Loading...
HomeMy WebLinkAboutS-0636-O Staff AnalysisfIXTAIN91m3 NAME: Kanis Commercial Park II Preliminary Plat S-636-0 LOCATION: located South of the intersection of Kanis Commercial Drive and Kanis Park Drive Plannina Staff Comments: 1. Provide notification of abutting property owners of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than December 3, 2008. The Office of Planning and Development must receive the proof of notice no later than December 12, 2008. 2. A 50 foot strip along the western perimeter of the property is zoned OS. Label the zoned open space strip on the proposed plat. Variance/Waivers: None requested. Public Works Conditions: 1. Due to the proposed use of the property, the Master Street Plan specifies_ that Kanis Park Drive must meet commercial street standards. Dedication of right-of-way to 60 feet is required. 2. With site development, provide the design of the street conforming to the Master Street Plan. Construct street improvement to Kanis Park Drive including 5-foot sidewalks on both sides to Commercial Street standard with the planned development. 3. Show the proposed driveway locations for the lots. 4. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. Is grading and clearing of the lots planned to occur with street construction? If so, a variance from the Land Alteration Ordinance must be obtained. 6. Provide a Sketch Grading and Drainage Plan of the street and lots per Section 29- 186 (e). 7. Storm water detention ordinance applies to this property. 8. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 9. Section 31-403 of the Little Rock code requires streetlights. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. Item # 3. 10.On site striping and signage plans should be forwarded to Public Works, Traffic Engineering for approval with the site development package. 11.Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the private improvements located in the right-of-way. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required, with easements, for this project. Contact Little Rock Wastewater Utility for additional information. Enter : No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A water main extension and additional fire hydrants will be required in order to provide service to this property. Central Arkansas Water may request that tie-ins be made to existing mains in Cerelle Drive and Labette Manor Drive. If these tie-ins are made, additional easements will be required and the utility will participate in the cost of construction of the facilities. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Planning Division: No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Monday, December 1, 2008. Item # 3 December 18, 2008 ITEM NC_: 3 FILE NO.: S-636-0 NAME: Kanis Commercial Park II Preliminary Plat LOCATION: Located South of the intersection of Kanis Commercial Drive and Kanis Park Drive DEVELOPER Dr. Alonzo D. Williams, Jr. 8908 Kanis Road Little Rock, AR 72205 FNC,INFFR- Crafton Tull Sparks 10825 Financial Center Parkway Little Rock, AR 72211 AREA: 9.987 acres CURRENT ZONING PLANNING DISTRICT CENSUS TRACT NUMBER OF LOTS: 9 FT, NEW STREET: 443 LF 0-3, General Office District and OS, Open Space 11 — 1-430 24.04 VARIANCESIWAIVERS REQUESTED: None requested. A. PROPOSAL/REQUEST: The applicant is requesting preliminary plat approval for a 9.987-acre tract of land at the intersection of Kanis Commercial Drive and Kanis Park Drive to be known as Kanis Commercial Park 11. The property is owned and is to be subdivided by Dr. Alonzo D. Williams. The property was previously preliminary platted but the approval has expired resulting in the current application request to renew and revise the plat proposal. The property is currently zoned 0-3, General Office District and is undeveloped and will be developed in one phase. The subdivision preliminary plat indicates 9 lots and 443 feet of new street which will be an extension of Kanis Park Drive. The road will be 36 feet wide, have sidewalks on both sides and terminate in a cul-de-sac. Detention storage will be provided on site. Central Arkansas Water will provide water and Little Rock Wastewater Utility will provide wastewater disposal. December 18, 2008 SUBDIVISION ITEM NO.: 3 (Cont.) _ B. EXISTING CONDITIONS: FILE NO.: S-636-0 The site is wooded with a gradual slope from north to south. Kanis Park Drive has been constructed to Master Street Plan standard up to the northern property line of the proposed plat area. There are three apartment complexes located adjacent to the site. There is a development zoned R-5 located to the east and accessed from John Barrow Road. There are also apartment developments located to the northwest accessed from Kanis Road and to the south accessed from Labette Manor Drive. West of the site is a single-family subdivision. South of the site is vacant property zoned MF-18 and further south is property zoned PD-R which was approved for senior housing but has not been constructed. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has not received any comment from area property owners. All abutting property owners of the site along with the John Barrow Neighborhood Association were notified of the Public Hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS 1. Due to the proposed use of the property, the Master Street Plan specifies that Kanis Park Drive must meet commercial street standards. Dedication of right-of-way to 60 feet is required. 