HomeMy WebLinkAboutS-0594-A Staff Analysis-April 25, 1996
ITEM NO • 2 FILE NO.: S-954-A
NAME: UNITED PROPERTIES SUBDIVISION, LOTS 1R AND 2 --
PRELIMINARY PLAT
LOCATION_: On the south side of Kanis Rd., approximately 0.1 mile
west of Bowman Rd., and extending southward with frontage on
Bowman Rd., approximately 400 feet south of Kanis Rd.
DEVELOPER:
ENGINEER:
Pat McGetrick
UNITED PROPERTIES MCGETRICK ENGINEERING
c/o 11225 Huron Ln. Suite 200 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
223-9900 223-9900
AREA: 6.71 ACRES NUMBER OF LOTS: 2 FT. NEW STREET:
ZONING• PCD & R-2
PLANNING DISTRICT:
CENSUS TRACT: 42.07
VARIANCES REQUESTED:
PROPOSEDVgEESS: Mini -Warehouse, and
general office and
enclosed retail uses
Ellis Mountain (18)
None
L
Planning Commission review of a proposed PCD was conducted on May
13, 1986, with the PCD being established by the Board of
Directors on June - 3,---1986, in Ordinance- No.-15r10-5 -- -This -action .--- -
resulted from a request, -to add buildings to an already existing
mini -warehouse facility. The facility had been in existence
prior to being annexed into the City, and was a "non -conforming"
use. The area involved was 2.57 acres. There were 5 existing
buildings, with a total of 37,275 square feet of mini -warehouse
area. Two additional buildings, with a total floor area of
16,140 square feet was proposed at that time. Dedication of 10
additional feet of right-of-way along Kanis Rd. was provided by
Quitclaim deed.
April 25, 1996
SUBDIVISION
ITEM 4. 2 (Cont.) FILE NO. �j:954-A
B . EXISTIyg C DITI N :
The site is developed. Most of the area designated at Lot 1R
is the location of the Kanis Mini -Storage facility. The
remaining portion of Lot 1R, plus the area designated as Lot 2,
is a residential lot which has had a residential structure
located on it for decades.
The topography of the site rises from an elevation along
Bowman Rd. of 432 feet MSL (Mean Sea Level), to an elevation
of 480 at the west edge of the property. There are existing
retaining walls along the west property line and at the
southeast corner of Lot 1 to permit the mini -warehouse
development of the site. There is a 50 foot buffer
designated along the west property line of the 1992-added
tract (which abuts residential lots), and a 20 foot buffer
along the south boundary of the tract.
The existing zoning of the property is PCD for the original
Lot 1, and R-2 for the remaining area. To the south and to
the west of the 1992-added tract is R-2 zoned property. To
the west of the original 1986 tract is "Bank and Business
Forms" in a PCD. At the southwest corner of Kanis Rd. and
Bowman Rd. are non -conforming commercial uses in an R-2
zoned area. Across Bowman Rd. to the east is the skating
rink (also a non -conforming commercial use on R-2 zoned
land) and C-3 zoned property. Across Kanis Rd. to the north
is R-2 zoned land.
C. EN=TEERING/OTZLITY COMMENTS:
PUBLIC WORKS COMMENTS:
The replat of Lot 1 necessitates dedication to Master
Street Plan standards of the right-of-way for and
Master'Street Plan pavement widening on Kanis Rd. An
additional 6 feet of widening is required for-Kanis
Rd., but -an "In -Lieu" contribution.versus construction
of the street improvements is recommended at this time.
The dedication of the additional right-of-way is to
include relocation of City owned utilities. It is
recommended that the applicant apply for a franchise
for the fence which is located on the City right-of-
way. (It is located within 35 feet of the centerline
of Kanis Rd.) Relocation of the fence will be at the
applicant's expense when Kanis Rd. is widened. The
required right-of-way is 45 feet from centerline of
Kanis Rd. for this Minor Arterial street.
