HomeMy WebLinkAboutS-0648-C Map 2CERTIFICATE OF OWNER
11A
C,4N,4L
a�----� — -- --
ti
///P
\ PQ
0cvy(n�
8 b�
7'
ap 50.0 ...
�T—
a 9/P
8
�c
V
CdSCmer�/
GC/V72,4 .voTf-S
,qcc-eon, �7�'/� ufi /i�ic� </�/cam olhcr wix NorL�'
3 ,Q// 0/0fa/Dcn� 1hown A/cam Cur->'t-o .-i/e G,50ir}6 -
4 C'am, r�o/� kL�i2"�finr� Argo AroG' ,9Cr C,517 .� v�i.� �ix�
77�.PiYere'd/e Ndr-(xaur- ��un/cif/ //r�l�emenr �`?i�/�ic.1
/f 20
,yo rn
Go/f Ctw/�'
rh1s
CERTIFICATE OF SURVEYING ACCURACY
1, Joe D. White, hereby certify that this
plat correctly represents a boundary survey
made by me and boundary markers shown hereon
actually exist and their location, type and
material are correctly shown.
Date of Execution Joe D. White
Registered Land Surveyor
No. 534, Arkansas
CERTIFICATE OF ENGINEERING ACCURACY
I, Timothy E. Daters, hereby certify that this
plat correctly represents a plan made by me,
and that the engineering requirements of the
Little Rock Subdivision Rules and Regulations
have been complied with.
Hate of Execution Timothy E. Daters
Registered Professional
Engineer No. 5033, Arkansas
A 4-
4 ^ ici`yc)
�-usl3-e q `& L) n apt
We, the undersigned, owners of the real es-
tate shown and described herein, do hereby
certify that we have Laid off, platted, and
subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with
this plat.
Bate of Execution
D.R. _Page —----------
Address
Instrument
CERTIFICATE OF FINAL APPROVAL.
Pursuant to the Little Rock Subdivision Rules
and Regulations, and all of the conditions of
approval having been completed, this docu-
ment is hereby accepted. This certificate is
hereby executed under the authority,of said
Rules and Regulations.
to of Execution Little Rock Planning
Commission
CERTIFICATE OF RECORDING
This document, number
record 19
Page
T,�^
STA"TF OF
APJ NSAS
%��IDJOFD
,''.,yqC• LAtiO
�p[ ep gig i.®8ML"OCK ;p//gy�pp RYYCC
2f �2Q
-PLANS —�
I�
ARKL,A
A Lo F;ROVED VERIANCE DISAPPROVED
aPPaoVED ZONING DISAPPROVEOp
AT
L �c
p l BY
V/C/N/TY M.QP Nrs
E
_ , filed for
in Plat Book
w Q �
NO ADDITIONAL EASEMENTS REQUIRED
ADDITIO L BASEMENTS REQUIRED
AS
BY:
I DATE:
CQNQL lr-�"INTf
,ern Addi pion TO 71'A-, 0,l O)�Liff/C IQ:�Ck, gT�dn�ds
Bc=/nq A /PC,o%/ of!of-j 9 /o, �// CdTDa/ Fbir�fe, An.
70 the C-lly
O So /Gib /50 zr
0 WHITE-DATERS s ASSOCIATES, INC.
Q CIVIL ENGINEERING. LAND PLANNING S DEVELOPMENT, SURVEYING
Q 401 Victory Street Little Rock, Arkansas 72201