HomeMy WebLinkAboutS-0615 Staff Analysis0ovember 26, 1985
Item No. B - File No. 615
NAME:
LOCATION:
r�
Main Street Project
"Long -Form PCD" (Z-4563)
From 12th Street to 14th
Street between Louisiana and
Scott
AGENT: ARCHITECT:
David Fitzhugh David Cowlin and B.L. Gaskin
Madison Financial Corp. BCCLW Architects
16th and Main P.O. Box Drawer 3019
Little Rock, AR 72202 Little Rock, AR 72201
374-4743 376-6671
Area: 3.08 acres No. of Lots: 21 Ft. New St.: 0 feet
ZONING:
"HR"
and "GB"
to
"PCD"
PROPOSED
USES:
110-3"
and
"C-3"
A. Development Objectives
1. To create an office and commercial onclave
comprised of renovated existing buildings with
free-standing and infill new construction, all
knitted together by common paving materials,
landscaping and streetscape elements.
2. To respect the Main Street facades of the
building.
3. To inwardly orient the project opening to and
centered on a new pedestrian alley with symbolic
gateways at either end of 13th Street.
4. To unify the project by complying with the
Streets -cape Ordinance.
5. To include part of the project in a CBID.
M
,er 26, 1985
lo. B - Continued
,roposal
The provision of office and commercial uses in
four phases on 3.08 acres.
2. To achieve a sense of place and provide greater
security, the project proposes to narrow 13th
Street between Main and Louisiana and incorporate
the north/south alley running parallel to these
streets allowing parking on 13th Street and
pedestrian use of the alley.
C. Proiect Data
1. Commercial
a. Renovated structures:
Initial commercial use
General business and retail
Sales
Restaurant
b. New construction:
Infill commercial
New building commercial
(would like option to
build office)
Total
2. Business
a. Renovated structures:
3. Parking - 263 spaces
- 18,300 S.F. 21%
4,581 S.F. 4%
4,000
S.F.
4%
9,000
S.F.
10%
35,881
S.F.
41%
53,657
S.F.
59%
88,538
S.F.
100%
D. Engineerin5 Comments
1. Coordinate all parking lot and closed street
geometrics with the Traffic Engineer.
2. Remove or fill tanks with material acceptable with
the Traffic Engineer at old service station at
14th and Louisiana.
F.
mber 26, 1985
No. B --continued
ith
3. Close alley one-half way south of 13th w
barricade of trees and shrubs and place a
hammer -head turnaround south of barricade.
Analysis
Staff is generally
supportive of the project, but it is
awaiting specific comments from the Capitol Zoning
structural
District staff relativstreete to sClosures and design
involvement, parking, is in the
elements. Everything south of 13th Street
Capitol Zoning District. 163 parking spaces are
needed.
Staff Recommendation
Reserved until further comments received.
SUBDIVISION COMMITTEE REVIEW:
Mr. Ron Newman of the Capitol Zoning District and the
ggested that the lot
applicant were present.
Mr. Newman su
oposal and
in the southwest corner beelimin tedtheooverallfrm the rproject.
felt that parking was sufficient
Staff requested one -lot final plat for the various lots.
PLANNING COMMISSION ACTION:
d the
Mr. David Fitzhugh of Madison pplicationMr. Ron andnNewman of
architect, represented
Othe
ne concerned property - owner was in
the CZD was present.
attendance.
Staff reported that Henk Koornstra, the traffic Engineer,
requested that the plan be modified to allow for no exiting
reported that the applicant
in the intersection of Louisiana
rep 13th Street an
no
backing into Main Street. between
had failed to file the petition to close the alley
12th and 14th Streets andthe
Allots all be rtedevisby ed to steel
delete the western most parking
Mr. Ron Newman. Mr. Newman explained that he had requested
deletion ew the parking lot because of its encroachment into
the immediate residential area.
dispute.
The main issue dQ�cuPresidentlofdArkansas Real Estate
Mr. Robert Traylor, apartments near
Development, Inc., stated that he owned some
13th and Louisiana and he was withinttheed of the
project. He
incorporation of his property
currently has a lawsuit pending against a Ms. Camino who
,ber 26, 1985
No. B - Continued
the property after default.
;sessed the property.
He claims to have
Mr. Fitzhugh stated that Madison Guaranty was the owner.
The City Attorney present advised against any Commission
action on the property until after the dispute was settledr
which would be in the next two or three months.
Mr. Fitzhugh requested action on the proposal provided he
delete the disputed portion. Due to the possible loss of
parking spaces, the Commission felt that staff needed to
reevaluate a revised Proposal so as to ascertain possible
impacts to the area.
A motion for deferral for two weeks was made and passed by a
vote of 9 ayes, 0 noes, 2 absent.
