HomeMy WebLinkAboutS-0765 Staff AnalysisJune 30, 1987
SUBDIVISIONS
Item No. B
NAME:
LOCATION:
AGENT:
Shacklef_ord Place "Long -Form"
PRD (Z-4824)
Southwest quadrant of
Shackleford and I-430
IIDXTVT.ADT?V .
J.B. Vanhook Realty, Inc. C. & A. Investors, Ltd.
1100 North Hughes Street 1275 Peachtree Street, NE
Little Rock, AR 72207 Atlanta, GA 30367
Telephone: 664-7554 Telephone: (404) 888-3000
Contact: James W. Bealle
Charles Kober Associates
4514 Travis Street, Suite 350 LB7
D allas, TX 75205-4127
Telephone: (214) 520-3500
AREA: 30 acres NO. OF LOTS: 1 FT. NEW STREET: 0
ZONING: 110-2"
PROPOSED USES: Mixed Use Shopping Center
A. Development Proposal
1. To construct 30 acres as a mixed use development
containing commercial, retail, office, and hotel
uses.
B. Quantitative Data
(1)
Major A . . . . . . . . .
. . . 41,600
sq.
ft.
(2)
Major B . . . . . . . . .
. . . 28,000
sq.
ft.
(3)
Retail C .. . . . . .
. . . 67,695
sq.
ft.
(4)
Cinema (D)1,900 . . . .
. . . 25,600
sq.
ft.
(5)
Office E . . . . . . . .
. . . 105,500
sq.
ft.
(6)
Hotel F (250 rooms) . . .
. . . 108,000
sq.
ft.
(7 )
Bank G . . . . . . . . .
. . . 5,000
sq.
ft.
(8)
Restaurant H . . . . . .
. . . 6,000
sq.
ft.
Total 432,390 sq. ft.
June 30, 1987
SUBDIVISIONS
Item No. B - Continued
(9) Parking . . . . . . . . . . 1,922 spaces
- handicapped parking will be provided per Code.
C. Developmental Time -Frame
Site work will commence in the spring of 1988 with
development of the entire project taking five years.
D. Engineering Comments
(1) Pay for signals at off ramp and the proposed one
into shopping center.
(2) Shackleford will be .five -lane section, plus extra
decel lane at each of two intersections. Traffic
study did not indicate this.
(3) Dual lefts at intersection onto Shackleford.
100-foot right-of-way on Shackleford required.
Additional right turn lane on I-430 on -ramp.
(4) Problem with interior lay -out. Traffic Engineer
needs to approve internal parking lay -out at
entrances.
(5) Show how interior collector ties into property to
the south.
(6) Provide public collector for frontage access road
instead of interior type collector.
(7) It appears that traffic study does not address
Master Street Plan requirements; however, its a
good starting point.
(8) Grading plan is deficient (contact Mike Batie at
Engineering). Deficiencies include:
(A) No provision for undisturbed buffer strip
adjacent to I-430 and Shackleford adjacent to
Alde rsgate .
(B) Cut and fill shown will totally strip all
existing tree cover. Plan should provide for
June 30, 1987
SUBDIVISIONS
Item No. B - Continued
terracing which retains existing tree cover
within.
(C) Not shown on plan - cut and fill by hatching,
stages of grading, top and toes of cut and
fill, erosion and sediment control, seal of
registered engineer. Please see Mike Batie.
E. Analysis
Staff has serious concerns about the proposed
development. Problems with traffic, site plan, and the
grading plan have been indicated. Of foremost concern
is the applications proposed use, which represents a
radical departure from the I-430 Land Use Plan, which
designates the area as a scenic office corridor. Staff
feels any change in this document as a major shift in
policv; and is very reluctant to support such a change
at this time.
There are several reasons for this position. As
designed, the site plan appears to encourage strip
commercial development along Shackleford with the food
establishments in their proposed locations. Staff is
very concerned about strippinq out this area since it
could adversely affect Sandpiper Subdivision, create
traffic problems, and place pressure on the Aldersgate
property to the east. There are also other vacant
parcels available that are currently zoned for
commercial at Kanis and Shackleford, Markham and Kanis,
and the Colonel Glenn interchange. Furthermore, the
area has begun to develop as an office corridor as
recommended in the I-430 Land Use Plan. Examples
include the Farm Bureau and Koger Office Park, which
has bought additional land for an extension of their
current use.
Engineering has pointed out that the traffic study does
not address City requirements and was not very thorough
since it did not recoqnize Shackleford as a five lane
arterial and the future 36th Street interchange in the
traffic considerations.
It is felt that the site plan is overbuilt with parkinq
and buildings, which results in the proposed amount of
June 30, 1987
SUBDIVISIONS
Item No. B - Continued
grading. If approved, staff suggests scaling down the
project, and leaving natural vegetation. A 50-foot
undisturbed buffer is recommended all around the site.
F. Staff Recommendation
Denial as filed.
SUBDIVISION COMMITTEE REVIEW:
Staff reported that a letter had been received requestinq
deferral until next month's meetinq.
PLANNING COMMISSION ACTION:
A motion for deferral was made and passed by a vote of
11 ayes, 0 noes, and 0 absent.
SUBDIVISION COMMITTEE REVIEW:
Staff reported that the Applicant had submitted a request
for withdrawal.
