HomeMy WebLinkAboutS-0769 Staff AnalysisOctober 15, 1985
SUBDIVISIONS
Item No. 4 - File No.
NAME: Garden Plaza Hotel, "PCD"
(Z-4485)
LOCATION: Financial Center Parkway
nWNTWT nDVD . RM(_TWRRI? •
Cooper Hotel Group Sid Hankins
1407 Union Avenue 5616 Compton Pike
Memphis, TN Knoxville, TN 37917
(901) 725-9631
Area: 4.5 acres No. of Lots: 1 Ft. New St.:
ZONING: "C-3" and "0-3" tol"PCD"
PROPOSED USES: Luxury Hotel
PLANNING DISTRICT:
CENSUS TRACT:
VARIANCES REQUESTED:
1. Height.
2. Buffer area.
A. Site Histor
There is an existing 50-foot platted buffer on the
northern portion of the property.
B. Development Objectives
1. To provide a high quality hotel to serve the
rapidly developing office park.
2. To match the high quality already exhibited in
Financial Centres One, Two and Three.
C. Development Proposal
1. The construction of a 6 story, 200 room luxury
hotel on 4.5 acres.
2. Other uses include a full service restaurant, bar
and meeting rooms within the hotel.
October 15, 1985
SUBDIVISIONS
Item No. 4 - Continued
3. Parking will consist of approximately 250 spaces.
4. Landscaping will be lush with the structure to be
located as far away as possible from the abutting
neighborhood.
5. Construction could begin as early as March 1986
with a build out period of approximately 18
months.
6. This involves the replatting of several lots.
D. Engineering Comments
None at this time. 10
E. Analysis
Staff was very inhibited in its review of the project
due to inadequate submission. From the pre -preliminary
conference, staff recalls that several issues to be
discussed relate to the building height, encroachment
into the 50' buffer area and/or inadequate parking if
there is no encroachment.
F. Staff Recommendation
Staff reserves comment until further information is
received.
G. Subdivision Committee Review
The applicant was present. He submitted additional
information and agreed to cooperate with the staff in
submitting added materials before the public hearing
and see that the item was reviewed by the appropriate
agencies. He explained that plans were for a
five -story hotel of 471.
PLANNING COMMISSION ACTION:
The applicant, Mr. Steve Barnes, and the architect were
present. Four concerned property owners from the Birchwood
Subdivision were present.
The applicant proposed a berm in addition to the existing
vegetation as a buffer from abutting property owners. A
October 15, 1985
SUBDIVISIONS
Item No. 4 - Continued
deferral of the proposal was requested by Mr. James Johnston
whose residence abuts the project. He felt it was needed so
that other residents in Birchwood could be notified. The
applicant objected to this, since he felt that he had given
adequate notice to persons within 200' and sent letters to
the neighborhood. Mr. Johnston expressed concerns about the
landscaping, lighted parking lot, lighted sign on top of the
hotel and whether or not the proposal adequately expressed
what was to be built. Mr. Van Nicholson expressed a fear of
devaluation of property values, increased traffic, crime and
increased sewer problems.
A discussion was held on the proposed height of the building
and the roof sign shown in a photograph of the hotel, which
indicated that the total structure was 62' high. The
applicant agreed to work within the Sign Ordinance and
provide a structure of 431. Finally, a motion was made for
approval subject to the plans including a sight -proof fence
in addition to the berm, unless the applicant submits a
written agreement between the applicant and two adjacent
property owners that provides some agreement stating that a
fence be built intially or not at all within the time frame
of six months and staff recommendation. The vote was
unanimous: 11 ayes, 0 noes and 0 absent.
October 15, 1985
SUBDIVISIONS
Item No. 4 - File No.
