HomeMy WebLinkAboutS-0612 Staff AnalysisNovember 12, 1985
SUBDIVISIONS
Item No. 13 - File No. 612
NAME:
LOCATION:
DEVELOPER:
DeLan International
Houston, TX
Area: 40 acres
ZONING: "C-3"
PROPOSED USES:
Park Plaza Shopping Center/
Site Plan Review
Markham at University
VMn TATV VD .
Garver & Garver Engineers
P.O. Box C-50
Little Rock, AR 72203
376-3633
No. of Lots:
Commercial/office
PLANNING DISTRICT:
CENSUS TRACT:
VARIANCE REQUESTED:
A. PROPOSAL:
1 Ft. New St.: 0
1. To expand and improve an existing mall,
constructed parking deck and a future office
building on 40 acres; and to add a traffic
light near Lee and University.
2. PROJECT DATA:
A. EXISTING SPACE:
Dillards.. ...........198,000 square feet
1 Other Retail......... 215,56 square feet
Restaurant............ 21,944 square feet
Office.....:..........8,904 square feet
443,904 square feet
B. PROPOSED DEVELOPMENT:
Existing Dillards...........
190,000
square
feet
Additional Dillards..........
7,099
square
feet
Other Retail...............247,895
square
feet
Cinema ................ .....
�18,900
square
feet
Total mall area ............
540,824
square
feet
Future office building ......
50,000
square
feet
(Estimate only)
November 12, 1985
SUBDIVISIONS
Item No. 13 - Continued
Deck and grade parking ........1,067 spaces
Total site parking.............2,302 spaces
3. ENGINEERING COMMENTS:
(A) A traffic study was requested by the City
Engineer and other developers during a meeting
over a month ago. Without this study, the
Engineering staff will not consider this plan
for a full review at this time.
(B) However, a very short look at a few major items
follows:
i. Redesign main entrance into Dillards off
West Markham to proper standards (Ernie
Peters and Associates are reviewing these
items at this time).
ii. A traffic light on University between Lee
Street and West Markham is not desirable due
to difficulty in progression time with three
lights in one block.
iii. Leave existing access drive open at the
corner of West Markham and University Avenue.
The weaving traffic lane can be redesigned on
the northwest corner to make the intersection
work more efficiently.
iv. The narrow drive north of the proposed
parking deck as well as the narrow, sharp
radius drives around the east end of the
center (new Dillards store) provides for poor
circulation.
14. ANALYSIS:
This submission is viewed as an improvement of
existing facilities. Of course, the major issue
will relate to the traffic flow. The developer
will need to work closely with the City's Engineers
on this issue.
The applicant is planning to tear down an existing
savings and loan building and provide a new office
building in the future and a more northern location
on the site. Staff would like to see some type of
plans for the treatment of .the private drive on the
northern property line.
November 12, 1985
SUBDIVISIONS
Item No. 13 - Continued
Indicate whether landscaping or a retaining wall
will be provided. Staff also requests negotiation
of redesign or elimination of the access drive off
Markham through the Engineering Department, in
conjunction with elimination of the First Federal
Building.
5. STAFF RECOMMENDATION:
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
The applicant explained that landscaping would be provided
along the north and agreed to comply with staff's
suggestion.
Engineering will present the results of a traffic study at
the public hearing.
PLANNING COMMISSION ACTION!
The applicant was present. Traffic gave its support to the
project. A motion for approval was made and passed by a
vote of: 11 ayes, 0 noes and 0 absent.
November 12, 1985
SUBDIVISIONS
Item No. A - File No. 612
NAME:
r.nrnTrnu -
DEVFr.OPF.R
DeLan International
Houston, TX y
Area: 40 acres
ZONING: 11C-3"
PRnPORFn IMPIQ -
Park Plaza Shopping Center/
Site Plan Review
Markham at University
ENGINEER:
Garver & Garver Engineers
P.O. Box C-50
Little Rock, AR 72203
376-3633
No. of Lots: 1 Ft. New St.: 0
Commercial/office
PLANNING DISTRICT:
CENSUS TRACT:
1 VARIANCE REQUESTED:
A. PROPOSAL:
1. To expand and improve an existing mall,
constructed parking deck and a future office
building on 40 acres; and to add a traffic
light near Lee and University.
2. PROJECT DATA:
A. EXISTING SPACE:
Dillards..............198,000 square feet
Other Retail......... 215,56 square feet
Restaurant............ 21,944 square feet
Office ................ 8,904 square feet
443,904 square feet
B. PROPOSED DEVELOPMENT:
Existing Dillards.......... 190,000 square feet
Additional Dillards..........7,099 square feet
Other Retail...............247,895 square feet
Cinema ......................18,900 square feet
Total mall area............540,824 square feet
Future office building ...... 50,000 square feet
(Estimate only)
November 12, 1985
SUBDIVISIONS
Item No. 13.,:4-- Continued
Deck and grade parking ... ..... 1,067 spaces
Total site parking.— .........2,302 spaces
3. ENGINEERING COMMENTS:
(A) A traffic study was requested by the City
Engineer and other developers during a meeting
over a month ago. Without this study, the
Engineering staff will not consider this plan
for a full review at this time.
(B) However, a very short look at a few major items
follows:
i. Redesign main entrance into Dillards off
West Markham to proper standards (Ernie
Peters and Associates are reviewing these
items at this time).
ii. A traffic light on University between Lee
Street and West Markham is not desirable due
to difficulty in progression time with three
lights in one block.
iii. Leave existing access drive open at the
corner of West Markham and University Avenue.
The weaving traffic lane can be redesigned on
the northwest corner.to make the intersection
work more efficiently. -
iv. The narrow drive north of the proposed
parking deck as well as the narrow, sharp
radius drives around the east end of the
center (new Dillards store) provides for poor
circulation.
4. ANALYSIS:
This submission is viewed as an.improvement of
existing facilities. Of course, the major issue
will relate to the traffic flow. The developer
will need to work closely with the City's Engineers
on this issue.
The applicant is planning to tear down an existing
savings and loan building and provide a new office
building in the future and a more northern location
on the site. Staff would like to see some type of
fa plans for the treatment of the private drive on the
northern property line.
November 12, 1985
SUBDIVISIONS
Item No.�13 - Continued
Indicate whether landsca
• will be Ping or a retaining wall
Provided. Staff also requests negotiation
of redesign or elimination of the access drive Off'Markham through the Engineering department, in conjunction with elimination of the First Federal
Building.
5. STAFF RECOMMENDATION:
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
The applicant explained that landscaping would be provided
along the north and agreed to comply with staff's
suggestion.
Engineering will present the results of.a traffic study at
the public hearing.
PLANNING COMMISSION ACTION:
The applicant was present. Traffic gave its support to the
project. A motion for approval was made and passed by a
vote of: 11 ayes, 0 noes and 0 absent.