PLANNING COMMISSION ACTION:
The applicant was present. A revised plan was submitted.
Staff felt that the plan, which left out the disputed
parcel, was fine. However, the applicant forgot to delete
the southwestern parking lot. A motion for approval,
subject to: (1) a franchise for use of the alley and
(2) deletion of the parking lot was passed by a vote of:
9 ayes, 1 noe and 1 absent.
MAIN STREET PROJECT
SECOND REVISION
November 14, 1985
I. Summary of Revisions
The applicant wishes to revise the proposed Main Street PCD as follows:
1. The Clise Apartments (13th and Louisiana) and the 112 West 13th
Apartment House are to be withdrawn from the PCD, deleting 4702 sf
of business use.
2. Thirteenth Street between Main and Louisiana will not be closed, and
will not be narrowed to provide angle parking.
3. The alley in block 66 and block 67 will not be closed. The
applicant will seek a franchise for improvements shown to the alley
behind the Vintage Building. Although the alley will not be closed,
the applicant may wish to provide common paving in the alley, and
possibly in the portion of 13th Street at the intersection with the
alley, as a part of this project and will work with the Engineering
Division for approval.
4. The proposed area in the Cohn Building will be reduced by 7300 sf of
business use. The Cohn Building will contain only two floors,
rather than three as previously proposed. The Vintage and Cohn
Buildings will still be treated as one project.
Vintage/Cohn Areas
Original 18,300 sf Commercial
33,800 sf Business
Total S'_M sf
Revised 18,300 sf Commercial
26,500 sf Business
Total ATT07 sf
II. Parking
A total of 12,002 sf of business use has been deleted from the project.
Using the Capitol Zoning District parking requirement of one space per
350 gross square feet, we are able to reduce the required parking by 34
spaces. Forth -five spaces have been removed from the PCD by not closing
Thirteenth Street and by deleting the 12 parking spaces associated with
the 112 W. 13th Apartment House. However, a minimum of 20 parallel
parking places are available on 13th Street. If these spaces may be
counted against the required parking, only 25 spaces have been lost by
revisions to the PCD. This loss is more than balanced by the reduction
of the requirement by 34 spaces.
- 1 -
MAIN STREET PROJECT
SECOND REVISION
November 14, 1985
III. Phasing
Phase 1
Phase 1 is revised to include only the Vintage/Cohn Building, the
improvements in the alley and other parking on lots 1, 2, and 3 of block
14. Capitol Zoning formulae are used to calculate parking.
18,300 sf Commercial 59 spaces
26,500 sf Business 76 spaces
44,0U sf M spaces
Existing commercial and residential uses at this location would have
required 55 spaces. The difference for the increase to be provided is
80 spaces.
As part of Phase 1, 20 spaces would be available adjacent to the
building in the alley. Another 57 spaces are to be provided on lots 1,
2, and 3 of block 14 (southeast corner of 13th and Main). Lot 2 is
leased and not in the PCD. Additional on -street parking is available on
12th Street and Main Street. This on -street parking will be coordinated
with the streetscape improvements implemented under the proposed CBID.
PhacP 9
The revised Phase 2 will include the -remainder of what was originally
scheduled to be Phase 1, plus the portion of ACE plating originally
included in Phase 2. Other work formerly proposed as Phase 2 has been
deleted from the project.
Phase 3
Remains as originally proposed.
Phase 4
Remains as originally proposed.
REVISED LEGAL DESCRIPTION OF THE LOTS INCLUDED IN THIS P.U.D.
All in the Original City of Little Rock for use of identification, the
following description includes the former names of the businesses
located in the structures:
1. Cohn and Vintage Buildings - Lots 11 and 12 and the East 50' of Lots
1, 2, and 3 of Block 67.
2. Vacant Lot at the NW corner of 14th and Louisiana - Lot 7 and South
1/2 of Lot 8, Block 168.
- 2 -
MAIN STREET PROJECT
SECOND REVISION
November 14, 1985
3. Former gas station that has been removed at the NE corner of 14th
and Louisiana. The West 1/2 of Lots 5 and 6, Block 66.
4. "Regina's", "Sue's Barber Shop", Ace Plating, "Tiny's", "Puddephat"
- Lots 10, 11, 12 of Block 66.
5. Vacant Lots north of the 7-11 at 14th and Main - Lots 1 and 3, Block
14. Note: We are negotiating for the purchase or long-term lease of
Lot 2.
6. Four vacant lots due West of the Villa Marie - Lots 7, 8, 9, and 10
of Block 14.
7. Three Lots at the southeast corner of 13th and Louisiana, Lots 1, 2,
and 3 of Block 66.