NAME: Garden Plaza Hotel, "PCDa
(Z-4485)
LOCATION: Financial Center Parkway
T1�`TT�'T_f1D�'D . L'TT/�TT.TLOD
Cooper Hotel Group Sid Hankins
1407 Union Avenue 5616 Compton Pike
Memphis, TN Knoxville, TN 37917
(901) 725-9631
Area: 4.5 acres No. of Lots: 1
ZONING: "C-3" and "0-3" too#"PCDa
PROPOSED USES: Luxury Hotel
DT_A'hMTMn nTCTDTrM.
Ft. New St.:
R
:a
CENSUS TRACT:
3
rt
VARIANCES REQUESTED:
1.
Height.
'r
2.
Buffer area.
z
A.
Site History
There is an existing 50-foot platted buffer on the
northern portion of the property.
i
B.
Development Objectives
3
'
I- To -provide a high quality hotel to serve the
rapidly developing office park.
2. To match the high quality already exhibited in
Financial Centres One, Two and Three.
C.
Development Proposal
•
1. The construction of a 6 story, 200 room luxury
hotel on 4.5 acres.
2. Other uses include a full service restaurant, bar
and meeting rooms within the hotel.
October 15, 1985
SUBDIVISIONS
Item No. 4 - Continued
3. Parking will consist of approximately 250 spaces.
4. Landscaping will be lush with the structure to be
located as far away as possible from the abutting
neighborhood.
5. Construction could begin as early as March 1986
with a build out period of approximately 18
months.
6. This involves the replatting of several lots.
D. Engineering Comments
None at this time. ' ,
E. Analysis
Staff was very inhibited in its review of the project
due to inadequate submission. From the pre -preliminary
conference, staff recalls that several issues to be
discussed relate to the building height, encroachment
into the 50' buffer area and/or inadequate parking if
there is no encroachment.
F. Staff Recommendation
Staff reserves comment until further information is
received.
G. Subdivision Committee Review
The applicant was present. He submitted additional
information and agreed to cooperate with the staff in
submitting added materials before the public hearing
and see that the item was reviewed by the appropriate
agencies. He explained that plans were for a
five -story hotel of 471.
PLANNING COMMISSION ACTION:
The applicant, Mr. Steve Barnes, and the architect were
present. Four concerned property owners from the Birchwood
Subdivision were present.
The applicant proposed a berm in addition to the existing
vegetation as a buffer from abutting property owners. A
October 15, 1985
SUBDIVISIONS
Item No. 4 - Continued
deferral of the proposal was requested by Mr. James Johnston
whose residence abuts the project. He felt it was needed so
that other residents in Birchwood could be notified. The
applicant objected to this, since he felt that he had given
adequate notice to persons within-200' and sent letters to
the neighborhood. Mr. Johnston expressed concerns about the
landscaping, lighted parking lot, lighted sign on top of the
hotel and whether or not the proposal adequately expressed
what was to be built. Mr. Van Nicholson expressed a fear of
devaluation of property values, increased traffic, crime and
increased sewer problems.
A discussion was held on the proposed height of the building
and the roof sign shown in a photograph of the hotel, which
indicated that the total structure was 62' high. The
applicant agreed to work within the Sign Ordinance and
provide a structure of 431. Finally, a motion was made for
approval subject to the plans including a sight -proof fence
in addition to the berm, unless the applicant submits a
written agreement between the applicant and two adjacent
property owners that provides some agreement stating that a
fence be built intially or not at all within the time frame
of six months and staff recommendation. The vote was
unanimous: 11 ayes, 0 noes and 0 absent.
st 12, 1986
gVISIONS
1 N�
NAME:
Mariott Courtyard Hotel
(Garden Plaza Revised PCD)
(Z-4485-A)
North Side of Financial Centre
LOCATION: Parkway, approximately 600
west of Shackleford
AGENT:
Seth Barnhard
DEVELOPER:
Courtyard Development
c/o Financial Centre
Dev. Co.
P.O. Box 56350 AR 72215
Little Rock,29600
Phone:
ENGINE:
Edward G. Smith and Associates
401 Victory
Little R374�1666
AR
Phone:
AREA: 4.35 acres NO. OF LOTS:
ZON NG: nC-3n/n0-3" to PCD
PROPOSE: Hotel
1 FT. NEW ST.: 0
A. Development Objective To develop "The Courtyard
elop a hotel resulting from
(1) t which is targeted toward ce tmoA
Concep ,�� o ulation. The concept provides
segment of the population.