2. With site development, provide the design of the street conforming to the Master Street Plan. Construct street improvement to Kanis Park Drive including 5-foot sidewalks on both sides to Commercial Street standard with the planned development. 3. Show the proposed driveway locations for the lots. 4. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 5. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 6. Provide a Sketch Grading and Drainage Plan of the street and lots per Section 29-186 (e). 7. Storm water detention ordinance applies to this property. 2 December 18, 2008 SUBDIVISION ITEM NO.: 3 (Cont. FILE NO.: S-636-0 8. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 9. Section 31-403 of the Little Rock code requires streetlights. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. 10. On site striping and signage plans should be forwarded to Public Works, Traffic Engineering for approval with the site development package. 11. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the private improvements located in the right-of-way. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required, with easements, for this project. Contact Little Rock Wastewater Utility for additional information. Enter : No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. A water main extension and additional fire hydrants will be required in order to provide service to this property. Central Arkansas Water may request that tie-ins be made to existing mains in Cerelle Drive and Labette Manor Drive. If these tie-ins are made, additional easements will be required and the utility will participate in the cost of construction of the facilities. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route, F. ISSUES/TECHNICAL/DESIGN: Planning Division: No comment. 3 December 18, 2008 SUBDIVISION ITEM NO.: 3 Cont. FILE NO.: S-636-0 Landscape: No comment. G. SUBDIVISION COMMITTEE COMMENT: (November 20, 2008) The applicant's representative was present. Staff presented an overview of the development stating there were additional items necessary to complete the review process. Staff stated there was a 50-foot zoned OS strip located along the western perimeter. Staff requested this area be indicated on the plat. Public Works comments were addressed. Staff stated all abutting and internal streets would require construction to Master Street Plan standard. Staff also stated, prior to development, a grading permit was required. Staff stated if disturbed area was one or more acres, a permit from the Arkansas Department of Environmental Quality was required. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact these agencies for additional information. There being no further issues for discussion, the Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing a number of the issues raised at the November 20, 2008, Subdivision Committee meeting. The revised plat indicates the placement of a 50-foot OS zoned buffer along the western perimeter of the site. The plat also indicates all streets will be constructed to Master Street Plans standard. The subdivision is proposed in a single phase. The proposal is a preliminary plat to allow the creation of 9 office lots from this 9.987 acre parcel. The average lot size proposed is 0.987 acres and the minimum lot size proposed is 0.756 acres. A new commercial cul-de-sac street will be constructed to serve the new lots. The new street is proposed to be 443 linear feet in length in a 60 foot right of way with 36-feet of pavement. Sidewalks will be placed on both sides of the new street but do not appear to be placed at the property line on the proposed plat drawing. Staff recommends the new sidewalks be placed at the back of the right of way to allow separation of pedestrians and motorists on the new street. Mass grading and clearing is not anticipated with development of the subdivision. The intent of the development is for each of the lots to be sold individually and developed by the new owner. Drainage will be provided for the subdivision. Along the southern boundary there is an existing drainage ditch in this area, M December 18, 2008 SUBDIVISION ITEM NO.: 3 (Cont. FILE NO.: S-636-0 which diverts water away from the developed property to the south. A drainage easement will be platted along the common lot lines of Lots 5 and 6 where the drainage will be directed to a detention storage facility located in the southeast corner of the property. Staff is supportive of the request. The proposed plat appears to comply with the typical standards established within the Subdivision Ordinance for platting of an office subdivision. The property is zoned 0-3, General Office District. The lot sizes proposed are more than adequate to meet the typical ordinance standard for this zoning district. To staff's knowledge there are no outstanding technical issues associated with the request. The proposed plat is the reestablishment of a previously approved plat for this site in relatively the same configuration. STAFF RECOMMENDATIONS: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff recommends the sidewalks be placed at the back of the right of way. PLANNING COMMISSION ACTION: (DECEMBER 18, 2008) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff also presented a recommendation the sidewalks be placed at the back of the right of way. There was no further discussion of the item. The chair entertained a motion of approval of the item as recommended by staff. The motion carried by a vote of 6 ayes, 0 noes, 2 absent and 3 open positions. 5