8. Lot 4 of Block 66.
_3_
1
November 12, 1985
SUBDIVISIONS
Item No. 10 - File No. 615
NAME:
T.n ATTON
AGENT:
David Fitzhugh
Madison Financial Corp.
16th and Main
Little Rock, AR 72202
374-4743
Main Street Project
"Long -Form PCD" (Z-4563)-
From 12th Street to 14th
Street between Louisiana and
Scott
ARCHITECT:
David Cowlin and B.L. Gaskin
BCCLW Architects
P.O. Box Drawer 3019
Little Rock, AR 72201
376-6671
Area: 3.08 acres No. of Lots:- 21 Ft. New St.: 0 feet
ZONING: "HR" and "GB" to "PCD"
PROPOSED USES: "0-3" and "C-3"
A. Development Objectives
1. To create an office and commercial onclave
comprised of renovated existing buildings with
free-standing and infill new construction, all
knitted together by common paving materials,
landscaping and streetscape elements.
2. To respect the Main Street facades of the
building.
3. To inwardly orient the project opening to and
centered on a new pedestrian alley with symbolic
gateways at either end of 13th Street.
4. To unify the project by complying with the
Streetscape Ordinance.
5. To include part of the project in a CBID.
November 12, 1985
SUBDIVIS41ONS
Item No. 10 - Continued
B. Proposal
1. The provision of office and commercial uses in
four phases on 3.08 acres.
2. To achieve a sense of place and provide greater
security, the project proposes to narrow 13th
Street between Main and Louisiana and incorporate
the north/south alley running parallel to these
streets allowing park-ing-on 13th Street and
pedestrian use of the alley.
C. Proiect Data
1. Commercial
a. Renovated structures:
Initial commercial use
General business and retail
Sales - 18,300 S.F. 21%
Restaurant - 4,581 S.F. 4%
b. New construction:
Infill commercial - 4,000 S.F. 4%
New building commercial
(would like option to
build office) - 9,000 S.F. 10%
Total 35,881 S.F. 41%
2. Business
a. Renovated structures: 53,657 S.F. 59%
% 88,538 S.F. 100%
3. Parking - 263 spaces
D. Engineering Comments
1. Coordinate all parking lot and closed street
geometries with the Traffic Engineer.
2. Remove or fill tanks with material acceptable with
the Traffic Engineer at old service station at
14th and Louisiana.
November 12, 1985
SUBDIVISIONS
Item No. 10 - Continued
3. Close alley one-half way south of 13th with
barricade of trees and shrubs and place a
hammer -head turnaround south of barricade.
E. Analysis
Staff is generally supportive of the project, but it is
awaiting specific comments from the Capitol Zoning
District staff relative to uses, structural
involvement, parking, street closures and design
elements. Everything south of 13th Street is in the
Capitol Zoning District. 163 parking spaces are
needed.
F. Staff Recommendation
Reserved until further comments received.
SUBDIVISION COMMITTEE REVIEW:
Mr. Ron Newman of the Capitol Zoning District and the
applicant were present. Mr. Newman suggested that the lot
in the southwest corner be eliminated from the proposal and
felt that parking was sufficient for the overall project.
Staff requested one -lot final plat for the various lots.
PLANNING COMMISSION ACTION:
Mr. David Fitzhugh of Madison Savings and Loan and the
architect, represented the application. Mr. Ron Newman of
the CZD was present. One concerned property - owner was in
attendance.
Staff reported that Henk Koornstra, the traffic Engineer,
requested -that the plan be modified to allow for no exiting
in the intersection of Louisiana and 13th Street and no
backing into Main Street. Staff reported that the applicant
had failed to file the petition to close the alley between
12th and 14th Streets and the plan shall be revised to
delete the western most parking lot as requested by
Mr. Ron Newman. Mr. Newman explained that he had requested
deletion of the parking lot because of its encroachment into
the immediate residential area.
The main issue discussed involved a title dispute.
Mr. Robert Traylor, President of Arkansas Real Estate
Development, Inc., stated that he owned some apartments near
13th and Louisiana and he was not notified of the
incorporation of his property within the project. He
currently has a lawsuit pending against a Ms. Camino who
November 12, 1985
SUBDIVISIONS
W
Item No. 10 - Continued
sold the property after default. He claims to have
repossessed the property.
Mr. Fitzhugh stated that Madison Guaranty was the owner.
The City Attorney present advised against any Commission
action on the property until after the dispute was settled,
which would be in the next two or three months.
Mr. Fitzhugh requested action on the proposal provided he
delete the disputed portion. Due to the possible loss of
parking spaces, the Commission felt that staff needed to
reevaluate a revised proposal so as to ascertain -possible
impacts to the area.
A motion for deferral for two weeks was made and passed by a
vote of 9 ayes, 0 noes, 2 absent.
t