P comfortable,
hotels with: (1) attractive, secure
functional rooms; (2) a relaxing,
environment; (3) a simple restaurant with good
food; (4) a well managed operation with friendly,
helpful employees; and (5) an affordable price.
B. proposal
building for use as a hotel
Iwo( 1) The constr according dot the following
,st 12, 1986
WTVISIONS
em No. 13 - Continued
149
Number of rooms ..
Nu ...-• 1125
Number 12
of suites �•� .........
Two conference rooms 1090
Restaurant—*
4t . • . 960
6seats)
square feet
Square feet
square feet
Lounge where public
(36 Seats) wings are 3-stories
Guest room
areas are 1-story •••••......a,,0O0 square feet
Parking °•..°......
Building area °•••
Comments the opposite
C. Engineerin requires that
Parkway at
Engineer Centre
( l ) The Traffic Financial in order to
of the street on be shown Dint
side access point for the access P.
the western location cut on Financial
determine the proper xisting median
in regard to the
Centre parkway* are required in
St
calculations plat*
location ater detention the preliminary P
(2) shown on
theon Financial Centre
(3) Right-
of-way dediction
Parkway may be required.
sis therefore, the
D. Anal application* ing�
this as a new Pp for landscaP such as
Staff viewed address plans information,
applicant sho% y other submission feet and the
screening and
to land in square projected
building development was P
ratio of schedule of
proposed ro osal
completion dates. the P p (1)
that changes from
stated on this site include:
The applicant has roved size reduction
ina11Y apP , 5 ; ( 2 )
that was orig 3-stories from e facility; ct
and loung the structure
the reduction to restaurant location of but
meeting rooms, 59; (4) homes, of rooms by single family
reduction of adjacent building and no
to the the The
50' closet in the scale °f the neighborhood• and 100
reduction toward
facing the neighbors
fhad one wing neighborhood.
orientation next to the
original plan parking
located
percent more P
.1.11Y
ust 12, 1986
DIVISIONS
!m No. 13 - Continued
The main issue is the location of the building closer
to the neighborhood than originally sited. Staff
expects some input from residents regarding
is
change. More detail is requested on the site plan.
Dumpster locations should be shown and the parking
layout indicated. Pleas show
an complete median across
the street and opposite
E. Staff Recommendation
Reserved until additional information received.
SUBDIVISION COMMITTEE REVIEW:
The applicant requested a 30 day deferral.
PLANNING COMMISSION ACTION:
A motion for a 30-day
deferral, as requested by the
applicant, was made and passed by a vote of 11 ayes, 0 noes
and 0 absent.
L�
SeotGrr::Jer 9, 1986
7ISIONS
teT. ':rJ . B
NA 1a
- (- r-7 -Tro, .
e =.. Earnhard
.,,i-irtyard Development
c/o Financial Centre
SoZ 56350
- _ Ro c:e , AR 72215
^:e 224-9600
Mariott Courtyard Hotel
(Garden Plaza Revised PCD)
(Z-4485-A)
North Side of Financial Centre
Parkway, approximately 600'
west of Shackleford
ENGINEER:
Edward G. Smith and Associates
401 Victory
Little Rock, AR
Phone: 374-1666
- 4.35 acres NO. OF LOTS 1
? G "C-3"/"0-3" to PCD
USES: motel
FT. NEW ST.: 0
Deye1opment OrJjective
�1) To develop a hotel resulting from "The Courtyard
Concept," which is targeted toward the moderate
segment of the population. The concept provides
hotels with: (1) attractive, comfortable,
f•snctional rooms; (2) a relaxing, secure
environment; (3) a simple restaurant with good
food; (4) a well managed operation with friendly,
helpful employees; and (5) an affordable price.
