HomeMy WebLinkAboutS-0590-F Staff AnalysisITEM NO.: 4. S-590-F
NAME: EZ Mart Store #607 Subdivision Site Plan Review
LOCATION: located at 11911 Mara Lynn Road
Planning Staff Comments:
1. Provide notification of the property owners located within 200-feet of the site,
including the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than June 26, 2013. The Office of
Planning and Development must receive the proof of notice no later than July 5,
2013.
2. Provide details of the proposed signage plan including locations and total
percentage of the fagade to be covered with signage. Canopy signage should also
be addressed as a part of the signage plan.
3. Is the 15-foot side and rear setbacks platted or indicated as zoning setback lines?
4. Section 36-301(e) states front yard setbacks abutting streets are to be a minimum of
25-feet. Setbacks on the rear yards may be 15-feet. The existing building is located
10.48-feet from the eastern property line and the new expansion area is indicated at
14.13-feet.
5. The plan indicates a 508 square foot addition to the store and a 1094 square foot
addition to the gas pump canopy.
6. The site plan indicates a billboard on the eastern perimeter near the driveway on N.
Bowman Road.
7. Provide the route on the fuel truck and the area for off-loading of fuel on the site
plan.
8. Someone must come by the office, 723 West Markham Street, to pick up a "Site
Plan Review" sign and post on the property.
Variance/Waivers: A variance from Section 36-301(e) to allow the encroachment of
the building into the rear yard setback.
Public Works Conditions:
1. Bowman Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. A 20 foot radial dedication of right-of-way is required at the intersection of Bowman
Road and Mara Lynn Road.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
4. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the
private improvements located in the right-of-way.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to the project.
Item # 4
Entergy: Entergy conditionally approves this plan. The northeast corner of the store
addition will be close to an existing primary line, but appears to be far enough away to
allow construction to proceed. Entergy would like to meet on -site to discuss details so
work can proceed safely and adjustments made if necessary. Contact Entergy for
additional information at 954-5158.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. No objections. All Central Arkansas Water requirements in effect at the time of
request for water service must be met.
2. Contact Central Arkansas Water regarding the size and location of the water meter.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
5. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense.
6. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
County Planning: No comment.
CATA: The site is located % mile from CATA Bus Route #5.
Parks and Recreation: No comment received.
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. All fencing, dumpster enclosures, striping (parking), and landscaping should be in
good condition and/or replaced and repaired with this application.
Item # 4.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, June 26, 2013.
Item # 4.
October 3, 2013
ITEM NO.: A
NAME: EZ Mart Store #607 Subdivision Site Plan Review
LOCATION: Located at 11911 Mara Lynn Road
DEVELOPER:
EZ Mart Store Inc.
517 Falvey
Texarkana, TX 75501
SURVEYOR:
South Point Surveying PLLC
2109 Stoney Creek Drive
Little Rock, AR 72211
AREA: 0.989 acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT
FILE NO.: S-590-F
NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
C-3, General Commercial District
2 — Rodney Parham
22.09
VARIANCE/WAIVERS: A variance from Section 36-301(e) to allow the encroachment
of the building into the rear yard setback.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The request is for a subdivision site plan review to allow the existing convenience
store to expand the building envelope and to allow the fuel canopy to also be
expanded. The site plan includes a 13-foot by 40-foot building expansion along
the northern portion of the building. The fuel pump canopy is currently 24-feet by
88-feet and will be reconstructed as a 44-foot by 76-foot canopy. Additional
fueling islands will be added to the site with the redevelopment.
The existing building is located 10.48-feet from the southern property line and
18.37-feet from the eastern property line. With the proposed expansion the
building setback along the eastern perimeter (rear) will be 14.13 feet. The
ordinance typically requires the placement of a 15-foot rear yard setback.
October 3, 2013
SUBDIVISION
ITEM NO.: A (Cont.)
B. EXISTING CONDITIONS:
FILE NO.: S-590-F
North Bowman Road has developed with retail shopping and restaurant uses.
The area to the north has developed with attached single-family homes. The
area to the east has developed with multi -family housing. The site has driveway
access from North Bowman Road and Mara Lynn Road. Both streets have been
constructed to Master Street Plan standard including curb, gutter and sidewalk.
C. NEIGHBORHOOD COMMENT
As of this writing, staff has not received any comment from area residents. All
property owners located within 200-feet of the site along with the Woodlands
Hills/Aspen Highland Neighborhood Association were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Bowman Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2. A 20 foot radial dedication of right-of-way is required at the intersection of
Bowman Road and Mara Lynn Road.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
4. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for the private improvements located in the right-of-way.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to the project.