3
April 25, 1996
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO. - 4-A
Public Works has noted that right-of-way dedication --is
required for both Kanis Rd. and Bowman Rd.; that one-half
street improvements (with a sidewalk) are required along
Bowman Rd.; and that, an "In -Lieu" payment be made for Kanis
improvements. Dealing with the fence along the Kanis Rd.
frontage of the site must be addressed at this time.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, subject
to the Public Works rights -of -way and street improvements
issues being addressed, and subject to either the fence
along Kanis Rd. being removed from the right-of-way or a
franchise being granted by the City.
SUBDIVISION COMMITTEE COMMENT:
(APRIL 4, 1996)
Mr. Pat McGetrick, the project engineer, was present. Staff
outlined the request to the Subdivision Committee members, and
reviewed with Mr. McGetrick and the Committee the deficiencies
and comments contained in the discussion outline. The Committee
reviewed the proposed preliminary plat, and discussed the issues
with Mr. McGetrick. David Scherer, with the Public Works staff,
discussed with Mr. McGetrick the right-of-way and street
improvements issues, as well as the fence issue along Kanis Rd.
Mr. McGetrick reported that he would make the needed changes in
the drawing and would supply staff with revised drawings and
information, as required. The Committee forwarded the
application to the full Commission for the public hearing.
April 25, 1996
ITEM 2 FILE NO.: S--954-A
NAME: UNITED PROPERTIES SUBDIVISION, LOTS 1R AND 2 --
PRELIMINARY PLAT
LOCATION: On the south side of Kanis Rd., approximately 0.1 mile
west of Bowman Rd., and extending southward with frontage on
Bowman Rd., approximately 400 feet south of Kanis Rd.
DEVELOPER:
ENGINEER:
Pat McGetrick
UNITED PROPERTIES MCGETRICK ENGINEERING
c/o 11225 Huron Ln. Suite 200 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
223-9900 223-9900
AREA: 6.71 ACRES NUMBER OF LOTS: 2 FT. NEW STREET:
ZONING• PCD & R-2
PLANNING DISTRICT:
CENSUS TRACT: 42.07
VARIANCES REQUESTED:
BACKGROUND•
PROPOSED USES:
Ellis Mountain (18)
None
Mini -Warehouse, and
general office and
enclosed retail uses
Planning Commission review of a proposed PCD was conducted on May
13, 1986, with the PCD being established by the Board of
Directors on June 3, 1986, in Ordinance No. 15,105. This action
resulted from a request to add buildings to an already existing
mini -warehouse facility. The facility had been in existence
prior to being annexed into the City, and was a "non -conforming -
use. The area involved was 2.57 acres. There were 5 existing
buildings, with a total of 37,275 square feet of mini -warehouse
area. Two additional buildings, with a total floor area of
16,140 square feet was proposed at that time. Dedication of 10
additional feet of right-of-way along Kanis Rd. was provided by
Quitclaim deed.
April 25, 1996
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: 5-954-A
Subsequently, on April 7, 1992, an amendment to the 1986-approved
PCD was proposed. This amendment added a 2.65 acre tract south
of the originally included property, and added 5 more buildings
totaling 31,620 square feet. Provision was made at that time to
add the area to the east of this additional tract, out to Bowman
Rd., a 1.49 tract, as future development area. Based on the
Planning Commission approval of a preliminary plat of the 5.22
site, a final plat was filed on August 10, 1992. This plat shows
an 80 foot right-of-way for Kanis Rd.
Included in the plat file for the final plat of the 5.22 acre
"Lot 1" tract is a letter from the City Engineer returning the
proposed Quitclaim deed for an additional 5 feet of required
right-of-way for Kanis Rd., rejecting its wording which required
the City to rebuild the existing fence along the Kanis Rd.
frontage of the site if the City required its removal from the
right-of-way. The City Engineer suggested that the property
owner apply for a franchise for the continued use of right-of-way
for the fence, but indicated that the owner would be responsible
for removal of the fence if the area were needed for future
street improvements. There is nothing after this date to
indicate that the Quitclaim deed was amended and submitted (and
filed) as required, nor that the franchise was requested.
