Loading...
HomeMy WebLinkAboutRevised site plan 051324S88°06'15"E 139.95'N2°33'34"E 75.06'N88°12'49"W 139.99'S2°31'47"W 74.79' www.tuckersurveying.com phone: 501.269.7138 Cabot, Arkansas 72023 P.O. Box 1021PROJECT NO:ISSUE DATE:DRAWN BY:APPROVE BY:SHEET NO.:PREPARED FOR: DELTA DESCRIPTION DRAWING: C:\USERS\NICKTUCKER\ONEDRIVE - TUCKER LAND SURVEYING\!TUCKER LAND SURVEYING\2023 JOBS\23-00489 LOT 2 AND 4 BLK 8 CAPITOL VIEW\DWG\TRACT 1 CAPITOL VIEW.DWGLAYOUT: 8.5X14 LANDSCAPE , LAST SAVED: NICKTUCKER, 2/15/2024 1:36:56 PMLAST PLOTTED BY: NICK TUCKER, 5/11/2024 11:29:29 AM ("PLOTTED BY:" VALID ON HARD COPY ONLY) © 2022 TUCKER LAND SURVEYING, INC. DATESTATE PLAT CODE:B.FERRELL02/15/202423-004891 OF 1BOUNDARY SURVEY PT LOT 2 AND ALL LOT 3 OF BLOCK 8 CAPITOL VIEW ADDITION 206 S PARK STREET MIDARK HOUSES LLC LITTLE ROCK, PULASKI COUNTY ARKANSASPLATTED SUBDIVISIONN.TUCKERSTATE PLANE COORDINATE SYSTEM,ARKANSAS NORTH ZONE, NAD 83U.S. SURVEY FOOTBEARINGS: GRIDDISTANCES: GROUNDSCALE FACTOR: 1.000041319511'CONVERGENCE ANGLE:-0° 10' 21.30169891"**VALUES TAKEN AT NE/C SURVEY**DRAWING LEGENDFOUND IRON PIN (AS NOTED)SET 1/2" REBAR WITH CAP, LS #1755CALCULATED POINTEASEMENT LINESASPHALT/CONCRETE/GRAVELBUILDING SETBACK LINESEXISTING FENCE LINEPROPERTY LINEEXISTING BUILDINGSBY GRAPHIC PLOTTING ONLY, THE PROPERTY SHOWN ONTHIS SURVEY IS WITHIN ZONE X, ZONE X BEING AREASDETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCEFLOODPLAIN ,AS PER FEMA FIRM MAP COMMUNITY PANELNUMBER 05119C0456H, DATED JUNE 7, 2019, BASED UPONSURVEYOR'S INTERPRETATION OF THE LOCATION OF THEFLOOD HAZARD BOUNDARY LIMITS IN RELATION TO THEPROPERTY LINES.FLOOD ZONE NOTELEGAL DESCRIPTIONSOUTH HALF OF LOT 2 AND ALL OF LOT 3, BLOCK 8OF CAPITOL VIEW ADDITION, AS RECORDED INPULASKI COUNTY, ARKANSAS, AS SHOWN ON A PLATOF RECORD, RECORD'S OF THE CIRCUIT CLERK'SOFFICE, PULASKI COUNTY, ARKANSAS.FOR THE USE AND BENEFIT OF MIDARK HOUSES LLC:THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THESURVEY ON WHICH IT IS BASED WERE MADE INACCORDANCE WITH THE MOST CURRENT ARKANSAS STATEMINIMUM STANDARDS FOR SURVEYS OF THIS TYPE. THEFIELD WORK WAS COMPLETED UNDER MY SUPERVISION ON10/19/2023DATE OF PLAT OR MAP: 02/15/2024NICHOLAS TUCKER, LS #1755SURVEY CERTIFICATIONBASIS OF BEARING