e W W 3 J CO) d Scam Jas 1� Shook 3 Of ! slow. M a M wwwft a a•. ww•• waww .