STATEMENT OF PROPOSAL:
The applicant now requests inclusion of the 1.49 acre tract,
(which extends eastward from the east edge of the tract added to
the PCD in 1992, out to Bowman Rd.) into the plat area, for a
total land area of 6.71 acres. Lot 1R is proposed to include all
of the land area of the existing Lot 1, plus 102.27 feet eastward
onto the added tract. Lot 2 is to be the remaining portion of
the tract out to Bowman Rd. The applicant proposes to dedicate
25 feet of additional right-of-way along Bowman Rd. and to widen
Bowman Rd. to provide the required one-half (of a 60 foot) Minor
Arterial roadway. (No provision is made for additional right-of-
way nor street improvements along Kanis Rd.)
A. PROPO AL RE ❑EST:
Planning Commission review and approval of a preliminary
plat is requested.
2
April 25, 1996
UBDIVISION
ITEM NO • 2 [Cant.) _ FILE NQ.:
B. EXISTING NDITI
The site is developed. Most of the area designated at Lot 1R
is the location of the Kanis Mini -Storage facility. The
remaining portion of Lot 1R, plus the area designated as Lot 2,
is a residential lot which has had a residential structure
located on it for decades.
The topography of the site rises from an elevation along
Bowman Rd. of 432 feet MSL (Mean Sea Level), to an elevation
of 480 at the west edge of the property. There are existing
retaining walls along the west property line and at the
southeast corner of Lot 1 to permit the mini -warehouse
development of the site. There is a 50 foot buffer
designated along the west property line of the 1992-added
tract (which abuts residential lots), and a 20 foot buffer
along the south boundary of the tract.
The existing zoning of the property is PCD for the original
Lot 1, and R-2 for the remaining area. To the south and to
the west of the 1992-added tract is R-2 zoned property. To
the west of the original 1986 tract is "Bank and Business
Forms" in a PCD. At the southwest corner of Kanis Rd. and
Bowman Rd. are non -conforming commercial uses in an R-2
zoned area. Across Bowman Rd. to the east is the skating
rink (also a non -conforming commercial use on R-2 zoned
land) and C-3 zoned property. Across Kanis Rd. to the north
is R-2 zoned land.
C. ENGINEERING/UTILITY COMMENTS:
PUBLIC WORKS COMMENTS:
The replat of Lot 1 necessitates dedication to Master
Street Plan standards of the right-of-way for and
Master Street Plan pavement widening on Kanis Rd. An
additional 6 feet of widening is required for Kanis
Rd., but an "In -Lieu" contribution versus construct'_on
of the street improvements is recommended at this time.
The dedication of the additional right-of-way is to
include relocation of City owned utilities. It is
recommended that the applicant apply for a franchise
for the fence which is located on the City right-of-
way. (It is located within 35 feet of the centerline
of Kanis Rd.) Relocation of the fence will be at the
applicant's expense when Kanis Rd. is widened. The
required right-of-way is 45 feet from centerline of
Kanis Rd. for this Minor Arterial street.
3
April 25, 1996
SUBDIVISIDN
ITEM NO_: 2 Cont.) FILE NO.: S-954--A
Lot 2 will require dedication of right-of-way for
Bowman Rd. to minor arterial standards and one-half
street widening, including relocation of City -owned
utilities. (An "In -Lieu" is not recommended for this
frontage.) This widening will allow for vehicles to
get off the traveled lanes prior to accessing the
drive.
A grading permit is required.
The Stormwater Detention ordinance applies.
Southwestern Bell Telephone Co. will required a 5' easement
along the north, west, and south lot lines of Lot 2.