�ro:Josal
(1) The construction of a building for use as a hotel
according to the following:
September 9, 1986
SUBDIVISIONS
Item No. B - Continued
(a) Number of rooms .............
(b) Number of suites ............
(c) 2 conference rooms ..........
(d) Pestaurant ..................
(46 Seats)
(e) Lounge ......................
(36 seats)
(f) Guest room wings are 3-stories
where oublic areas are 1-story
(g) Parking .....................
(h) 3u1_16ing area ...............
(i) Patio of bldg. to land ......
(2) Developmental Time Frame:
149
12
1525 sq. ft.
logo sq. ft.
960 sq. ft.
164
87,000 sq. ft.
19.9
Opening Date - 4th Quarter of 1987
Construction - Begins 1st Quarter_ of 1987
(3) Drainage:
The de-.7elope-r will utilize the parking lots or an
underground system for retention areas as required
by t:�e City Drainage ordinance.
(4) Platting:
A one lot replat will be submitted.
(5) Landscaping/Site Develo ment:
The proper-/ will be de eloped in such a way as to
minimize �excaa�t��na���ndcthe5hotelpossible.
will be The lawn
and planting areas
Jly planted. included is a 25 to 32-foot
landscaped ouffer strip alone adjacent residential
areas.
C . Engineering Commi ents
( 1 ) The Traffic Engineer requires that the opposite
side of t'^e street on Financial Centre Parkway at
the western access point be shown in order to determine the proper location for the access point
September 9, 1986
SUBDIVISIONS
Item No. B - Continued
in regard to the existinq median cut on Financial
Centre parkway.
(2) Stormwater detention calculations are required in
the location shown on the preliminary plat.
(3) Right-of-way dedication on Financial Centre
Parkway may be required.
D. Analysis
The applicant has stated that changes from the proposal
that was originally approved on this site include: (1)
the reduction to 3-stories from 5; (2) size reduction
of meetinq rooms, restaurant and lounge facility; (3)
reduction of rooms by 59; (4) reduction in the scale of
the building and no orientation of rooms toward the
neighborhood. The original plan had one wing facing
the neighbors and more parking located next to the
neighborhood.
The main issue is the location of the building closer
to the neighborhood than originally sited. However,
the 1_andscar)pd buffer zone remains a minimum of 2.5'
wide a.lona the north and has been increaser to 32' at
the northwest 'corner. Staff_ expects some input from
residents regardinq this chance. Fngineerinq comments
have been addressed.
E. Staff. Recommendation
Approval as revised.
SUBDIVISION COMMITTEE REVIEW: (7-31-86)
The applicant requested a 30 day deferral.
S)
0
September 9, 1986
SUBDIVISIONS
Item No. B - Continued
PLANNING COMMISSION ACTION:
A motion for a 30-day deferral, as requested by the
applicant, was made and passed by a vote of 11 ayes, 0 noes
and 0 absent.
SUBDIVISION COMMITTEE REVIEW: (8-28-86)
The applicant was present. He outlined several differences
between this proposal and the previous hotel approved for
this site. Staff indicated that all concerns had been
addressed. The item was passed to the Commission.
PLANNING COMMISSION ACTION:
The application was represented by Mr. Dave DesForges from
The Mariott Corporation, Mr. Mike Green and Mr. Edward
Willis from the Financial Development Corporation. A few
residents from the Birchwood Subdivision were in attendance.
Mr. dames Johnson of.420 Birchwood asked that any fill put
in the 25' buffer strip and the retaining wall be amenable
to the adjacent single family area; and that an 8' fence be
provided somewhere near the middle of the buffer area.
Mr. Willis requested flexibility, which would be dictated by
the design and approval of a new grading plan in locating
the fence. He stated that lighting would be oriented toward
the parking lot.
A motion was made and passed for approval subject to
construction of a fence not to exceed 81, and the developer
to be given the option, at his discretion, to move the fence
inward 12.5'. The vote: 11 ayes, 0 noes and 0 absent.
0)