HomeMy WebLinkAboutS-0613-A Staff AnalysisNovember 12, 1985
SUBDIVISIONS
Item No. 6 - File No. 613
-NAME:
LOCATION:
DEVELOPER:
_Edward Lynn/Henderson
Properties 0
3800 North May,SOK uite to 5050
12
Oklahoma City,
(405) 949-9100
Area: 2.41 acres
Los Cuartos Airport Addition
Preliminary/Site Plan Review
SW Corner of I-440 and
Bankhead Drive
ENGINEER:
Tim Johnson/Smith, Roberts,
Johnson
3800 North May, Suite 500
Oklahoma City, OK 73112
(405) 755-2094
No. of Lots: 2
Ft. New St.: 0
ZONING: "L-3--
PROPOSED USES: Hotel ( Lot 1)/Office ( Lot 2 )
A. Proposal
1. The platting of 2.41 acres into two lots for
commercial use and site plan review of a multiple
building site for a hotel with 128 units.
2e Proposed parking consists of 143 spaces-
B. Engineering Comments
1. Show detention calculations and area.
2. Right-of-way and boundary street improvements on
East 33rd.
3, Right-of-way and boundary street improvements on
boundary street on west side of property.
4. Main driveway and access to front is poor.
Coordinate redesign traffic engineer.
5. Landscape buffers inadequate.
November 12, 1985
SUBDIVISIONS
Item No. 6 - Continued
C. Analysis
This is a dual submission consisting of a preliminary
and site plan. Since the property is zoned "C-3," both
lots must meet the 14,000 square foot requirement.
The applicant is asked to tie down the internal access
to the restaurant with the plat and clarify a total
square footage and square footage per building. Staff
came up with a total of 20,160 square feet.
D. Staff Recommendation
Approval.
SUBDIVISION COMMITTEE REVIEW:
The applicant was asked to meet with Engineering to:
(1) resolve Engineering comment No. 3 since the applicant
felt that it's impractical to build this street; (2) resolve
location of drive at least 100 feet from the corner or
request for a variance; (3) provide landscaping strip and
screening in conformance with the City's Landscape
Ordinance; (4) provide additional data on site plans;
(5) show platted access easement between Lots 1 and 2.
PLANNING COMMISSION ACTION:
Staff recommended approval of the plat and waiver, subject
to working out the street issue with Engineering.
Mr. Tim Johnson represented the developer. He stated that
he had been unable to reach Engineering to work out problems
with the riffel street.
A motion for approval was made and passed, subject to the
resolution of the street issue before the building permit is
received. The vote: 9 ayes, 0 noes, 1 absent and
1 abstention.