Little Rock Water Works comments that a pro-rata frontage
charge of $2.50/foot on Bowman Rd. or $12/foot on Kanis Rd.
applies. On -site fire protection may be required.
Little Rock Wastewater Utility comments that sewer is
located along Kanis Rd. and Bowman Rd. Sewer is also
located at the southwest corner of Lot 1R. Contact Little
Rock Wastewater Utility for details.
The Fire Department approved the plat.
D. ISSUES LEGAL TECHNICAL DESIGN:
No cover letter and no information sheet has been provided.
No request for a waiver from dedication of right-of-way or
street improvements is made for the Kanis Rd. frontage of
the site. No provision is made for dealing with the fence
which is located on right-of-way along the Kanis Rd.
frontage of the site.
Lot 2 has been changed to Lot "2R" on the revised plat
submitted following the Subdivision Committee meeting.
E. ANALYSIS•
From a technical aspect, the preliminary plat is complete;
it shows all required information.
4
April 25, 1996
SUBDIVISION
ITEM NO.: 2 Cont.)FILE NO.: S-954--A
Public Works has noted that right-of-way dedication. is,
required for both Kanis Rd. and Bowman Rd.; that one-half
street improvements (with a sidewalk) are required along
Bowman Rd.; and that, an "In -Lieu" payment be made for Kanis
improvements. Dealing with the fence along the Kanis Rd.
frontage of the site must be addressed at this time.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, subject
to the Public Works rights -of -way and street improvements
issues being addressed, and subject to either the fence
along Kanis Rd. being removed from the right-of-way or a
franchise being granted by the City.
SUBDIVISION COMMITTEE COMMENT:
(APRIL 4, 1996)
Mr. Pat McGetrick, the project engineer, was present. Staff
outlined the request to the Subdivision Committee members, and
reviewed with Mr. McGetrick and the Committee the deficiencies
and comments contained in the discussion outline. The Committee
reviewed the proposed preliminary plat, and discussed the issues
with Mr. McGetrick. David Scherer, with the Public Works staff,
discussed with Mr. McGetrick the right-of-way and street
improvements issues, as well as the fence issue along Kanis Rd.
Mr. McGetrick reported that he would make the needed changes in
the drawing and would supply staff with revised drawings and
information, as required. The Committee forwarded the
application to the full Commission for the public hearing.
PLANNING COMMISSION ACTION:
(APRIL 25, 1996)
The Chairman asked Bobby Sims, of the Staff, to present Item No.
2 on the agenda. Mr. Sims offered a brief comment which stated
that this item had been intended to be placed on the Consent
Agenda for approval. However, the owner has determined that
there are issues attendant to this plat filing that require
further discussion. These primarily have to do with the
improvement to Kanis Road and the right-of-way issues attendant
to that improvement. Mr. Sims pointed out for the record that
the sole reason for placing this on the regular agenda is to deal
with that right-of-way and improvement issue, and eventually a
franchise through Public Works Department for retention of an
existing chain link fence on the right-of-way after dedication.
Sims identified David Scherer, of Public Works, as the staff
person to address these improvements and right-of-way issues.
Mr. Scherer offered an overview of the project and its history
concerning when certain improvements were made on both the
5
April 25, 1996
SUBDIVISION
ITEM NO. 2 [Cant.) _FILE NO.-�4-A
building and the site and physical improvement in the right -of-
way of Kanis Road. He stated that part of this project began
even before it was annexed. On the original approval by the
Planning Commission and the City Board as a PCD for mini -
warehouses, there was a Master Street Plan requirement of 80 feet
total or 40 feet from the centerline. At that time the
improvement on pavements was one-half of a 48 foot roadway.
Since that time, the standards of a Master Street Plan have been
increased to a 90 foot right-of-way with one-half of a 60 foot
roadway improvement.
