HomeMy WebLinkAboutS-0643-E Map 1CENTER
SECTION
T-1-S,
R-13-W
11
R-2
�-
14
245.00
S 02'07'15" W
30.00'
POB
300
88°24'04" E
S
60.00 60.00
0
0
0
0
N
w
LOT 44
iA
LOT 45
LOT
00'
PHASE 1
ITISPERING OAFS SUBDIVISIONLf-
R-2
Q
0
0
z�
0 I�
w,
LOT 1 0-10
LOT 43 LO
310 I O
_ A I ALLEY RO
R0 W S 02'070100 W�-
EiU. 0 ` 60.00 65.00
POB
LOT 4
0
O
N
T 48
in
10' E_ SEM I
N
60.Q 6 00 0.00 6 00 0.00
N 88°24'04 ' W
300 300.00'
R-2
n
O
N
O
PROPERTY DESCRIPTI,QK
PART OF THE NORTH HALF OF THE SE 1 /4, SECTION 14, T-1-S, R-13-W,
PULASKI COUNTY, LITTLE ROCK, ARKANSAS. MORE PARTICULARLY DESCRIBED AS:
Q
Q
0
O
z�
9 �0
CL
U) LOT 28
Iq
Io
In 310
S 88'24'04" E
01 87nn IFin 6
CERTIFICATE OF PRELIMINARY SURVEYING ACCURACY
ROBERT C. LOWE--------- HEREBY CERTIFY THAT THIS PLAT CORRECTLY
REPRESENTS A BOUNDARY SURVEY MADE OR VERIFIED BY ME THAT ALL SURVEYING RE-
QUIREMENTS OF THE STATE OF ARKANSAS AND THE CITY OF LITTLE ROCK SUBDIVISION
RULES AND REGULATIONS HAVE BEEN COMPLIED WITH AND A COPY OF SAID BOUNDARY
5E_
HAS BEEN DULY FILED FOR THE RECORD OFFICES OF THE STATE URvYdf- AND• THE
PULASKI COUNTY CIRCUIT CLERK ON -----_ .
IN PLAT BOOK ________________ PAGE
SIGNED 'µ4ry 7z\�
3/2/2007
--------- --------------------- --- �,------
DATE OF EXECUTION NAME, REGISTERE`f�, OR
ee4e
NO.__12 ___, ARKAN..!=t4o'
CERTIFICATE OF PRELIMINARY ENGINEERING ACCURACY
PATR_I_CK_M_. _M_C_GETRICK ----- HEREBY CERTIFY THAT THIS PLAT
CORRECTLY REPRESENTS A PLAT MADE BY ME, AND THAT ENGINEERING REQUIREMENTS
OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS HAVE BEEN COMPLIED
WITH.
- _ -�1 _ SIGNED s .
3/2/2007 g;
--------------------------- - ---- --------------
DATE OF EXECUTION ME, REGISTERED ENGINEER
N0._456_6__.," ARKANSAS
CERTIFICATE OF PRELIMINARY PLAT APPROVAL-
ALLtti
REQUIREMENTS OF THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS
----- RELATIVE TO THE PREPARATION AND SUBMITTAL OF A PRELIMINARY PLAT HAVING
BEEN FULFILLED, APPROVAL OF THIS PLAT IS HEREBY GRANTED, SUBJECT TO
FURTHER PROVISIONS OF SAID RULES AND REGULAITONS. THIS CERTIFICATE
00 67.00 SHALL EXPIRE -------------------------
DATE
--- --
-- - --
30'
ETB
K
- - -
SIGNED
O
O
O------------
O
-----_-------- --- ---------------
DATE OF EXECUTION NAME
N
LOT 49
OT 50
O
N
LITTLE ROCK PLANNING COMMISSION
w
LOT 51 0
LOT 52
0
LOT 5 LOT 4
o
GENERAL NOTES
00
310
N
N
N
_Ln
1.
ALL BUILDING LINES ARE AS SHOWN
N
h
Z
o
2.
ALL DISTANCES ON CURVED BOUNDARIES ARE CHORD DISTANCES
3.
ALL CORNER RADII ARE 25', UNLESS OTHERWISE NOTED.
________
10'
ASEME T
4.
ALL STREET R-O-W AND CUL-DE-SAC RADII ARE 50', UNLESS
65.00
67.00 --
- 67.0 --
--GTUT
---
-Fi7-00 -- ------ _
OTHERWISE NOTED
67.00
N 24'04" W
400.00'
5.
ALL EASEMENTS SHOWN ARE 10' IN WIDTH, UNLESS OTHERWISE NOTED
6.
ALL EASEMENTS ON COMMON LOT LINES ARE 10' IN WIDTH, 5' EITHER
R-2
SIDE, UNLESS OTHERWISE NOTED
7.
ALL EASEMENTS ARE TO BE USED FOR UTILITIES AND/OR DRAINAGE
8.
AVERAGE LOT SIZE 65' X 200'
9,
LINEAR FEET OF NEW STREET 0 FT.
10.
ZONING R-2
11.
NUMBER OF LOTS 11
12.
WATER SOURCE CENTRAL ARKANSAS WATER
DEVELOPER ,/ OWNER
13.
SANITARY SEWER SOURCE CITY OF LITTLE ROCK
JAY HOBBS
14716
ROYAL OAKS DR.
14.
NO PORTION OF THIS PROPERTY IS IN THE 100 YEAR FLOODPLAIN
LITTLE
ROCK ,AR 72210
COMMENCING AT THE
CENTER
OF SECTION
14, T-1-S,
R-13-W;
THENCE N 88�24'04"
E 245.00'
THENCE
S 02007'15"
W 30,00'
TO THE POINT
OF
BEGINNING THENCE
S 88"24'0411
E 300.00';
THENCE
S 02007'15"
W 200.00'; THENCE
N 88°24'0471
W 300.00';
THENCE N
02007'15"
E 200.00';
TO THE
POINT OF BEGINNING
CONTAINING
1.377
ACRES MORE
OR
LESS
AND
COMMENCING
AT THE
CENTER
OF SECTION
14, T-1-S,
R-13-W;
THENCE N 88024'04"
E 745.00'
THENCE
S 02007'15"
W 30.00'
TO THE POINT
OF
BEGINNING THENCE
S 88024'04"
E 400.00';
THENCE
S 02007'15"
W 200.00'; THENCE
N 88'24'04"
W 400.00';
THENCE N
02°07'15"
E 200.00';
TO THE
POINT OF BEGINNING
CONTAINING
1.837
ACRES MORE
OR
LESS
1
ai 5-k
q
Y�ss-0`�
VICINITY MAP
1 "= 50'
ice' R i ` L. R �' �,
PHASE 2
WHISPERING OAFS S�JjjDIVISION
LITTLE ROCK, ARKANSAS
rimilm
204110
# 10 OTTER CREEK COURT SUITE A
LITTLE ROCK, ARKANSAS 72210
PHONE 501-223-9900
1 e%) I
.
lxk
DATE: MARCH 2, 2007
\2007\WHISPERING OAKS PHASE 2