Entergy: Entergy conditionally approves this plan. The northeast corner of the
store addition will be close to an existing primary line, but appears to be far
enough away to allow construction to proceed. Entergy would like to meet
on -site to discuss details so work can proceed safely and adjustments made if
necessary. Contact Entergy for additional information at 954-5158.
Center -Point Enemy: No comment received.
AT & T: No comment received.'
2
October 3, 2013
SUBDIVISION
ITEM NO.: A
Central Arkansas Water:
FILE NO.: S-590-F
1. No objections. All Central Arkansas Water requirements in effect at the time
of request for water service must be met.
2. Contact Central Arkansas Water regarding the size and location of the water
meter.
3. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
4. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
5. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
6. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
CATA: The site is located '/4 mile from CATA Bus Route #5.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAUDESIGN:
Plannina Division: No comment.
Landscape.
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
3
October 3, 2013
SUBDIVISION
ITEM NO.: A (Cont.) FILE NO.: S-590-F
2. All fencing, dumpster enclosures, striping (parking), and landscaping should
be in good condition and/or replaced and repaired with this application.
G. SUBDIVISION COMMITTEE COMMENT: (June 20, 2013)
The applicant was not present. Staff presented an overview of the item stating
there were few outstanding technical issues associated with the request. Staff
stated they would work with the applicant to resolve their concerns prior to the
final analysis for the item. There was no further discussion of the item. The
Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant has worked with staff to address their concerns from the
June 20, 2013, Subdivision Committee comments. The applicant has indicated
there will not be a change to the proposed signage plan for the site. The
applicant has also indicated the fuel trucks will enter the site from Bowman Road
and exit onto Mara Lynn Road.
The request is for a subdivision site plan review to allow the existing convenience
store to expand the building envelope and to allow the fuel canopy to also be
expanded. The site plan includes a 13-foot by 40-foot building expansion along
the northern portion of the building. The fuel pump canopy is currently 24-feet by
88-feet and will be reconstructed as a 44-foot by 76-foot canopy. Additional
fueling islands will be added to the site with the redevelopment.
The existing building is located 10.48-feet from the southern property line and
18.37-feet from the eastern property line. There is not setback required along
the southern property line (side) and a 15-foot setback is required along the
eastern property line (rear). With the proposed expansion the building setback
along the eastern perimeter (rear) will be 14.13 feet. To allow the rear yard
setback as proposed will require a variance from Section 36-301(e). Staff is
supportive of the building setback as proposed.
Staff is supportive of the request. Staff does not feel the addition to the existing
fuel canopy or the existing convenience store building will significantly impact the
development or the area. Staff feels the development as proposed is
appropriate.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
CI
October 3, 2013
SUBDIVISION
ITEM NO.: A
FILE NO.: S-590-F
Staff recommends approval of the variance requests from Section 36-301(e) to
allow the encroachment of the building into the rear yard setback.
PLANNING COMMISSION ACTION: (JULY 11, 2013)
The applicant was not present. There were no registered objectors present. Staff
presented the item stating the applicant had failed to provide notification of the property
owners within 200-feet as required by the Commission's By-laws. Staff presented a
recommendation of deferral of the item to the August 22, 2013, public hearing.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 9 ayes,
0 noes and 2 absent.
STAFF UPDATE:
The applicant failed to notify property owners as required by the Commission's By-laws.
Staff recommends deferral of the item to the October 3, 2013, public hearing.
PLANNING COMMISSION ACTION- (AUGUST 22, 2013)
The applicant was not present. There were no registered objectors present. Staff
presented the item stating the applicant had failed to notify property owners as required
by the Commission's By-laws. Staff presented a recommendation of deferral of the item
to the October 3, 2013, public hearing.
There was no further discussion of the item. The Chair entertained a motion of approval
of the item as presented by staff. The motion carried by a vote of 8 ayes, 0 noes and
3 absent.
STAFF UPDATE:
The applicant has provided notification to the property owners located within 200-feet of
the site as required by the Commission's By-laws. To staff's knowledge there are no
remaining outstanding technical issues associated with the request. Staff continues to
recommend approval of the request subject to compliance with the comments and
conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff
recommends approval of the variance requests from Section 36-301(e) to allow the
encroachment of the building into the rear yard setback.
F1
October 3, 2013
SUBDIVISION
ITEM NO.: A (Cont.) FILE NO.: S-590-F
PLANNING COMMISSION ACTION: (OCTOBER 3, 2013)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented a recommendation of approval of the
variance requests from Section 36-301(e) to allow the encroachment of the building into
the rear yard setback.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 8 ayes,
0 noes, 2 absent and 1 open position.