Mr. Scherer pointed out that the developer at that time did
provide the right-of-way and constructed the one-half street
improvements. The change in the Master Street Plan occurred
during 1988. He pointed out that in 1992 a developer came in
with a second phase of construction on this project on a tract of
land that proposed access to Bowman Road and would have no
immediate affect or access upon the Kanis frontage. At that
time, there was no assessment or even discussion on of requiring
improvements or additional right-of-way on Bowman. That plan
asked for deferral of the Bowman Road improvements until the
second phase of the project was constructed.
Scherer pointed out that the application now before the Planning
Commission consists of the original site and some seven
buildings, the five buildings of the second phase which came in
1992 and a new large building to be added to the total. All of
these will take access from Kanis Road. Scherer pointed out that
at this point that the developers have agreed to right-of-way
which would be 90 feet as opposed to 80 feet. However, the
disagreement comes in that the pavement requirement is no longer
24 feet from the centerline but 30 feet. He also pointed out
that the intersection of Bowman and Kanis is very near this
project. Indeed about a half block. Public Works has applied
for federal funding for improvements to this intersection and
signalization which will be impacted by the ability to provide
the right-of-way and the improvements. Therefore, the current
disagreement here between the City and this developer is the
additional 6 feet of pavement to bring this road to the standard
that is required currently for the Master Street Plan.
Scherer stated that he believed it is purely an issue of the
developer having constructed the city's Master Street Plan
requirements in an earlier time. At this time, he feels that it
is not his responsibility to add the additional 6 feet.
In response to a question from Commissioner Hawn about where the
new building would take access. David Scherer pointed out that
all of this complex would be utilizing the same Kanis Road access
point. The question was then posed about the fence and right-bf-
way. The fence issue was addressed by Scherer. He stated that
the fence was located along a property line derived from the
April 25, 1996
SUBDIVISION
ITEM NO.: 2 [Cont.] FILE NO.: 5--954--A
original dedication to an 80 foot right-of-way. At this time,
once the new right-of-way is dedicated the fence would be located
inside the new street alignment. Therefore, a franchise from the
City would be required to maintain that fence until such time as
the City requires its removal.
The Chairman then recognized Mr. Pat McGetrick, the engineer for
the project. Mr. McGetrick came forward and offered commentary
in support of the application. He stated that his developer
feels that he had complied with all of the city's requirements
for the Master Street Plan at an earlier time. They did
construct all that the City required, that being half of the 48
foot street, curb and gutter, and other improvements. He feels at
this time it is not appropriate for them to tear that out and
rebuild it. Simply just to build one more building on their
project site.
In a response to a question from a commissioner. Mr. McGetrick
referred to the illustration that he had presented. The response
that he offered had to do with the circulation, the access and
how the building that is proposed would tie in with the other
structures.
Bobby Sims, of the Staff, reminded the Commission that they would
not only need a motion to approve the preliminary plat but a
second motion to deal with the waiver requested by the applicant.
A brief discussion then followed involving David Scherer, of
Public Works, and several of the commissioners. Again discussing
the improvements, the intersection, and the relationship of this
project. Pat McGetrick, representing the applicant, injected a
thought, that, what the city is requiring here is the applicant
throw out the $15,000 dollars that was spent several years to
widen the street, and now spend an additional $15,000 dollars to
rebuild it 6 feet wider.
The Chairman asked for two motions to be presented, one on the
application as filed for the preliminary plat and the other or.
the applicant's request for waiver.
A motion was made to approve the preliminary plat as submitted
and revised to the staff recommendation. This motion was
approved by a vote of 10 ayes, 0 nays, and
1 absent. The second motion was offered dealing with the waiver
request placed in the form of and motion that the developer make
the improvements. A vote on this motion produced 10 ayes,
0 nays, and 1 absent. Therefore, the waiver was denied and
improvement are required.
7
April 25, 1996
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-954-A
Ed. Note/RW
After the meeting staff was informed by Mr. McGetrick that his
developer has decided to provide the in -lieu on Kanis Road and
not pursue a waiver.
8