PLANNING COMMISSION ACTION: (6-30-87)
The Planning Commission included this item in the consent
agenda for withdrawal. The motion on withdrawal was
approved by a vote of 10 ayes, 0 noes, and 1 absent.
May 19, 1987
SUBDIVISIONS
Item No. 4
NAME:
LOCATION:
AGENT:
J.B. Vanhook Realty, Inc.
1100 North Hughes Street
Little Rock, AR 72207
Telephone: 664-7554
ENGINEER:
Shackleford Place "Long -Form"
PRD (Z-4824)
Southwest quadrant of
Shackleford and I-430
DEVELOPER:
C. & A. Investors, Ltd.
1275 Peachtree Street, NE
Atlanta, GA 30367
Telephone: (404) 888-3000
Contact: James W. Bealle
Charles Kober Associates
4514 Travis Street, Suite 350 LB7
D allas, TX 75205-4127
Telephone: (214) 520-3500
AREA: 30 acres NO. OF LOTS: 1 FT. NEW STREET: 0
ZONING: 110-2"
PROPOSED USES: Mixed Use Shopping Center
A. ❑evr . opment Proposal
1. To construct 30 acres as a mixed use development
containing commercial, retail, office, and hotel
uses.
B. Quantitative Data
(1)
Major A . . . . . . . .
. . . . 41,600
sq.
ft.
( 2 )
Major B . . . . . . . .
. . . . 28,000
sq.
f t .
(3)
Retail C .
67,695
sq.
ft.
(4)
Cinema (D) 1,900
25,600
sq.
ft.
(5)
Office E . . . . . . .
. . . 105,500
sq.
ft.
(6)
Hotel F (250 rooms) . .
. . . . 108000
sq.
ft.
(7)
Bank G . . . . . . . .
. . . . 5,000
sq.
ft.
(8)
Restaurant H . . . . .
. . . . 6,000
sq.
ft.
Total 432,390 sq. ft.
'May 19, 1987
SUBDIVISIONS
Item No. 4 - Continued
(9) Parking . . . . . . . 1,922 spaces
- handicapped parking will be provided per Code.
C. Developmental Time -Frame
Site work will commence in the spring of 1988 with
development of the entire project taking five years.
D. Engineerinq Comments
(1) Pay for signals at off ramp and the proposed one
into shopping center.
(2) Shackleford will be five -lane section, plus extra
decel lane at each of two intersections. Traffic
study did not indicate this.
(3) Dual lefts at intersection onto Shackleford.
100-foot right-of-way on Shackleford required.
Additional right turn lane on I-430 on -ramp.
(4) Problem with interior lay -out. Traffic Engineer
needs to approve internal parking lay -out at
entrances.
(5) Show how interior collector ties into property to
the south.
(6) Provide public collector for frontage access road
instead of interior type collector.
(7) It appears that traffic study does not address
Master Street Plan requirements; however, its a
good starting point.
(8) Grading plan is deficient (contact Mike Batie at
Engineering). Deficiencies include:
(A) No provision for undisturbed buffer strip
adjacent to I-430 and Shackleford adjacent to
Aldersgate.
(B) Cut and fill shown will totally strip all
existing tree cover. Plan should provide for
May 19, 1987
SUBDIVISIONS
Item No. 4 - Continued
terracing which retains existing tree cover
within.
(C) Not shown on plan - cut and fill by hatching,
stages of grading, top and toes of cut and
fill, erosion and sediment control, seal of
registered engineer. Please see Mike Batie.
E. Analysis
Staff has serious concerns about the proposed
development. Problems with traffic, site plan, and the
grading plan have been indicated. Of foremost concern
is the applications proposed use, which represents a
radical departure from the I-430 Land Use Plan, which
designates the area as a scenic office corridor. Staff
feels any change in this document as a major shift in
policy; and is very reluctant to support such a change
at this time.
There are several reasons for this position. As
designed, the site plan appears to encourage strip
commercial development along Shackleford with the food
establishments in their proposed locations. Staff is
very concerned about stripping out this area since it
could adversely affect Sandpiper Subdivision, create
traffic problems, and place pressure on the Aldersgate
property to the east. There are also other vacant
parcels available that are currently zoned for
commercial at Kanis and Shackleford, Markham and Kanis,
and the Colonel Glenn interchange. Furthermore, the
area has begun to develop as an office corridor as
recommended in the I-430 Land Use Plan. Examples
include the Farm Bureau and Koger Office Park, which
has bought additional land for an extension of their
current use.
Engineering has pointed out that the traffic study does
not address City requirements and was not very thorough
since it did not recognize Shackleford as a five lane
arterial and the future 36th Street interchange in the
traffic considerations.
It is felt that the site plan is overbuilt with parking
and buildings, which results in the proposed amount of
May 19, 1987
SUBDIVISIONS
Item No. 4 - Continued
grading. If approved, staff suggests scaling down the
project, and leaving natural vegetation. A 50-foot
undisturbed buffer is recommended all around the site.
F. Staff Recommendation
Denial as filed.
SUBDIVISION COMMITTEE REVIEW:
Staff reported that a letter had been received requesting
deferral until next month's meeting.
PLANNING COMMISSION ACTION:
A motion for deferral was made and passed by a vote of
11 ayes, 0 noes, and 0 absent.