Loading...
HomeMy WebLinkAboutS-0805 Map 1REVISIONS BY • FILL GROOVES WITH SEALANT,WPAVEMENT ONLY) 1/2'NON EXTRUDING GITUMINOUS 1191% GROOVE JOINT FILLER WITII ASPHALTIC T/4 (TOOLED OR SAWED) T1 $EALANT.(PGURED) •" T 6 FOR PAVEMENTS FOR SIDE WAIJ(S 3N •! SMOOTH BAR, DOWELS s 2+' o124 CENTERS, SLEEVE ONE S t i D/b W. W. F IN 6•Ps1VEMENTS ONLY ENO 'MTH FELT WRAP (APPLIES FOR 6 PAVEMENTS ONLY CONTRACTION JOMW CONSTRUCTION JOINT EXPANSION JOINT ,. C. J... - E. J.,. NOTES I . FOR WALK CONSTRUCTION, SPACE JOINTS AT WALK WIDTH TO 8' 2- FOR WAU(3 u AND WIDER SPACE JOINTS AT :/2 WALK WIDTH AND USE C C.JOINT ENTIRE LkNGTH OF WALK. 3-FOR PAVEMENT CONSTRUCTION, SEE PLAN FOR JOINTING. 4• SPACE E J s FOR WALKS AT ALL ABUTTING CONSTRUCTION, AT CORNER, �-RETUR. S, AND AT EVERY IO In. C.:. / 1 � \ CONCRETE JOINT DETAIL SHIN CUT EXISTING PAVEMENT FULL DEPTH BITUMINOUS \ TACK COAT, EXISTING AGGREGATE BASE COURSE TO BE NEW 2' BITUMINOUS SURFACE COURSE !—PRIME COAT G I NEW RASE COURSE PROTECTED AND REMAIN / ~EXCAVATE BASE 14 UNDISTURBED TO PREVENT' LOSS OF DENSITY AND SUPPORT UNDER EXISTING BITUMINOUS PAVEMENT l 3 1 ASPHALT PAVEMENT JUNCTURE r..l' IRE a GUTTER — NOTES, I— SPACE CONTRACTION JOINTS a'I 10 FT AND AT RADIUS + RETURNS SPACE EXPANSION JOINTS EVERY IOTM. CONTRACTION JOINT. VZOR• M N' SLOPE NORAL TYP MIBOSS SLOPk MAX. SLOPE: I PER FT 7 ' • n BITUM$WUS TAM COAT TYP •. • ,. �• /'• :/ Fit .� d. SOWN SLOPE 70 IL n OCNLESS SHOWN OTHE�WISE- SEE SITE GRADING 9 DRAIMAGS PI, -AM NEW CURB 8 GUTTER DETAIL nd 3M" CHAW I I W FT SLOPE FINISHED i �• ' r. ►•;.-.t::.:. GRADE :�:' .' `;� ,+ •; y: ;•. t OILjo'.- 0-* 1 ' K DEPRESSES R FM�N D KAP Ri�t�l G � nTURN DOWN WALK DETAIL NOTES: I. DRAINAGE BED SHALL CONSIST OF CRUSHED STONE OR COURSE GRAVEL WITH COURSE SAND. MINIMUM VOLUME 2 CUBIC YARDS 6 EXTENDING A MINIMUM OF 6 INCHES ABOVE DRAIN OUTLET 2- USE 6"M.J. RETAINER GLANDS ON ALL JOINTS. 3 ALL HYDRANTS TO BE BLOCKED AS SHOWN. 4 ALL HYDRANTS SHALL BE INSTALLED PLUMB, 0 FACE OF CUM OR CENTER STRIPE %.l t �t �.. 0 . WOtE :SYMBOL TO BE PAINTED , r � • WITH WHITE NON- y REFLECTIVE TRAFFIC PAINT few"" 4� HANDICAP PARKING SYMBOL 30ASPHALT CONCRETE NOT MIX / SURFACE COURSE -i- PRIME COAT 0•CRUSHED STONE CASE COURSE (95% MODIFIED PROCTOR DENSITY) If MIN. COMPACT EXISTING SUBGRAOE (98 % STANDARD DENSITY ASTM D-sM) LINE WPKIM FILL IS TO BE PLACED ON EXISTING SUMMADE, FULL DEPTH COMPACTION OF SELECT MATERIAL IS REpUIREp ( KE EARTHWORK SECTION OF SPECS.) 6 ASPHALT PAVEMENT SECTION TOTALS G oHHLjQ T-( I'-4-P61 7,U10 4v• F�-I.ItJci t7sf�`> L ubNpl at�l''P FI(� STd"ilo�1 3,a� s•F SITE PLAN (/ I N serf Llr� C •• / PARKING /27/SP `C E �GY1GG x J PLAYGROUND 9g 1) 0 •.a I .I I9Sh3 O � N IILl _ -10 r9�i,�! big I LAO,b I -?`C fv oc. '24 I g45Z ~• Club" �,ry ry H. G1Y. • INA + 9S.o4 ya P RI ING� P RO PO SEA` + ? �1 I ' q4..�Z ) , FIRE STATION r n. DRIVE � °I•f.!'4� — 9S.)`� MI5 � ; • 8 PI�C Elll / r ,. ti a+ i 4p' e f '+�ON I � ubM�toN �r s z �a Q ` A IL Z .J i UJ < Ic MA Q Q LU AIL W W >- M om I- o = m _ OIIIIIN Aj mi 3 �t W t» cc AL S"* Dra" J� 1� s� 3 Of 41 � Mum OWAIMM�VIIMIGMh�.